UIP International Union of Wagon Keepers 14 National

  • Slides: 14
Download presentation
UIP – International Union of Wagon Keepers 14 National Associations

UIP – International Union of Wagon Keepers 14 National Associations

Results fleet data collection – wagon types UIP – approx. 224’ 000 RID class

Results fleet data collection – wagon types UIP – approx. 224’ 000 RID class 2 8% other 2% 2019 flat 12% covered hopper 6% open hopper 8% powder hopper 3% open highsided & open box 3% intermodal 16% car-carrier 5% RID but not class 2 22% non-RID 5% covered 7% coil 2%

UIP – stay informed Twitter Linkedin

UIP – stay informed Twitter Linkedin

The 4 th Railway Package - State of Play

The 4 th Railway Package - State of Play

One-Stop Shop (OSS) – Full Operation › Authorisation to place railway vehicles on the

One-Stop Shop (OSS) – Full Operation › Authorisation to place railway vehicles on the market as defined in the Reg. (EU) 2018/545 SSC VA ERTMS TA Since 16 June 2019 ERA OSS Availability 99, 4% NSAs

Vehicle Authorisation in Figures Updated 24/11/2019 November 290 241 PEB; 13 C 2 T;

Vehicle Authorisation in Figures Updated 24/11/2019 November 290 241 PEB; 13 C 2 T; 26 49 Ext Ao. U; 4 0 First; 3 Issued On going On hold Total On going + On hold PEB; 3 New; 2 PEB Ext Ao. U Renew; 1 First New First; 2 Total ISSUED C 2 T; 236 PEB First C 2 T Renew C 2 T

Invoicing Status (24. 11. 2019) • Invoiced – Vehicle Authorisation Single Safety Certificates Total

Invoicing Status (24. 11. 2019) • Invoiced – Vehicle Authorisation Single Safety Certificates Total • Cashed • To be cashed • Current profit margin +/- 3% 324. 530 € (222 invoices, manly C 2 T) 68. 250 € (6 invoices) 392. 600 € 228. 605 € 163. 995 €

Complementary Information Chargeable services : 8 ongoing VA projects Conformity to type figures (234

Complementary Information Chargeable services : 8 ongoing VA projects Conformity to type figures (234 issued) AVERAGE (In days) AVERAGE (In hours) 14. 5 (target : 7) 10 Pre-engagement figures (4 issued) AVERAGE (In days) AVERAGE (In hours) 99 150 Authorisation cases figures (3 issued) AVERAGE (In days) AVERAGE (In hours) 94 160 Fees and Charges SSC (6 invoices) VA (222 invoices) Total OSS availability : 99, 1 % 68 k€ 324 k€ 392 k€ Target 99% - (9 hours unavailability due problems with SRM licenses, planned IT maintenance, new release put in production, maintenance of the servers)

ERA Database of Interoperability and Safety (ERADIS) › ERA as authorising entity is improving

ERA Database of Interoperability and Safety (ERADIS) › ERA as authorising entity is improving data quality in ERADIS › Publications in ERADIS since 16/06/2019: › A little bit less than 2000 No. Bo EC certificates, › 264 EC declarations of subsystems (now the total is 427), › 480 EC declarations of conformity for interoperable constituents (now the total is 866). ERADIS 9

ECM accreditation and certification scheme Article 3 (1) All ECMs must fulfil the requirements

ECM accreditation and certification scheme Article 3 (1) All ECMs must fulfil the requirements of Annex II ECM maintains wagons ECM is RU/IM and maintains vehicles other than wagons operating by other RU/IM ECM is no RU/IM and maintains vehicles other than wagons Article 3 (2) a) Mandatory certificate Article 3 (2) b) Mandatory certificate Article 3 (4) Annex II requirements: to be checked via ECMcertification process Article 3 (5) ECM certificate deemed evidence for compliance with CSM SMS 5. 2. 4, 5. 2. 5 during safety certification / authorisation process. ECM is RU/IM, maintains vehicles other than wagons exclusively for its own operations Articles 3 (3) and 3 (4) 2 possibilities for Annex II requirements checks Article 3 (3) Voluntary ECM certificate Article 3 (4) Verification of Annex II requirements as part of safety certification / authorisation process

Transitional Period 06/19 Attestation of conformity with requirements annex III Reg 445/2011 06/20 06/22

Transitional Period 06/19 Attestation of conformity with requirements annex III Reg 445/2011 06/20 06/22 06/23 06/25 * National attestation of conformity for ECM Other vehicules than wagons National attestation of conformity for maintenance functions Other vehicules than wagons From 06/2022 an ECM certificate is mandatory ECM CERTIFICAT For vehicules other than wagons ECM CERTIFICAT For wagons Application of Regulation 779/2019 Possible period of attestations/certifications Possible extensions of validity of attestations/certificates * Attestations of Conformity issued before 06/2019 are valid until 06/2019 at latest. However, their validity can extended until 06/2023 at latest. Attestations of Conformity issued after 06/2019 are valid until 06/2020 at latest.

New ECM regulation and SCCs: way forward

New ECM regulation and SCCs: way forward

UIP Report “Noise – State of Play” – available on UIP Website under http:

UIP Report “Noise – State of Play” – available on UIP Website under http: //uiprail. org/index. php/publi/studies-reports/507 -uip -report-noise-state-of-play 2019 CEF Noise Call (deadline: April 2019): Ø successful selection of 3 projects on the retrofitting of ca. 9’ 000 freight wagons from UIP member companies (consortia) Ø overall recommended funding of € 8, 725. 5 Mio

Thank you for your attention! Austria Belgium Czech Republic France Germany UK Hungary NVPG

Thank you for your attention! Austria Belgium Czech Republic France Germany UK Hungary NVPG Italy Netherlands Poland Slovak Republic Spain GILLES PETERHANS Secretary-General gilles. peterhans@uiprail. org Sweden Switzerland