TRD Status Meeting 1105 archiving in DCDB Stefan
TRD Status Meeting 11/05 Ø archiving in DCDB - Stefan Ø Ø Ø status super module - Bernd glue news - Christian Schmidt chamber production overview - Matthias Hartig test of HV master/slave card - Jorge, Marc status chip production - Volker status testing, MCM production - Dirk, Thomas status OASE/GTU - Venelin alignment - Dariusz general software status - Christoph towards super module 1 - David background studies - Volodya aob
Alignment Ø implementation of geometry classes in TRD software - Jan Fiete Ø study of systematic misalignment (of hits) and alignment (corrections) - Dariusz Ø followed by implementation in alignment and calibration framework
TRD Parameters per Run Ø Ø Ø Ø Ø drift velocity from the monitor (? Chilo) gas composition (chilo) pressure (from where? ) global temperature 18 x 32 from DCS luminosity (from where? ) global chamber anode currents 540 x 2 2 bytes chamber drift currents 540 x 2 2 bytes chamber anode voltages 540 x 2 2 bytes chamber drift voltages 540 x 2 2 bytes low voltage current low voltage sensor low voltage bar voltage 18 x 6 magnetic field (from where? ) global list of masked channels list of active chambers something from the pretrigger?
Milestones Ø Ø Ø readout board start of production digital chip complete MCM complete readout board complete GTU start production GTU complete 7/05 done 7/05 delayed 1/06 11/06 ? 12/06 ? 6/06 1/07 Ø Ø Ø chambers 50% complete chambers 100% complete start stacking super modules complete ready to install 1 super module start installation 1 super module end installation 1 super module ready to install 9 -1 super modules start installation 9 -1 super modules end installation 9 -1 super modules TRD 50% installed TRD 100% installed 12/05 ? 10/06 11/05 ? 6/07 5/06 ? 6/06 7/06 8/07 3/07 1/08
Milestone Concerns Ø