URBAN IMPROVEMENT TRUST KOTA RAJASTHAN Rejuvenation of SAJIDEDA
URBAN IMPROVEMENT TRUST, KOTA, RAJASTHAN Rejuvenation of SAJIDEDA Nallah 10 th Oct , 2017
The Project • Length ~ 5. 0 KM. – Location: from Keshavpura cremation ground to Kishorepura Gate(Elevated road). • Irregular size small drain at multiple locations. An eye sore and health hazard for the city. • Carries municipal sewage and storm water. • Currently, it is in an environmentally degraded state.
EXISTING NALA
Objectives • To develop a walkway and Green belt in the periphery of Sajideda Nallah by making it environment friendly and enhancing aesthetics of the periphery and safely discharge of the municipal waste and storm water in Chambal river.
The Scope • Course correction / Strengthening – Improvement of natural drain carrying the municipal waste and storm water in the rocky strata, channelizing dry weather flow in a confined channel. • Provide Land Area Development plan along the Nallah – Develop two land parcels of more than 25000 Sqm each for landscaping in the proposed development for enhancing natural environment.
SAJIDEDA NALAH: PROPOSAL
PHASE- I
PHASE- I
PHASE- I
PHASE- I
PHASE- I
PHASE- I
PHASE- I
PHASE- I
PHASE- I
PHASE- II
Project Features TYPICAL CROSS-SECTION PROJECT COMPONENTS Storm Water Channel Plantation Landscape Gardens Sit Out Spaces Street Lights Security Camera Walkways Toilet Blocks
Basic Design Philosophy • The dry weather flow will be segregated in the small channel located preferably in center so that it is distanced from both the banks of the periphery, and walkways are proposed on the both sides of the channel. It will also improve the natural drain during monsoon. • As per estimation of municipal waste as per actual measured by NGT direction and storm water() discharge as well as flood discharge by Irrigation department(), the cross section of Nallah discharge channel has been finalised. • As per muncipal waste discharge
Advantages of Project • Safety: • Centrally confined linear channel with Municipal waste, will also result in enhancing velocity of water flow in drain. • With enhanced thrust velocity, the capacity of channel during monsoon will also increase. • Houses in low lying area around Nallah will come out of flooding risk. • The improved channel will reduce the chances of possible encroachment. • During the execution and after completion, the project will generate a source of employment. • Health: • Development of land scape and plantation all along the channel will improve overall environment of Kota. • Improved quality of water will be available.
SUCG THANKS
- Slides: 21