UPGRADED INJECTOR TEST FACILITY The recent highlights: • North wall shielding enhancements complete •

UPGRADED INJECTOR TEST FACILITY The recent highlights: • North wall shielding enhancements complete • COO review scheduled for Wednesday April 24

Tasks before running beam to HDIce for target commissioning • Mechanical design (Shaun Gregory):

Tasks before running beam to HDIce for target commissioning • Mechanical design (Shaun Gregory): HDIce related components (apertures, dump, catwalk) • Gun Group: pull vacuum from gun to HDIce target, run the new 200 k. V gun with CEBAF electrode • Survey and Alignment “ 2 B” alignment • Magnet group: wire up magnets, build a third trim-card rack • I&C: Cable-up the Me. V beamline - valves, ion pumps, viewers, BPMs, harps, water flow meters, interlocks, current monitors, …. • SSG install BLMs, MPS connections • Operations Software group: more screens, MPS system, UED, etc. , • Rad. Con. Group: document shielding requirements, install CARMs and electronics, neutron probe and rapid access system • Facilities: re-install the 480 VAC to HDIce inside Cave 2 • Safety and Approvals: OSP for roof tile removal (revision to address fall protection, waiting on George), OSP for Me. V beam (UITF commissioning plan), UITF Accelerator Operations Directive/Conduct of Operations Review, Accelerator Readiness review (setting date in June) • Beam through QCM to waist height dump (Kazimi, Gun Group) • Install, operate the raster magnets (C. Cuevas) • Re-install HDIce • Waiting on Final Shielding Design Package, delivered to and approved by SCMB. This relates to the PSS BCM credited control, is it needed? • Work with SRF, Cryo and Facilities to imagine CTF improvements to boost return flow, independent pressure control, etc. , to operate UITF at same time as CMTF and VTA 2

thanks Walt Akers

thanks Walt Akers