UDOT Approved Products List UDOT Approved Products APL

  • Slides: 15
Download presentation
UDOT Approved Products List UDOT Approved Products

UDOT Approved Products List UDOT Approved Products

APL Contact Personnel • Bin Shi Materials Implementation Engineer bshi@utah. gov • Tim Wozab

APL Contact Personnel • Bin Shi Materials Implementation Engineer bshi@utah. gov • Tim Wozab Approved Products Coordinator twozab@utah. gov Please send all submittals to - udotapl@utah. gov 2

Why Have an Approved Products List • The main purpose of the APL is

Why Have an Approved Products List • The main purpose of the APL is to assist construction projects by minimizing the repetitive paperwork process • This would also make available a list of products meeting UDOT standard specifications for use department wide as applicable 3

How to Get Started (R-52 Form) 4

How to Get Started (R-52 Form) 4

Form R-52 Cont. (Buy America) 5

Form R-52 Cont. (Buy America) 5

Percent of Buy America Products on the APL Buy America Products 4% Non Buy

Percent of Buy America Products on the APL Buy America Products 4% Non Buy America Products 96% 6

Admin. Code R 307 -361 (VOC Requirements) This requirement went into effect on October

Admin. Code R 307 -361 (VOC Requirements) This requirement went into effect on October 1, 2016: �Utah Admin Code R 307 -361, Architectural Coatings �Counties within Utah that are affected by the Utah Administrative Code are as follows: Box Elder, Cache, Davis, Salt Lake, Tooele, Utah, and Weber Counties. 7

(VOC Requirements) Cont. • How to meet VOC requirements 1. Accredited lab testing results

(VOC Requirements) Cont. • How to meet VOC requirements 1. Accredited lab testing results 2. Formulation data" as shown on the MSDS. 8

(VOC Requirements) Cont. VOC Content Limit for Architectural and Industrial Maintenance Coatings are found

(VOC Requirements) Cont. VOC Content Limit for Architectural and Industrial Maintenance Coatings are found in Table 1 Pg. 7/8 of the Utah Administrative Code. Those products applicable to R 307 -361 that meet the VOC requirements will be placed on the APL 9

Last Page on the R-52 Form 10

Last Page on the R-52 Form 10

Approved Products Panel (APP) • APP meetings are held quarterly • Panel members review

Approved Products Panel (APP) • APP meetings are held quarterly • Panel members review the manufacturers submitted documentation for the applicable specification under which the product was submitted 11

Submittal Flow Chart R-52 Form Review Process Time APEP Member Assigned Coordinator Review Added

Submittal Flow Chart R-52 Form Review Process Time APEP Member Assigned Coordinator Review Added Documentation 12

Submittal Flow Chart Cont. APEP Member Recommendations Product Placed on APL Acceptance Letter Notifications

Submittal Flow Chart Cont. APEP Member Recommendations Product Placed on APL Acceptance Letter Notifications Limitations If Any 13

What Happens After Four Years �The renewal process is the same process as the

What Happens After Four Years �The renewal process is the same process as the original product submittal �Fill out the R-52 Form and attach current independent lab testing results, along with the manufacturers data sheets �Submit all documentation to the APL Coordinator 14

Again the Benefits of Having the APL �Ease of paper work load for the

Again the Benefits of Having the APL �Ease of paper work load for the construction office and maintenance personnel �Contractor and suppliers paper work load from project to project has been decreased also �A reliable product database as a resource for the Project Engineer’s, Contractor’s and Shed Foreman 15