Towards a Common Event Model for an Integrated






















- Slides: 22
Towards a Common Event Model for an Integrated Sensor Information System (ISIS) Chris Fowler and Behrang Qasemizadeh Queen’s University Belfast and DERI, University of Ireland
Route origin Background Risk destination Dynamic Risk time location profiles events
Active Sensor Array Detected Events passenger profiles left luggage audio spikes rf events impacts behaviours On-board Analysis On-board Risk Level (time, location, background-risk) Alerts
Integrated Sensor Information System • Scalable Network (many buses) • Information Visualization • Operational Interface • Sensor Analytics • Wireless Comms • Data Archive, Query and Retrieval
physical virtual
reasoning semantics annotations conceptualizations sensor data hardware environment 001001 111010 110001
How to create a common understanding? reasoning semantics annotations conceptualisations sensor data hardware environment Active Sensor Array
How to label concepts in the data? reasoning semantics annotations conceptualisations sensor data hardware environment Active Sensor Array
How to link concepts between data? reasoning semantics annotations conceptualisations sensor data hardware environment Active Sensor Array
How to reason about causality? reasoning semantics annotations conceptualisations sensor data hardware environment Active Sensor Array
agent event goal Simple Definition An event is an action over time of an agent toward a goal. Examples (English) • The man approaches the chair. • The cat sat on the mat.
Semantic Role agent Definition event goal Definition Agent is the semantic role of a person or thing. Goal is the semantic role of the place to who is the doer of an event. which something moves, or the thing toward which an action is directed. Examples (English) • The boy ran down the street. • He was chased by the dog. • John swam to the raft. • He threw the book at me. source: http: //www. sil. org/linguistics/Glossary. Of. Linguistic. Terms
man agent approaches event chair goal
Sensor Analytics: objects, properties and events
Event Triggers
<insert data model/flow slides/>
Integrated Sensor Information System hci / machine interaction reasoning / api semantics dynamically deployable analytics annotations (conceptualizations) data-layer multi-modal sensor infrastructure environment
Sensor Networks Information Interaction Domain Driven Models Dynamic Services Social Networks (APIs) Knowledgeable Infrastructure SOA
Thank you.