Transmission Planning Cell Weekly Progress Report (Status as on 08. 02. 2013)

Transmission Planning Cell Weekly Progress Report (Status as on 08. 02. 2013)

Summary of daily dialing from SSA heads week ending 08. 02. 2013 S. No.

Summary of daily dialing from SSA heads week ending 08. 02. 2013 S. No. 1 Item Target 2012 -13 Pipe laying target 3120 Cable Laying Tgt: 3422 Cable A/T Tgt: 4199 Pipe in hand: Cable in Hand Cable to be A/ted CPE in Hand CPE to be A/Ted ADM 1 in Hand Pendency Pending as on 1 -4 date 12 Item Achievement 12 - During the week 13 end 08. 02. 2013 1016 610. 117 Pipe laid 405. 883 CTT-1. 1 143 (+1500 Km recd. 12 -13) 1182. 956 Cable Laid 472. 566 CTT-2. 3 1057 1230. 798 Cable A/ted 299. 617 JP-10. 262, KTH. 945 446 4562 CPE instt. 105 61 106 CPE comm. 60 339 301 ADM 1 instt. 38 CPE instt. Tgt. Status of O. F. Cable & Eqpt CPE comm. Tgt. 1206 ADM 1 instt. Tgt. 415 ADM 1 Comm. Tgt. 432 ADM 1 to be A/ted 15 34 ADM 1 Comm. 19 ADM 16 Instt. Tgt. 228 ADM 16 in Hand 100 75 ADM 16 instt. 27 ADM 16 Comm. Tgt. 326 ADM 16 to be A/Ted 101 90 ADM 16 comm. 38 6 Nos. (Bonli 01(SWM) & No. of Nainwa-01(BND), Rings Kapasan(CTT), completed Bissau-01(JJN), SGR-1, AMT 01(UPR) Total no. of Rings planned 2 Item Intra SDCA Ring Total RKMs status planned Total Pipe Laid Toatal Cable Laid 1267 83 No. of Rings pending 83 77 1431 RKms pending 1117. 2 1241 W. O. issued 623. 8 Pipe to be laid 811. 2 724. 2 Pipe laid 101 Cable to be laid 1184 1100. 5 cable Laid 88 307 8

Summary of daily dialing from SSA heads week ending 08. 02. 2013 S. No.

Summary of daily dialing from SSA heads week ending 08. 02. 2013 S. No. Target 2012 -13 Item Total no. of sites planned 3 3 G Sites Total RKMs Planned 290 Total no. of sites planned 4 200 Total RKMs 2 G Sites Planned 362 724 Item No. of sites pending Pipe to be laid Cable to be laid CPE to instt. 5 6 EB cases FTTH Total RKMs planned 207 OFC Tgt. 152 Connection tgt. 7000 Pipe to be laid Cable to be laid OFC to be laid Connectio n to be provided Pendency Pending as on 1 -4 date 12 Item During the Achievement week end 12 -13 08. 02. 2013 200 150 No. of sites put on OFC 51 290 282 Pipe Laid 8. 71 290 282 Cable Laid 7. 71 362 No. of sites put on OFC 724 Pipe Laid 724 Cable Laid 724 CPE instt. No. of EB cases provided 207 Pipe laid 207 202. 414 cable laid 4. 586 152 OFC laid 17784 15892 Connectio n provided 1892 JP-11, KTH-1, UPR-2, BIK-1

Pipe Laid during 2012 -13 as on 08. 02. 2013 S. No. SSA Availble

Pipe Laid during 2012 -13 as on 08. 02. 2013 S. No. SSA Availble as on 01. 04. 2012 in hand 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 AJM ALW BSW BMR BTP BLW BIK BND CTT CRU JSL JP JLW JJN JDP KTH NGR PLI SWM SIK SRO SGR TNK UPR Total 41 24 5. 5 129 12. 9 25. 5 121 4. 1 54. 6 23. 9 49. 8 10. 8 14. 9 49. 9 12. 8 55. 8 46. 2 79 5. 1 37. 5 51. 7 75. 5 36 49. 5 1016 Laid w/o cable 6 0 44 0 16 0 0 8 24 125 0 10 5 10 8 0 53. 5 0 4 0 62. 4 0 0 0 375. 9 Target 2012 -13 During the Total ach. week month During 12 -13 Laying 113. 9 64. 6 53 60. 1 42 204. 6 38 111 5. 8 45. 9 620. 3 36. 6 66. 9 136. 6 169. 5 117. 5 148. 5 79. 5 42 252. 8 209. 7 101. 6 286. 7 3120. 1 0 0 0 0 1. 1 0 0 0 0 0 0 0 0 1. 1 105. 2 0. 0 0. 3 46. 3 0. 0 20. 6 5. 4 0. 0 69. 7 4. 5 30. 5 0. 0 25. 835 6. 2 1 5. 3 0. 0 35. 0 0. 0 49. 8 404. 783

Availble as on 01. 04. 2012 S. No. SSA in hand Laid w/o A/T

Availble as on 01. 04. 2012 S. No. SSA in hand Laid w/o A/T Target 2012 -13 During the week Laid w/o Commi AT by Laying ssionin Laid Comm. Civil g 145. 11 131 62 47 90 36 10 50 58 90 102 35 131 95 53 350 55 10 50 58 90 104 221 9. 32 0 529 1. 11 0. 00 0 JJN 13. 14 10. 00 0 JDP 5. 54 94. 97 KTH 4. 58 17 NGR During the Month Total ach. During 12 -13 Laid Comm. 19. 0 4. 005 9. 94 40. 4 8. 51 6. 01 0. 00 6. 8 0. 00 24. 44 2 0. 00 20. 80 14. 25 22. 55 2 17. 83 0. 00 0. 47 0. 00 13. 39 0. 00 16. 83 0 0 0 0 0 0 0 0 2. 3 0 0 0 0 0 121. 6 0. 60 3. 75 1. 942 4. 5 6. 01 7. 945 0. 00 22. 20 42. 576 0. 00 539 0 10. 262 84. 968 41 89 304 0 0 0 0 86. 05 41 79 210 0 0 0. 29 36. 5 0. 00 42. 32 0 67 111 0 . 945 17. 112 0. 00 61. 4 22. 6 0 0 0 18 6. 19 0. 00 0 0 19 SWM 0. 00 0 0 0 20 SIK 5. 20 0. 00 0 0 21 SRO 11. 44 4. 00 0 0 22 SGR 16. 80 14. 10 0 0 23 TNK 2. 10 0. 00 0 0 24 UPR 16. 08 1. 50 0 220 31 151 24 104 125 58 170 0 PLI 136 31 151 24 100 111 58 169 0 0 50. 0 2. 4 8. 05 0. 00 17. 32 0. 00 44. 803 Civil 0 313 0 0 0 Total 142. 67 1057 313. 41 2417 3497 2. 3 11. 207 472. 566 1 AJM 0. 00 0 2 ALW 13. 58 32. 63 0 3 BSW 1. 94 6. 19 0 4 BMR 1. 94 260. 00 59. 65 5 BTP 2. 37 19. 05 0 6 BLW 10. 33 0. 00 0 7 BIK 5. 94 0. 00 0 8 BND 4. 03 0. 00 0 9 CTT 0. 71 0. 00 0 10 CRU 3. 88 2. 09 0 11 JSL 12. 38 186. 55 JP 3. 41 JLW 14 15 12 13 16 Pending to be A/ted 24 F OFC laid & Commissioned during 2012 -13 as on 08. 02. 2013 102. 6 29. 180 0. 0 221. 592 15 0. 0 7. 945 0. 0 22. 20 37. 876 186. 5 69. 838 0. 3 25. 68 80. 7 37. 638 93. 569 2. 4 7. 6 0. 0 8 14. 1 0. 0 29. 473 74. 393 238. 607 299. 61 1230. 798 7

Consignee for 1500 Kms. of 24 F OFC Name of SSA AJ ALW BSW

Consignee for 1500 Kms. of 24 F OFC Name of SSA AJ ALW BSW BMR BTP BLW BIK BND CTT CRU JSL JP JLW JJN JDP KTH NGR PLI SWM SIK SRO SGR TNK UPR CTSD Total proposed consignee allotment for UM Cable for HFCL (In 1500 Km 24 F (In Kms. ) OFC 50 35 45 10 30 0 55 10 50 90 20 400 15 35 40 75 70 45 20 10 145 100 30 120 0 1500 0 0 40 40 0 80 0 35 0 40 35 0 20 0 40 40 50 500 40 35 0 0 30 0 40 0 20 80 0 0 40 0 35 0 0 0 40 20 30 40 50 500 Consignee for CGMTS Kolkata (In Kms. ) Total 0 0 0 0 0 40 0 80 0 35 0 45 0 0 40 40 180 500 Total Qty. Consignee for proposed in Consignee for Sudharshan CTSD (In Kms. ) Teracom Telecom 0 0 0 0 0 40 0 0 35 0 45 0 0 0 40 90 250 Total 24 F OFC Received during 2012 -13: 1500 Kms. 0 0 0 80 0 0 0 0 40 40 0 0 90 250 10 0 5 10 0 0 15 10 10 10 0 160 15 0 0 0 10 25 0 0 0 280

CPE Installed & Commissioned during 2012 -13 as on 08. 02. 2013 S. No.

CPE Installed & Commissioned during 2012 -13 as on 08. 02. 2013 S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Availble as on During the Total ach. Target 2012 -13 Faulty CPEs Repaired 01. 04. 2012 Week Month During 12 -13 SSA Commi Siemen Tejas/I Ordyn/ Instt Installa in hand ssionin Instt. Comm. w/o A/T tion s TI SCL g AJM ALW BSW BMR BTP BLW BIK BND CTT CRU JSL JP JLW JJN JDP KTH NGR PLI SWM SIK SRO SGR TNK UPR Total 52 45 5 4 6 19 12 0 1 11 5 0 3 61 82 0 12 24 0 8 5 15 8 68 446 0 0 0 0 0 22 0 0 0 3 0 8 0 28 0 0 61 96 20 28 42 28 32 88 30 20 26 20 98 8 30 120 58 80 36 64 46 28 48 0 144 1190 96 20 28 42 28 32 88 30 20 26 42 98 8 30 120 58 80 39 64 54 28 76 0 144 1251 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24 1 1 0 0 1 12 0 3 0 0 14 0 7 0 21 4 2 0 0 0 2 0 18 105 0 0 0 12 0 0 14 0 0 0 21 0 0 0 10 0 3 55 0 4 0 1 0 0 3 0 0 0 1 5 0 0 4 0 0 6 24 0 7 0 4 3 5 17 0 3 2 2 50 6 0 16 25 18 4 2 0 0 1 0 4 169 0 3 5 9 29 3 13 0 3 2 2 11 7 6 3 4 0 0 12 18 0 17 0 5 157 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 0 30 22 0 0 0 0 18 70

ADM 1 Installed & Commissioned during 2012 -13 as on 08. 02. 2013 Availble

ADM 1 Installed & Commissioned during 2012 -13 as on 08. 02. 2013 Availble as on 01. 04. 2012 S. No. SSA Target 2012 -13 in hand Instt w/o A/T Installation 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 AJM ALW BSW BMR BTP BLW BIK BND CTT CRU JSL JP JLW JJN JDP KTH NGR PLI SWM SIK SRO SGR TNK UPR 8 6 17 16 0 20 37 9 0 22 0 0 7 13 22 0 21 19 0 0 0 62 7 53 0 0 2 0 4 0 0 0 0 0 1 0 0 0 4 0 0 27 0 20 0 18 18 4 20 5 0 0 26 29 25 32 20 0 4 44 48 8 65 0 0 29 0 24 0 18 22 4 20 5 0 0 26 29 25 32 21 0 4 44 52 8 65 Total 339 15 413 428 1 2 3 4 5 6 During the Week During the Month Commissioni Instt. ng Total ach. During 12 -13 Comm. Instt. Comm. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 9 0 0 0 4 0 0 2 8 0 0 0 5 3 1 0 0 2 0 4 0 0 0 0 5 3 5 0 0 38 19

ADM 16 Installed & Commissioned during 2012 -13 as on 08. 02. 2013 Available

ADM 16 Installed & Commissioned during 2012 -13 as on 08. 02. 2013 Available as on 01. 04. 2012 S. No. SSA in hand 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 AJM ALW BSW BMR BTP BLW BIK BND CTT CRU JSL JP JLW JJN JDP KTH NGR PLI SWM SIK SRO SGR TNK UPR Total 13 11 0 5 0 0 2 0 4 0 6 3 6 1 6 7 3 6 9 0 7 6 2 3 100 Target 2012 -13 Instt w/o Installati Commis A/T on sioning 0 0 0 1 2 22 0 0 3 0 10 24 7 1 0 13 10 0 0 6 0 0 2 0 101 13 22 0 6 0 0 8 0 0 105 8 0 0 9 0 13 8 0 34 2 0 0 228 13 22 0 7 2 22 0 0 8 0 10 129 15 1 0 22 10 13 8 6 34 2 2 0 326 During the Week During the Month Total ach. During 12 -13 Instt. Comm. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 0 0 2 0 0 5 0 0 0 3 0 4 0 0 2 1 27 0 0 2 12 0 0 5 0 0 15 0 0 0 0 0 4 0 38

No. of ADM 1 Planned No. of CPE Planned Eqpt. Installed Status of Equpt

No. of ADM 1 Planned No. of CPE Planned Eqpt. Installed Status of Equpt A/T Pending Pipe laying work Pending cable laying work No. of ADM 16 Planned 3 69. 5 0 68 69. 5 68 70 1. 5 0 21 0 8 0 1 Cable already A/Ted for 3 rings & Ring comm. Target by 31. 08. 2012. ALW 5 3 0 4 35 BSW 4 0 9. 94 0 35 35 0 Cable Laid 3 Pipe laid Rings comm. 2012 -13 AJM SSA W. o. Issued(RKms) Rings comm. No. of Rings planne d during 201314 RKms Planned OFC cable A/Ted(Rkms) O. F. Eqpt Rings for which OFC completed Tender Finalised(RKms) Section wise detail No. of Rings for 2012 -13 For full ring Cable section RKms Status of Intra SDCA OFC rings for execution during 2012 -13 Remarks as on date 0 0 35 35 20 12 11 6 2 4 Ring completed), 1 Ring 15. 09. 12 39. 5 40 0 0 39. 5 0 27 0 0 0 Ring comm. tgt of 4 rings: 2(31. 07. 2012), 1(31. 08. 12), 1(30. 09. 12) 54 54 57 3 0 0 14 0 0 0 OFC work completed. Cable A/T & put to use target 31. 07. 12, Ring Comm. Target 31. 08. 12. 7 Nos. of STM-1 are to be used in place of STM-16 already planned. 25. 1 22 17. 9 17 17 5. 5 5 21 0 9 0 0 2 2 Ring comm tgt. 15. 08. 12 0 40 0 4 0 0 3 2 Rings Tgt. (15. 09. 12) 50. 3 49 49 1. 5 0 18 4 0 0 48. 5 49 22 0 27 6 10 4 0 1 0 97 0 20 0 0 1 5 4. 5 0 0 0 0 14. 7 ## 181 0 9 0 BMR 2 2 0 0 57 BTP 2 0 0 0 BIK 2 0 0 0 BND 3 2 36. 3 1 1 CTT 3 1 21. 5 0 1 CRU 3 0 0 0 97 97 0 0 JSL 1 1 4. 5 0 4. 5 JP 28 6 182 16 428 432 JLW 2 1 22. 4 0 36. 9 14. 5 30 22 45 57 40 54 40 0 40 40 97 0 0 240 114 6. 5 14. 5 0 102 8 0 10 0 1 Ring comm. , 1 Nainwa-01 Comm. During, Aug, 12, 1 Ring cable & Ring comm tgt. By 31. 08. 12 1 ring A/Ted , Cable & Ring comm tgt: 2(31. 12) Pipe laid in all three rings, cable to be laid. Comm. Tgt: , 3(31. 08. 12). 4. 5 Km cable A/T done. Equipment required. 16 already comm, Cable & Ring comm. Tgt. : 1(30. 09. 12 only ring comm. ), 1(30. 12), 1(30. 11. 12), 8(30. 12), 1(31. 01. 13) Out of 2 Rings, 1 ring Cable A/T completed & Ring Comm. By 31. 07. 12, 1 ring work in progress Ring Comm. Tgt. 31. 08. 2012

JJN 7 3 7. 1 1 1 69. 8 69. 35 59. 2 53

JJN 7 3 7. 1 1 1 69. 8 69. 35 59. 2 53 JDP 4 3 141 3 160 155. 5 14. 5 7 0 KTH 3 0 7. 5 0 56. 2 30. 2 17 NGR 5 1 20 0 PLI 4 0 0 0 SWM 4 3 107 SIK 1 1 SRO 4 SGR 33. 1 24. 45 36. 3 Status of Equpt A/T Eqpt. Installed No. of CPE Planned No. of ADM 16 Planned O. F. Eqpt Pending cable laying work Pending Pipe laying work Cable Laid Pipe laid W. o. Issued(RKms) Section wise detail Tender Finalised(RKms) RKms Planned Rings comm. 2012 -13 Rings comm. OFC cable A/Ted(Rkms) Rings for which OFC completed SSA No. of Rings For full ring Cable section RKms Status of Intra SDCA OFC rings for execution during 2012 -13 No. of Rings planne d during 201314 Remarks as on date Out of 7 rings: -1 Ring already comm. , 1 Ring comm. During 13 -14, 2 Rings OFC work completed Ring Comm. Tgt: 31. 07. 12, 1 Ring by NTP Tgt. 31. 08. 12, 1 Ring by 31. 01. 2013 3 33 0 8 8 0 148. 5 156 0 29 0 0 18 43. 7 42. 7 6 19 0 0 0 3 117 117 107 76. 5 53 40. 5 64 0 32 0 0 3 cable & Rings comm. Tgt: 30. 09. 12(Pipe laid only), 1 Ring cable A/ted Ring comm. By 15. 08. 12, 1 cable & Ring Comm by 31. 08. 12 14. 2 0 0 14. 2 4 4 0 0 0 6 2 Cable & ring comm. by 31. 08. 12 & 30. 09. 12, 2 Ring comm. By 31. 08. 12 0 1 138 117. 4 8 85 86. 2 32. 48 31. 2 14 8 0 0 out of 4 rings , OFC work completed in 3 rings & only pipe laid in 1 ring. Bonli-01 Ring comm. During Aug, 12, 1(31. 08. 12), 1(30. 11. 12), 1(31. 12) 12 0 12 12 0 0 0 69. 5 47. 5 44. 5 13. 5 10 4 0 0 1 103 TNK 2 0 0 0 75 UPR 9 2 29. 6 1 12 51 45 0 0 4 0 0 25 56 31 0 0 0 9 63 0 43 0 0 0 3 cable & Ring comm: . 4(31. 08. 12), 1(15. 09. 12), 4(31. 12) 45 0 11 0 0 OFC work in progress in both rings. Cable A/T(Pending section) & Ring comm. Tgt. : 1(30. 09. 12), 1 (31. 12) 0 44 0 0 30 30 45 1 78. 5 74. 96 65. 3 43 39 6 1760. 1723. 958. 732 709 659 525. 7 1074 5 9 2 36. 16 50. 4 1 already comm. , 1 AMT-01 comm. In Jan, 13 Cable A/T(pending sections) & Ring comm. 1(15. 09. 12), 4 2(30. 09. 12), 2(31. 10. 12) , 1(30. 11. 12), 1(31. 12) 0 G. Total 108 33 601 26 OFC work completed. Cable A/T done. 4 rings pipe laid for which Cable & Ring comm. Tgt: 1(31. 12), 1(30. 08. 12), 2(15. 09. 12) 0 100. 1 35. 4 49. 7 35. 4 37. 2 64. 75 6 75 Out of 4 Rings, 3 rings already comm. , Cable A/ted & Ring comm. By 15. 09. 12 for 1 ring Comm. Tgt: - 2(30. 09. 12), 1(30. 12) 198 350 0 137 116 45

Status of conversion of 3 G sites on OFC media as on 08. 02.

Status of conversion of 3 G sites on OFC media as on 08. 02. 2013 Non Feasible sites(NF) Total Planned for OFC conversion converted on OFC as on 01. 04. 12 To be converted on OFC as on 01. 04. 12 OFC work WIP Ach. during week Ach. during the Month Ach. during 12 -13 Radio modem 4 E 1 Status during 2012 -13 ML Status as on 01. 04. 12 1 AJM 17 18 0 0 35 0 0 Target: 4(15. 08. 12), 5(31. 08. 12), 2(15. 09. 12), 10(30. 11. 12), 12(31. 12) 2 ALW 0 4 0 0 4 2 2 1 0 0 1 Target: 1(15. 08. 12) 3 BIK 15 4 0 5 14 0 0 0 7 Target: 4(15. 08. 12) 4 BRM 8 3 0 0 11 0 0 0 1 Tender to be floated by 31. 07. 2012 for 10 sites& targetted by 30. 11. 2012, For one site viz. , Housing Board work completed & A/T pending 5 BRP 6 1 0 0 7 6 1 0 0 0 1 1 BTS site put on OFC in Dholpur in Sept, 12 6 BSW 4 1 0 2 3 2 1 0 0 2 sites completed viz. , Adarsh nagar, Shastri Colony, during previous year by NTP are to be made over to SSA, TGT: 1(31. 12) 4 0 0 5 5 0 0 0 All Put on OFC 2 0 0 3 1 2 1 0 0 1 Tgt: 31. 07. 12) FH S. no. SSA Bund 1 i 8 CRU 1 7 Remarks/Target dt. 08. 02. 2013 9 CTT 5 1 0 2 4 2 2 0 0 For pending 2 sites , Tender Finalized 10 JDP 22 7 0 16 13 3 10 0 0 11 JJN 4 3 0 0 7 0 0 0 4 12 JLW 2 1 0 2 1 1 0 0 0 Tgt: - 10(30. 09. 12) Target: -1(31. 08. 12), 2(31. 12)2 sites viz, Foz Ka Mohalla, Jain Temple are being excuted by NTP. (i) main CSC (ii) Piprali chok(iii) Housing Board(iv) Kisan Col. In Sept, 12 28 37 1 28 38 8 30 0 13 JP 0 target: 1(30. 09. 12), 16(31. 10. 12), 9(30. 11. 12), 4(31. 12) 14 JSM 3 15 KTH 20 3 5 0 0 2 0 4 25 0 14 4 11 0 0 0 0 11 NIT for pending 4 sites by 20. 07. 12 Chhawani, Vikram Nagar Target: 1(31. 10. 12) 16 NUR 8 8 0 0 16 0 0 0 6 Target: -10(30. 09. 12) 17 5 7 0 1 11 1 10 0 4 18 SGR 3 19 SIK 5 8 3 0 0 10 8 8 0 2 8 0 0 0 2 5 20 SRO 5 5 0 0 10 0 5 21 SWM 1 1 0 0 2 1 1 1 0 0 0 Target: 1(30. 09. 12) 22 Tonk 2 2 0 1 3 3 0 0 0 All Put on OFC 23 UPR 26 20 0 17 29 6 23 0 0 0 3 Target: 1(30. 09. 12), 5(31. 10. 12), 10(30. 11. 12), 1(31. 12) Grand 191 148 Total 1 77 263 63 200 3 0 0 51 PLI Target: - 2(15. 10. 12), 6(31. 10. 12) RHB & Dhariwal Telecom Colony, Woolen mill, bjena ngr H Block Target: 3(31. 10. 12), Joshi Circle, Rajendra Ngr, KM school, USR 004. 4 sites of mount abu viz. , Mach gaon, Pandav Bhavan, Gyan sarovar & Main Market t. Depth relaxation case to be sent to C. O. target: 4(31. 12)

Status of OAN in 49 B/B Cities under NTP/SSA execution as on date S.

Status of OAN in 49 B/B Cities under NTP/SSA execution as on date S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Total Cable Total Handed No. of EB Executi Status as on date cable over to Bldgs. cases/FT on No. of Name of RKMs comm. SSA as on where fibre TH under Manholes Bldgs. SSA City Planned Status as date (Kms), extended up connecti (NTP/S Cable on date in case of available Identified to the ons SA) Pipe Laid (Kms) execution buildings provided by NTP AJ Ajmer 120 NTP 196 71 878 90 94 85 85 ALW Alwar 150 NTP 129 154 154 ALW Behror 26 SSA 21 13 13 ALW Bhiwari 24. 5 SSA 33 18 18 ALW Neemrana 27. 7 SSA 34 18 18 BIK Bikaner 57 NTP 55 64 62 62 BLW Bhilwara 117 NTP 426 6 6 112 143 64 BTP 64. 4 NTP 205 55 69 69 33 BTP Dhol Pur 32. 6 NTP 63 22 30 18 0 BND 53 SSA 96 49 49 JP Jaipur 303 NTP 1144 408 1745 283 392 392 JP Dausa 35 NTP 56 13. 81 23 23 20 JDP Jodhpur 130 NTP 130 166 139 KTH Kota 96 NTP 261 46 28 72 106 88 KTH Baran 20. 5 SSA 15 0 0 71 19 19 PLI 60 NTP 49 43 43 0 SGR 71 NTP 237 0 34 31 60 65 50 0 SWM 48. 8 NTP 98 10 53 42 50 50 50 SWM Karauli 8. 8 NTP 11 8 9. 5 2. 14 0 SWM HND 16. 1 NTP 0 0 0 TNK 31. 74 NTP 49 10 0 35 35 UPR Udaipur 78 NTP 78 102 100 72 Total 1566 1454 1628 1588 1194 2761 0 585 2741

Status of FTTH Broadband Connections Provided SSA Ajmer Alwar & Bhiwari Jaipur Jodhpur Kota

Status of FTTH Broadband Connections Provided SSA Ajmer Alwar & Bhiwari Jaipur Jodhpur Kota Udaipur Bharatpur Bhilwara Bikaner Bundi Sawai Madhopur Sri Ganganagar Total VPN Ach. Status as Ach. over Ach. Status as on Target during 2012 -13 on during Broad 2011 -12 01. 04. 2012 -13 the as on 08. 02. 1 the Week Band Month 08. 02. 13 3 conn. 655 690 0 0 1500 172 862 812 13 13 1284 0 0 11 24 0 1005 11 5 18 1 3 128 2 1483 12 7 19 1 3 128 2 9000 1500 1000 250 500 250 11 0 1 2 0 0 1 0 1012 93 54 100 0 12 392 0 2495 105 61 119 1 15 520 2 1472 80 0 20 0 0 495 0 40 40 250 0 0 23 63 0 21 21 750 0 0 23 44 0 1902 2419 17784 15 15 1892 4311 2879

Status of NOFN Survey Reports as on 08. 02. 2013 Sl. No. Name of

Status of NOFN Survey Reports as on 08. 02. 2013 Sl. No. Name of SSA 1 2 3 4 AJM ALW BSW BMR 5 No. of Blocks No. of GPs of Blocks of which survey where survey report sent to survey recd by Circle sent to CO , New completed Office New Delhi Remarks/ Status of survey as on 08. 02. 2013 8 276 470 543 380 Survey completed report sent to CO 13 13 525 Survey completed report sent to CO 11 11 11 189 5 5 5 181 4 4 4 14 386 14 14 14 389 192 181 386 Survey completed report sent to CO CRU 7 279 7 7 7 279 Survey completed report sent to CO 11 12 13 14 15 16 17 18 19 JSL JP JLW JJN JDP KTH NGR PLI SWM 3 128 3 3 3 17 671 17 17 17 6 252 6 6 6 8 288 8 10 351 10 10 10 13 394 13 13 13 11 461 11 10 320 10 11 464 11 11 11 128 671 252 289 351 400 461 320 471 Survey completed report sent to CO Survey completed report sent to CO Survey completed report sent to CO 20 SIK 8 329 8 8 8 333 Survey completed report sent to CO 21 22 23 24 SRO SGR TNK UPR 13 415 13 11 11 15 571 15 15 15 6 231 6 6 6 19 703 19 19 19 352 578 231 698 Chitalwana, Sanchore pending Survey completed report sent to CO Total 247 9192 247 245 9156 8 276 8 8 8 14 472 14 14 14 13 543 13 13 13 8 380 8 8 BTP 13 525 13 6 7 8 9 BLW BIK BND CTT 11 383 5 4 10

Compliance regarding pending issues Sl. No. Issue 1 2 3 4 5 6 Long

Compliance regarding pending issues Sl. No. Issue 1 2 3 4 5 6 Long pending A/T of the laid cable by Civil Wing Action Taken A co-ordination meeting was held on 17. 07. 12 with Civil Wing & T&D Circle. In cordination meeting dt. 22. 01. 2012 Civil wing intimated apprx. 74 Kms of 6 routes A/Ted & assured comm. of pending A/T work subjected to fund availbility. Project Estimates of FTTH PE of JP, KTH, UPR & BND SSAs sanctioned. PE of AJ, BIK ALW SSA returned for re-examine. A letter has been sent to all SSA heads regarding survey report as per formats given by BSNL HQ. Survey work of approx. 99% BHQs has already been completed for which compilation at SSA level is under process. Report of 245 blocks already sent to HQ. MOU for ROW NOFN Project permission received from Govt. of Rajasthan endst. to SSAs. GIS Maps prepared by NIC sent to all SSAs. MOU with BBNL received and forwarded to the SSAs. D. O. to the SSAs having major pendency have been issued. Reports from 2 Blocks of SRO SSA is pending. Sterlite Btys. problem A letter has been written to M/s Sterlite reg. Replacement of faulty battery sets on dt. 05. 09. 12 reminder on 22. 09. 12 , 07. 11. 12 , 26. 11. 12 & 05. 02. 2013. The case taken up by CO with sterlite. Requirement of CPE for GSM Project A letter has been again sent to HQ regarding Total 1500 Nos. CPEs for Pending 3 G GSM sites under Phase-V & proposed GSM Phase VII Project on dt. 27. 11. 2012 & reminder dt. 26. 12. & 31. 01. 2013. Requirement of OF store for RSWAN Letter dated 18. 09. 12 & reminder dated 03. 12 issued. Report Project awaited from ALW, BSW, NUR, UPR, JSL & TNK SSAs. PE details from JP, AJ, SIK, SRO, JLW awaited.

Sl. No. Issue Action Taken 7 Requirement has been sent to MM cell for

Sl. No. Issue Action Taken 7 Requirement has been sent to MM cell for procurement of 1200 Kms PLB Requirement of PLB Pipe pipe for various OFC works viz. , 100 Kms for Arain Block(AJ), 1100 Kms for other development works. Consignee details sent to MM cell. 8 Requirement of STM-16 A letter has been again sent to HQ on dt. 27. 11. 12 regarding 130 Nos of ADMs STM-16 ADMs 9 Requirement of balance A letter has been again sent to HQ on dt. 27. 11. 2012 regarding balance 24 F O. F. cable 2050 Kms 24 F O. F. cable for Development/Mtce. work 10 Repair of faulty CPE A letter has been sent to HQ regarding repairing of faulty CPEs of Tejas make. 11 OFC comm. & fault comm. report Report recd from SSAs & sent to BSNL HQ. 12 Latter dated 21. 12 and reminder dt. 15. 12 & 31. 01. 2013 issued. Fault booking of media Format SBNM_1 & SBNM_2 available on rjintranet. Report received only failure in SBNM from Siker SSA. 13 Report of incoming and Letter dated 11. 12 & reminder dt. 27. 12. 2012 & 01. 02. 2013 issued. outgoing E 1 s for Format available on rjintranet. Report received only from Jaipur and Sikar transmission systems of SSA. TAX bldg. of SSAs 14 Report of Deployment of Letter dated 01. 13 and reminder dt. 10. 01. 13 issued. Format available GPON equipment in on rjintranet. Report received from SGR & KTH SSAs. OAN cities.