Turnkey project KeyPersonnel Organisation chart Director Projects Client










- Slides: 10
Turn-key project Key-Personnel Organisation chart Director, Projects Client Project Manager & Project Management Staff Danieli Engineering (DE) Project Manager Sales Manager Project Planning & Control Export Finance & L/C Manager Contract Administr. Legal Dept. Manager Procurement Manager P. M. DE P. M. DA P. M. DCM Quality Manager P. C. WTP process Process Coordinator P. E. Meltshop process P. E. Civil & structural des. P. E. Substation, HV - LV power distrib. P. E. Interconnecting piping P. E. Interconnecting cabling P. E. Instrumentation P. C. Automation system level 1 P. M. DMH P. M. DCC P. E. Rolling process P. E. Combustion process P. E. Mech. Equipment eng. P. E. L. V. Distribution P. E. Hydraulics Lubrication P. E. Automation P. C. Automation system level 2 P. E. Firefighting system Safety Officier P. E. Hydraulics lubrication P. E. Piping utilities Site Manager Planning & quantity Survey Deputy Site Manager Material Man Accounting & Cost control Civil and infrastructure construction Supervisor P. C. Cranes P. C. Procurement cc P. C. Packing & Shipping P. C. Spare parts P. C. Manufacturing & expediting P. C. Training P. C. Operation, maintenance & safety manuals Quality Assurance Eng. P. E. Instrumentation Site Technical Office Field Engineers P. C. Workshop laboratory eq. P. E. Instrumentation Client Site manager & Staff P. M. Construct Erection & Commiss. P. E. Mech. Equipment engin. P. E. HVAC P. E. Compressed air system P. E. Piping Utilities Danieli Construction & Commissioning (UMAC) P. C. Expediting / testing (E LE) P. C. Quality Control Erection Supervisors Building erection Startup and commissioning Team Mechanical equipment Electrical Reheating furnace Piping and aux. Systems Aux. Systems HV / LV power distribution & Automation system Automation
General Management Flow Chart (part 1) CONTRACT & FINANCING TOOLS REQUIREMENTS CONTRACT SCHEDULE TECHNICAL SPECIFICATION PAYMENT METHOD/FORMALITIES PICS (PROJECT INTEGRATED CONTROL SYSTEM) MASTER PLANT LIST WORK BREAKDOWN RESPONSIBILITY PRICE BREAKDOWN SCHEDULE (LEV. III) CASH FLOW JOB POSITION (TPC/JET) INSPECTION TEST SCHEDULE (ITS) (PART 2) (PART 3)
General management Flow Chart (part 2) JOB POSITION (TPC / JET) from part 1 ENGINEERING (DOCUMENT MANAGEMENT SYSTEM - DMS) MATERIAL REQUIR. TECHN. DOCUMENTS PROCUREMENT PURCHASE & ORDERS MANUFACTURING OUTSIDE (E/LE) INSIDE (I) (PART 3)
General management Flow Chart (part 3) MANUFACTURING (FROM PART 2) INSPECTION TEST SCHEDULE (ITS) (FROM PART 1) OUTSIDE (E) INSIDE (I/LE) INSPECTION & TESTING (NOI/IRE/LOC/QCTM) INSPECTION PLANNING CERTIFICATIONS (IRE) NOTICE OF INSPECTION (NOI) RELEASE CERTIFICATE (RC) PACKING INSPECTION PLANNING CERTIFICATION (IRP) NOTICE OF SURVEILLANCE (NOS) PACKING LIST JOB POSITION (TPC/JET) (FROM PART 1) PRICE BREAKDOWN (FROM PART 1) SHIPPING & INVOICING CONSTRUCTION & ERECTION WORKS SITE PROGRESS MANAGEMENT (SPM) COMMISSIONING
Master Plant List (esempio)
Estratto Livello 3: Plant Unit 31 (Typical)
Programmazione di Livello 3 (Typical)
Programmazione di Livello 4 (Typical)
Cut-off date: Progress (Typical)
Curve pianificate di avanzamento (typical) % 100 90 80 70 60 50 40 30 20 10 0 N D J F M A M J 2001 planned J A S O N D J 2002 progress F M A M J J 2003 A S O N D J F M A 2004 Valide per tutte le discipline e attività