Upcoming Schedule Next week is a standby week (06/08 0800 – 06/17 0800) – Please get standby instructions to me by 1200 today – Beam off to Users Saturday at 0800 • Safety System tests will occur next week for some systems • Kautz Rd Substation power outage 06/11 0700 • MI (MI 10 & MI 20 -62) will be supervised access for Q 202 swap • We will discuss approving jobs after the 0900 meeting on Monday • This is not a maintenance period, so maintenance tasks will not be approved 1 Patrick Karns | Accelerator Status 06/07/2019
Safety System Tests System Linac – – Booster – – Grace Period End Test date Linac CDC, ESS, & Rad Monitors NTF CDC & Facility 6/23/19 6/24/19 6/10/19 Booster Rad Monitors Booster ESS 7/07/19 7/05/19 6/10/19 6/28/19 6/11/19 – MI-12 A ESS – MI-12 B ESS 6/28/19 6/11/19 Meson Beam line – Meson M 01 RMSS – Meson M 02 RMSS – Meson M 03 RMSS – Meson M 04 RMSS – Meson M 05 RMSS 6/28/19 6/28/19 6/12/19 6/12/19 Muon Campus – Muon Campus Pre-Target ESS – Muon Campus Pre-Vault ESS – Transport ESS Mid/US-DS BNB 2 Patrick Karns | Accelerator Status 06/07/2019
Kautz Road Sub-station (KRS) Repair Problem: • We have a fault condition for Kautz Road sub-station, negative battery ground. To fix this condition we must de-energize KRS The Plan: • Back-feed MI service buildings from MSS feeder 24. • Back-feeder 46 A from MSS for A 0 Compressor building, (MC-1 cryo). • However, feeder 82/85 pulsed power for MI 60 RF Anode supplies, will remain down for the duration of the repair, estimated 2 -3 days. Impacted Areas: • MI buildings and tunnels, MI 12 (BNB beam line enclosures), and A 0 Compressor building When: • Tuesday, June 11, 0700 HRS – 07: 00 HRS, Power down A 0 compressor building for 15 minutes to back-feed from MSS feeder 46 A at. (Can remain in this configuration until summer shutdown. ) – 07: 30 HRS, Switch-off MI service buildings for 20 minutes to back-feed from MSS feeder 24. – At the conclusion of the work, another 20 -minute outage will occur to switch KRS back to normal configuration. – The time and date will be determined by FESS after the repair is made and weather conditions permitting. – Power from the MSS will not be interrupted during the feeder manipulation. 3 Patrick Karns | Accelerator Status 06/07/2019
- Slides: 3