Utility Installation Review UIR System InternetBased Utility Permit

Utility Installation Review (UIR) System Internet-Based Utility Permit Implementation Transportation Operations Group 1

Why is It Important? • Large number of utilities within the ROW • Thousands of utility permits per year • Hundreds of utility agreements per year • Institutional memory at Tx. DOT • Quality of information provided by utilities • TTI Research Project 0 -2110 üPrototype GIS-based utility inventory model üPrototype Internet-based utility permitting system Transportation Operations Group 2

Workflow Diagram - Overview Submitting • Notice of Proposed Installation Reviewing • Approval/Pre-construction • 48 -hr Notification • Traffic Control Plan Construction Post-construction • As-Built Certification Transportation Operations Group 3

Workflow Diagram (Part 1) Submitting Reviewing Approval Transportation Operations Group 4

Workflow Diagram (Part 2) Pre-construction Construction Post-construction Transportation Operations Group 5

User System Requirements • Desktop/Laptop with Pentium Processor or higher • Internet Explorer 6. 0 • Adobe Acrobat Reader 6. 0 • Internet connection • Email account • UIR active account Transportation Operations Group 6

Major System Functionality • Database-driven • Interactive GIS-based permit location • Permit event and document tracking • PDF file conversion • Utility company/DOT user management • Tabular and map-based reports • Performance measures Transportation Operations Group 7

Benefits • Automation • More thorough, faster reviews • Reporting and accountability • Institutional memory • Document retention practices Transportation Operations Group 8

Challenges • Garbage in / garbage out … üAutomation does not “automatically” result in better, more reliable deliverables • DOT and utility company training • Utility company compliance üUtility Accommodation Rules üNotification to DOT prior to construction Transportation Operations Group 9

Additional Information https: //apps. dot. state. tx. us/uirpro/ http: //uir. tamu. edu/uirdemo/ (demo) • Online help system • User manual • Training materials Cesar Quiroga – TTI (RS): c-quiroga@tamu. edu, 210 -731 -9938 Jesse Cooper – ROW (PD): jcoope 2@dot. state. tx. us, 512 -416 -2874 John Campbell – ROW (PC): jcampbel@dot. state. tx. us, 512 -416 -2909 Transportation Operations Group 10
- Slides: 10