US LHC Accelerator Research Program bnl - fnal- lbnl - slac TQC 02 Assembly

US LHC Accelerator Research Program bnl - fnal- lbnl - slac TQC 02 Assembly Status R. Bossert April 4, 2007 LARP Teleconference April 3, 2007 TQC 02 Construction Status

TQC Mechanical Structure LARP Teleconference April 3, 2007 TQC 02 Construction Status 2

TQC Mechanical Structure LARP Teleconference April 3, 2007 TQC 02 Construction Status 2

TQC 02 Coil Measurements Before construction, TQC 02 coils were measured on a CMM,

TQC 02 Coil Measurements Before construction, TQC 02 coils were measured on a CMM, at lead end, in the body, and at return end. 16 17 18 19 Scale: 100 microns = LARP Teleconference April 3, 2007 TQC 02 Construction Status 3

Shim System for TQC 02 Full Length Iron Yoke Coil Midplane “Gap” = 0.

Shim System for TQC 02 Full Length Iron Yoke Coil Midplane “Gap” = 0. 40 mm is equal to coil oversize plus coil midplane shim Coil Midplane Shim = 200 um in body tapering to 0 um in ends. Measured coil oversize = 200 um (100 um per coil) in both body and ends LARP Teleconference April 3, 2007 Collar-yoke preload shim to be determined based on measured collar size. Bolted Skin Near Splice Body area LJ area TQC 02 Construction Status Splice area 4

TQC 02 Collaring TQC 02 was keyed using 8 passes and keys are fully

TQC 02 Collaring TQC 02 was keyed using 8 passes and keys are fully inserted. Strain gauge readings and collar deflection measurements have been taken. LARP Teleconference April 3, 2007 TQC 02 Construction Status 5

TQC 02 Expected Preload in Collared State Expected preload within TQC 02 coils after

TQC 02 Expected Preload in Collared State Expected preload within TQC 02 coils after collaring. LARP Teleconference April 3, 2007 TQC 02 Construction Status 6

FEA for Collar Deflections of TQC 02 LARP Teleconference April 3, 2007 TQC 02

FEA for Collar Deflections of TQC 02 LARP Teleconference April 3, 2007 TQC 02 Construction Status 7

Collar Deflections of TQC 02 Undeflected collar diameter is 7. 260 inches LARP Teleconference

Collar Deflections of TQC 02 Undeflected collar diameter is 7. 260 inches LARP Teleconference April 3, 2007 TQC 02 Construction Status 8

TQC 02 Coil Strain gauges 16 Bronze azimuthal gauge this side 38. 5 18

TQC 02 Coil Strain gauges 16 Bronze azimuthal gauge this side 38. 5 18 61 19 34 38. 5 Red numbers = bronze gauge readings after collaring 17 TQC 02 Looking From Lead End LARP Teleconference April 3, 2007 TQC 02 Construction Status 9

TQC 02 Strain Gauge Readings LARP Teleconference April 3, 2007 TQC 02 Construction Status

TQC 02 Strain Gauge Readings LARP Teleconference April 3, 2007 TQC 02 Construction Status 10

TQC 02 bore with midplane shim After keying, the midplane shim at the coil

TQC 02 bore with midplane shim After keying, the midplane shim at the coil 16/18 interface is out of position over a length of about 50 cm. TQC 02 will be decollared any coil damage will be assessed. If the coils are assessed to be undamaged, the magnet will be recollared. This will delay the schedule by about 8 working days. Lead end LARP Teleconference April 3, 2007 Gauge position TQC 02 Construction Status Return end 11

TQC 02 Yoke The TQC 02 bolted yoke has been pressed with control spacers

TQC 02 Yoke The TQC 02 bolted yoke has been pressed with control spacers installed, but without collared coil, then measured internally on a CMM, at the positions shown at 5 longitudinal positions. These measurements will be used to verify the yoke size, and to determine the final size of the collar-yoke shim. LARP Teleconference April 3, 2007 TQC 02 Construction Status 12

TQC 02 Assembly Status TQC 02 collared coil assembly has been completed, and all

TQC 02 Assembly Status TQC 02 collared coil assembly has been completed, and all measurements (collar deflection and strain gauges) have been taken. Shim system for TQC 02 is based on: a. FEA using an initial azimuthal MOE of coils of 20 GPa, with plastic deformation after first pressing. b. Coordinate machine measurements of coil size in free state. Collar deflection measurements indicate that preload is consistent with predictions. Mid-plane shim between two coils is out of place after collaring. Magnet will be de-collared and the coils assessed for damage. If it is determined that the coils are not damaged, TQC 02 will be re-collared and completed. Assembled yoke has been measured. Collar-yoke shim will be determined based on FEA coupled with measured sizes of collar and yoke diameters. LARP Teleconference April 3, 2007 TQC 02 Construction Status 13