WEBER ROAD I55 RECONSTRUCTION Illinois Department of Transportation
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Weber Road @ I-55 Normantown Rd. to 115 th St. Will County Division of Highways Villages of Romeoville and Bolingbrook, Illinois Contract 60 X 10 Informational Meeting October 25, 2018 – 4: 00 PM 1
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Rodeo Dr/Remington Blvd OVERALL PROJECT LOCATION NTS Remington Blvd/Windham Pkwy Total length: 1. 55 miles Lakeview Dr Village of Romeoville Village of Bolingbrook Will County Normantown Road 2
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Contracts Overview � � Contract 62 F 12 – Advance Tree Removal Contract o Project Letting Date – 6/16/2017 o Project Completion Date - 11/22/2017 – Project Completed Contract 60 X 10 – Main Contract o Project Letting Date – 3/09/2018 – Construction Underway o Project Completion Date - 8/6/2021 3
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation CONTRACT COSTS � 62 F 12 – Tree Removal � 60 X 10 – Main Contract � Totals = $ 68, 424. 00 $ 47, 970, 125. 23 $ 48, 038, 549. 23 4
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Proposed Improvements � Reconstruct Weber Rd – 1. 55 miles � Weber Rd - 6 Lanes � Reconstruct I-55 Ramps � Dual Bridge Structures � Interconnected traffic signals through the interchange � Sidewalk and 10’ Wide Shared-Use Path � Retaining Wall installation � Continuous LED Roadway Lighting with 4 High Mast Light Towers � Enclosed Drainage System with In-Line Detention � Overhead Sign Structures � Signing and Pavement Markings � CCTV Cameras and Fiber-optic Connection � Intersection Improvements at Normantown Rd. , Rodeo Dr/Remington Blvd & Remington Blvd/Windham Pkwy 5
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Proposed Improvements – Normantown Rd. • • • 3 Through Lanes in each direction on Weber Rd. New dual left turn lanes for SB & EB traffic Right turn lanes for 3 legs of intersection 6
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation FENCE STONE SOUND WALLS Adjacent to Residential Areas 7
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Pavement Design � Weber Road Mainline o PCC Pavement 10 -1/4” (Jointed) o Aggregate Subgrade 12” � Expressway Ramps – HMA Pavement (Full Depth), 12 -1/4” ○ Polymerized HMA Surface Crs, 2” ○ Polymerized HMA Binder 2 -1/4” ○ HMA Binder Course 8” ○ Aggregate Subgrade 12” � Side Street Pavement Widening & Resurfacing ○ HMA Surface Crs, 1 -1/4” ○ Polymerized HMA Leveling Binder 3/4” ○ HMA Binder Course 8 -3/4” ○ Aggregate Subgrade 12” 8
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Who has heard of a Diverging Diamond Interchange? 9
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation 10
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Diverging Diamond Interchange – How To Drive a DDI 11
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Traffic Lanes Open During Construction � Pre-Stage – Off-Peak lane closures � Stage 1 – 2 lanes open each way NB & SB Weber � Stage 2 – 2 lanes open each way NB & SB Weber � Stage 3 – 2 lanes open each direction on Weber � Stage 4 – Partial Ramp closures on I-55 for 9 days � Cleanup & Punchlist – Off-Peak lane closures 12
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Pre-Stage Work � Median removal and temp pavement � Temporary Traffic Signals � Temp Storm Sewer � Utility Relocation � Now to Mid-Late June 2019 13
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Stage 1 � Traffic on east side, Normantown to 115 th � West half of Weber Rd. Reconstructed � New northbound bridge constructed � Ramp Reconstruction � July 2019 to June 2020 14
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Stage 2 Traffic on west side, Normantown to 115 th East half of Weber Rd. Reconstructed Reconstruct existing bridge deck for future southbound traffic � Ramp Reconstruction � June 2020 to May 2021 � � � 15
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Stage 3 Traffic on new pavement, Normantown to 115 th � Construct new medians � Complete ramp reconstruction � Complete sidewalk and multi-use-path in bridge area � May 2021 to August 2021 � 16
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Stage 4 Traffic on new pavement, Normantown to 115 th Partial I-55 exit ramp closures for 9 days requiring detours � July 2021/August 2021 � � 17
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation SB I-55 Exit Ramp Detour 18
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation NB I-55 Exit Ramp Detour 19
WEBER ROAD @ I-55 RECONSTRUCTION Illinois Department of Transportation Questions ? 20
- Slides: 20