Tusp Barrow Hill Maidstone Road Ashford England TN
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN 24 8 TY – info@planning-toolkit. co. uk – Tel: 01233 640 257 Planning Improvement Last Planner Richard D Smith
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN 24 8 TY – info@planning-toolkit. co. uk – Tel: 01233 640 257 Introduction into Last Planner • The Last Planner System (LPS) improves both design and construction schedule/programme predictability • It is designed to support work being completed as and when promised. • It is a system of inter-related elements – full benefits come when all are implemented together, over time. • Based on a simple paper wall chart format, it is administered using Post-it notes and pens.
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN 24 8 TY – info@planning-toolkit. co. uk – Tel: 01233 640 257 Last Planner Process
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN 24 8 TY – info@planning-toolkit. co. uk – Tel: 01233 640 257 Start • LPS begins with collaborative scheduling/programming engaging the main project supervisors or construction managers from the start. • Risk analysis ensures that float is built in where it will best protect programme integrity and predictability. • Where appropriate the process can be used for programme compression or programme confirmation • In this way, the people that actually deliver the work are actively involved in developing the programme and ensuring that handover points, ie promises are agreed early in the planning process
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN 24 8 TY – info@planning-toolkit. co. uk – Tel: 01233 640 257 Finish • At the end of the session the facilitator confirms with the room that everyone is happy with what has been produced, ie that the various promises are agreed • The wall charts can then be turned into either a box plan or a p 3 e programme • If possible then the wall charts are taken and put on display for future usage • The plan is then reviewed on a regular basis to ensure any changes are agreed • If the plan was developed at a high level then further detailed sessions are undertaken
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN 24 8 TY – info@planning-toolkit. co. uk – Tel: 01233 640 257 Interim Reviews Last plan session (2 nd) Last plan session (1 st) Requirements (Scope) Lock 6 Start Planning Lock 4 T-16 Review Execution Scheduling Planning Lock 5 T-40 Review Last plan session (3 rd) Lock 3 T-12 Review Lock 2 T-8 T-6 Lock 1 T-4 Review T-2 Review (GO T+1 PDR (weekly) -NO-GO) Weekly Updates Engineering integration meetings (weekly) Last planner sessions can be undertaken at anytime and frequency, if the scope and deliverables are changing. However it is recommended to undertake at least 3 in the above timescales White Board (weekly)
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN 24 8 TY – info@planning-toolkit. co. uk – Tel: 01233 640 257 LPS Toolkit (1 of 2) • Large room • Wall charts divided into time slots, either weeks, days or hours (or a combination) • Post it notes (different colours for the various disciplines or activities) • Pens • Site maps or location diagrams • Clear workscope • LPS facilitator • Camera to take photos of the wall charts, once completed
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN 24 8 TY – info@planning-toolkit. co. uk – Tel: 01233 640 257 LPS Toolkit (2 of 2) • Refreshments • Car park (normally a flip chart to take actions) • Allow adequate time for the session • Switch off phones • Keep people focussed • Plenty of post it notes!!!!
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN 24 8 TY – info@planning-toolkit. co. uk – Tel: 01233 640 257 Wall Charts
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN 24 8 TY – info@planning-toolkit. co. uk – Tel: 01233 640 257 Session • The LPS needs to be facilitated by a strong leader, however the facilitator does not need to influence the durations or relationships between activities • The supervisors and construction managers walk through their activities (they are given a set of post it notes of a particular colour to denote their activities) • Every time an activity is added to the wall chart, its called a promise, ie the person confirms the duration and the interdependences, ensuring that if all is in place the activity can be delivered. • Once the plan is completed, a series of dots are added to denote the critical path • Handover points are identified between the various trades or disciplines, these are again denoted as cross discipline promise
Tusp, Barrow Hill, Maidstone Road, Ashford, England, TN 24 8 TY – info@planning-toolkit. co. uk – Tel: 01233 640 257 Feedback • A key element with the last planner session is the feedback loop • When work is completed a PDR session is undertaken to ensure that lessons are learnt and feedback can be given to the rest of the planning team. • Feedback should be both positive and negative, as lessons can be learnt from both
- Slides: 11