UNCLASSIFIED Los Alamos RHIC Program David M Lee

  • Slides: 15
Download presentation
UNCLASSIFIED Los Alamos RHIC Program David M. Lee Heavy Ion and Medium Energy 7

UNCLASSIFIED Los Alamos RHIC Program David M. Lee Heavy Ion and Medium Energy 7 February 2005 UNCLASSIFIED 7 Feb 2005

UNCLASSIFIED South Muon Arm - 2001 PHENIX North Muon Arm - 2002 MVD 2002

UNCLASSIFIED South Muon Arm - 2001 PHENIX North Muon Arm - 2002 MVD 2002 FCAL 2002 UNCLASSIFIED 7 Feb 2005

UNCLASSIFIED PHENIX The Muon Spectrometers South Muon Arm North Muon Arm South Muon Arm

UNCLASSIFIED PHENIX The Muon Spectrometers South Muon Arm North Muon Arm South Muon Arm prior to run 3 in retracted position. Visible is station 1 in the front of the magnet and the Mu. ID panels to the left. North Muon Arm prior to run 3 during the installation process. The scaffolding used to install the electronics is visible. UNCLASSIFIED 7 Feb 2005 3

UNCLASSIFIED PHENIX The Muon Cathode Strip Detectors Largest etched foil CSC in operation. 3

UNCLASSIFIED PHENIX The Muon Cathode Strip Detectors Largest etched foil CSC in operation. 3 gaps for total radiation length ~ 8. 8 x 10 -4 Largest CSC chambers in operation, 3. 3 m x 3. 3 m. 2 gaps using honeycomb technology Station 3 Station 2 UNCLASSIFIED 7 Feb 2005 4

UNCLASSIFIED PHENIX MVD half cylinder before run 3 Complete MVD prior to installation for

UNCLASSIFIED PHENIX MVD half cylinder before run 3 Complete MVD prior to installation for run 3. Visible are the strip detectors and kapton cables (red), the cooling plenum (white), and the power and control boards (green). The pad detectors are mounted in the end plates. UNCLASSIFIED 7 Feb 2005 5

UNCLASSIFIED Los Alamos Heavy Ion and Medium Energy Program Current Personnel Muon Spectrometers Barnes,

UNCLASSIFIED Los Alamos Heavy Ion and Medium Energy Program Current Personnel Muon Spectrometers Barnes, Brooks, Kunde, Leitch, Liu, Mc. Gaughey, Constantin(PD), Norman(PD), Puwar(PD), Sondheim, MVD Kunde, Norman, van Hecke, Boissevain Magnet Design and Simulation Sondheim Silicon Upgrade Kunde, Lee, Mc. Gaughey, van Hecke, Sondheim, Boissevain UNCLASSIFIED 7 Feb 2005 6

UNCLASSIFIED Phenix Muon and MVD Program Major Institutions Muon Los Alamos National Laboratory Oak

UNCLASSIFIED Phenix Muon and MVD Program Major Institutions Muon Los Alamos National Laboratory Oak Ridge National Laboratory PHENIX France Riken, Kyoto Korean Universities University of Colorado, UNM, NMSU MVD Los Alamos National Laboratory Yonsei University UNCLASSIFIED 7 Feb 2005 7

UNCLASSIFIED Los Alamos Heavy Ion Program PHENIX activities Detector Council Members: van Hecke(MVD), Brooks(past

UNCLASSIFIED Los Alamos Heavy Ion Program PHENIX activities Detector Council Members: van Hecke(MVD), Brooks(past muon), Leitch(past muon), Mc. Gaughey(past muon) Subsystem managers: Lee(muon mechanical) Executive Committee: Leitch (past) Institutional Board: Barnes Physics working groups: all, Brooks(heavy convenor) Paper writing: Brooks, Constantin, Kunde, Leitch, Liu, Mc. Gaughey, Norman, Puwar Internal paper review: Lee, van Hecke Period coordinator: Leitch (run 03, 04, 05) PHENIX Online Documentation: van Hecke Upgrades proposal: Kunde, Leitch, Mc. Gaughey, van Hecke Integration Engineering: Sondheim(muon), Boissevain(MVD) UNCLASSIFIED 7 Feb 2005 8

UNCLASSIFIED Los Alamos Heavy Ion Program PHENIX activities Organized Annual Muon Workshop in Santa

UNCLASSIFIED Los Alamos Heavy Ion Program PHENIX activities Organized Annual Muon Workshop in Santa Fe in June, 3 days with invited theory talks 2003 – 50 attendees 2004 – 65 attendees 2005 > 50 attendees Organized VTX workshop on triggering Panic organizing Committees Organized Muon Workshop in BNL February 2005 Convenor of RHIC II white paper subcommittee – Leitch Author of p. A section of PHENIX decadal plan – Leitch Host for students, postdocs, staff for physics analysis Minjung Kweon Imran Younis Woojin Park Nicki Brunner Xiaorong Wang Hiroki Sato Hugo Pereria Vasili D Raphael Granier de Cassagnac Sean Kelly UNCLASSIFIED 7 Feb 2005 9

UNCLASSIFIED Los Alamos Heavy Ion Program Future Research Goals, FY 05 and beyond •

UNCLASSIFIED Los Alamos Heavy Ion Program Future Research Goals, FY 05 and beyond • Examine the suppression/enhancement of J/y production in Au-Au collisions from PHENIX Run-4 data relative to scaled yields from p-p and d-Au. Study the rapidity and p. T dependence to determine whether or not a quark gluon plasma is formed. • Extract open charm production in Au-Au collisions via single muon, dimuon, and possibly electron-muon channels to help disentangle J/y suppression due to the QGP and small x physics from nuclear medium effects. • Study gluon shadowing, parton energy loss and the Cronin effect in d-A and pp collisions. • Measure π, K and heavy flavor production at forward rapidity via their decays to muons. • Determine the reaction plane in Au-Au and Cu. Cu collisions at forward rapidities using the endcaps of the MVD. • Perform R+D for a silicon vertex detector upgrade. Begin design and construction of the detector mechanical structure and a silicon Endcap detector. • Calculate theoretical open charm production cross sections using the coloroctet and color- singlet models. UNCLASSIFIED 7 Feb 2005 10

UNCLASSIFIED Silicon Tracker Upgrade 80 cm 16 cm Current Design Concept Physics extension of

UNCLASSIFIED Silicon Tracker Upgrade 80 cm 16 cm Current Design Concept Physics extension of the present Muon Arms by clearly identifying the heavy quarks Enhance the single muon effort by identifying decay hadrons on event by event basis UNCLASSIFIED 7 Feb 2005 11

UNCLASSIFIED Silicon Tracker Upgrade Responsibilities • Mechanical Structure Coordination – Barrel and Endcap •

UNCLASSIFIED Silicon Tracker Upgrade Responsibilities • Mechanical Structure Coordination – Barrel and Endcap • Integrated approach extremely important • LANL has experience, E 789, L 3, SSC/GEM, MVD • Past relationship with experienced engineering team • PHX chip coordination – Endcap • Collaboration with FNAL (Ray Yarema) to modify existing FPIX 2 chip • VTX Engineering Integration UNCLASSIFIED 7 Feb 2005 12

UNCLASSIFIED Los Alamos Heavy Ion Program Resource Analysis Activity FY 05 FY 06> d-Au

UNCLASSIFIED Los Alamos Heavy Ion Program Resource Analysis Activity FY 05 FY 06> d-Au dimuon analysis (Leitch leads) 1. 0 staff, 0. 7 PD 0. 5 staff, 0. 5 PD Single muon analysis and pp ( M. Liu leads) 1. 0 staff, 0. 5 PD 1. 5 staff, 1. 5 PD Au-Au software and Analysis ( Brooks leads) 1. 0 staff, 0. 5 PD 1. 0 staff, 1. 0 PD Reaction plane analysis ( Norman (lead), Kunde, van Hecke) 0. 8 staff, 1. 0 PD 0. 25 staff, 0. 5 PD Routine operation of Muon and MVD systems 0. 5 staff 0. 25 staff Silicon Detector Upgrade(Kunde, Lee, Mc. Gaughey, van Hecke ) 1. 0 staff 2. 0 staff, 0. 5 PD Total KB 02 funds needed(including 11%M&S) 5. 3 staff, 2. 7 PD 5. 5 staff, 4. 0 PD KB 01 activities, see above 2. 0 staff, 1. 0 PD Total staff KB 01 and KB 02 and LDRD 7. 3 staff, 3. 7 PD 7. 5 staff, 5 PD UNCLASSIFIED 7 Feb 2005 13

UNCLASSIFIED Los Alamos Heavy Ion Program Budget Analysis Program FY 04 FY 05 FY

UNCLASSIFIED Los Alamos Heavy Ion Program Budget Analysis Program FY 04 FY 05 FY 06 FY 07 KB 01 3. 0 FTE $900 k $870 K $800 k $760 k-840 k KB 02 8. 0 FTE $2375 k $1928 k $1832 k-2024 k presidents budget FY 06 presidents budget ± 5% FY 05 Total staff KB 01 and KB 02 7. 3 staff, 3. 7 PD FY 06 7. 5 staff, 5 PD UNCLASSIFIED 7 Feb 2005 14

UNCLASSIFIED Los Alamos Heavy Ion Program Agenda Overview - Dave Lee, RHIC Physics Overview

UNCLASSIFIED Los Alamos Heavy Ion Program Agenda Overview - Dave Lee, RHIC Physics Overview - Mike Leitch, Single muons - Ming Liu, J/Psi - Melynda Brooks Jet Studies - Paul Constantin, Reaction Plane - Ben Norman, Silicon Upgrade - Hubert van Hecke 10 min 15 min 15 min UNCLASSIFIED 7 Feb 2005 15