TOTEM & CT-PPS completion of upgrade project overview • Main Activities performed in 2016

TOTEM & CT-PPS completion of upgrade project overview • Main Activities performed in 2016 -> TS 1 & TS 2 -> installation of timing detectors RP cylindrical & electronics & cables -> x-ray of bellow (RF fingers) RPs 210 & 220 -> exchange of detector packages (RPs 210) • Main activities scheduled for EYETS 2016 -> exchange ferrites & install RF shields in RP 220 far (near? ) -> move RP unit vertically by 2 mm [approved by vacuum group after x-ray (RF fingers) ] -> separate the secondary vacuum lines of the RP 210 & 220 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

Q 6 TCL 6 RP-220 m (far) Roman Pots in the LHC tunnel General

Q 6 TCL 6 RP-220 m (far) Roman Pots in the LHC tunnel General layout Ionic pump PP RP-220 m (near) RP-210 m (far) turned 8° PP of RPs 220 m RP Timing Roman Pot Stations (LSS 4 -5) Ionic pump Roman Pot Stations (LSS 56) PP of RPs 210 m Ionic pump RP-210 m (near) IP 5 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B Q 5

10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

At present: Three different designs of horizontal RP. Old original design is not validated

At present: Three different designs of horizontal RP. Old original design is not validated for insertions at standard optics (impedance, ferrites) detector Technology not validated for insertion at standard optics for LHC 10/02/2022 Technology validated for insertion at 15 σ for LHC design luminosity at standard optics TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

Physics requirements (standard LHC optics) Movement direction for RP insertion Si detector Extreme requirements

Physics requirements (standard LHC optics) Movement direction for RP insertion Si detector Extreme requirements on RP spectrometer and LHC beam performance: Reproducibility of insertion position from fill to fill better than 50 µm LHC beam orbit stability better than 100 µm Impedance impact mitigation of installation -> RF shield – Ferrite geometry Radiation hard detectors Separated with thin window of 150 μm from LHC vacuum Fully automatized RP insertion steered by LHC CCC More than 30 RP insertions this year ! 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

TOTEM & CT-PPS status of upgrade project overview installation @ LHC -> 2016 Activities

TOTEM & CT-PPS status of upgrade project overview installation @ LHC -> 2016 Activities and goals -> TS 1, TS 2 diamond detectors in cylindrical - horizontal RP (4/5 & 5/6) -> installation completed during TS 1 timing detector electronics & cables & integration in readout -> 90% completed during TS 1 and short access after TS 1 -> needs 1 hour access to the tunnel at any stop (firmware) clock distribution (RF) -> thin RF cable installed & test successfully done during TS 1 -> completion during TS 2 -> electronic components & change of LHC power outlet (announced to Marzia) clock distribution (LASER) -> electronic cassette installed in tunnel during TS 1 -> power cable & test during any stop or TS 2 Si strip detector exchange -> prepared to be performed during TS 2 or earlier 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B goal: readout diamond tracking & combination with clock after TS 2 goal: maximize the use of Si strip in RP horizontal during 2016 TS 1/TS 2

Main milestones for 2016 Technical Stops -> status: achieved • Installation of components in

Main milestones for 2016 Technical Stops -> status: achieved • Installation of components in LHC tunnel during TS 1 and TS 2 Diamond detectors in RP cylindrical Electronic cassettes Clock TOTEM & CT-PPS Firmware Clock distribution Electronic cassettes Cooling lines TS 1: 6. 6. 2016 TS 2: 12. 9. 2016 • Tests & validations in test beam H 8 RP cylindrical Diamond installation and test in H 8 Start 26. 4. 2016 (9) 10/02/2022 RP cylindrical Diamond installation and test in H 8 Start 2. 6. 2016 (7) RP Si pixel Start 12. 7. 2016 (7) TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B Diamond > Start 16. 8. 2016 (7)

TOTEM & CT-PPS status of upgrade project overview installation @ LHC -> 2016 Activities

TOTEM & CT-PPS status of upgrade project overview installation @ LHC -> 2016 Activities and goals -> EYETS 2016 RP 210 – 220 secondary vacuum separation -> installation of new vacuum line (doubling circuit) -> new PLC software for control of pumps goal: different secondary vacuum pressure settings RP 210 & RP 220 different operational conditions of Si & diamonds RP unit vertical shift -> move RP units 210 m near/far vertically by 2 mm up / down -> x-ray of RF fingers done during TS 1 -> conclusion of movement direction -> 2 mm up or down relative to present position –> after vertical shift again x-ray goal: maximize the use of Si strip in RP horizontal during 2017 Equip RP 220 far (near? ) horizontals with RF shield and new circular ferrites -> open LHC vacuum (incoming/outgoing beam line) -> dismount detectors-> -> dismount RP horizontal -> equip with RF shield & ferrites -> bake out & spectrum -> re-install RP in LHC -> re-install beam-line -> bake out LHC between Q 5 and Q 6 -> re-install detectors -> LASER calibration -> re-commissioning of movement system from CCC 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B goal: use of RP 220 during standard operation in 2017: low -> ξ Total number of RPs inserted: 3 EYETS 2016

Main milestones for EYETS 2016 • RP vertical movement RP 210 & installation of

Main milestones for EYETS 2016 • RP vertical movement RP 210 & installation of RF shield RP 220 Dismount LHC beam tubes (in/out going) of zone Q 5 - Q 6 in sectors 4/5 & 5/6 Dismount RP detectors Dismount RP 220 horizontal / or RP 220 unit Exchange of ferrites & installation of RF shield in new RP vacuum chamber (NEG coated) at ip 5 Transfer of RPs to bake out / out gassing spectrum Prevessin (radioactive) Vertical shift of RP 210 x-ray of RP 210 bellows Transfer of RPs to ip 5 & reinstallation in LHC tunnel Close LHC beam line Bake out beam line Installation of RP detectors installation of new pixel tracking detectors Last days of access ~ week 15 EYETS: 5. 12. 2016 • Separation of secondary vacuum in RP 210 – RP 220 installation of new vacuum lines 10/02/2022 Laser calibration of RP 220 RP movement & interlock tests from CCC upgrade of PLC control system TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

LHC schedule now to EYETS 2016 Venting vacuum 2016 Preliminary schedule 2017 Dismount beam

LHC schedule now to EYETS 2016 Venting vacuum 2016 Preliminary schedule 2017 Dismount beam tube Dismount detector package RP 220 far 4 -5 & 5 -6 Dismount RP-unit 220 far 4 -5 & 5 -6 -> transfer to CMS RP zone surface lab Installation of RF shield & vacuum test RP bake out Prevessin Re – installation RP 220 far 4 - Bake out of Detector 5&5 -6 back in 4 -5 & 5 -6 LHC tunnel Between Q 5 - packages Q 6 Laser calibration & movement test Dismount remaining detector packages Access at 4 -5 & 5 -6 CT-PPS partially reduced access Last access to tunnel no access 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

Housing with faraday cage Faraday cage v. 4 8. 1. 2014 Present Housing Shielded

Housing with faraday cage Faraday cage v. 4 8. 1. 2014 Present Housing Shielded Housing Inox 0. 5 mm Cu 2 mm Support ring, var. 2 Ferrite Ø 195/Ø 162 x 5 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

Vacuum Chamber compatible with circular ferrite (production in Vacuum. Prage). 15σ position achieved NEG

Vacuum Chamber compatible with circular ferrite (production in Vacuum. Prage). 15σ position achieved NEG coated at CERN 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

ECR -> installation of RF shield in the RPs at 220 m -> under

ECR -> installation of RF shield in the RPs at 220 m -> under preparation Impact of design on LHC described 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

ECR -> Installation additional vacuum line -> under preparation present X. Pons EP-DT new

ECR -> Installation additional vacuum line -> under preparation present X. Pons EP-DT new 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

Work package (EP-DT) 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

Work package (EP-DT) 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

conclusion & summary (1) • Vacuum separation RP 210 & 220 goal: operate the

conclusion & summary (1) • Vacuum separation RP 210 & 220 goal: operate the detectors at different temperatures and different pressure settings (secondary vacuum) -> work Package under preparation & components purchased -> work can be done almost independent of other activities -> ECR needed -> under preparation • Vertical shift of RP 210 goal: enlarge the life time of the Si strip detectors -> x-ray of bellows performed during TS 1 (2016) -> method approved -> vertical shift of 2. 0 mm during EYETS -> for safe operation the beam pipe should be removed -> LASER survey by LHC -> x-ray after vertical shift necessary -> no ECR needed 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

conclusions & summary (2) • Installation of RF shield in RP 220 (far) goal:

conclusions & summary (2) • Installation of RF shield in RP 220 (far) goal: optimization of ξ reach (low) - validated design for LHC standard operation - RP 220 (far) can be inserted in combination with RP horizontal (RP 210 near/far or RP cylindrical) -> number of inserted RPs should be three (no increase of impedance) -> impedance budget of RP 220 horizontal in garage position minimized -> no effective impedance increase during RP insertion -> material budget of RP 220 (cascade effect from upstream RP -> shower development) closer to TCL 6 ! - implementation of activity in LHC EYETS schedule ongoing - components are purchased –> NEG coating of vacuum chambers has started on 17. 10. 2016 - manpower commitment almost complete -> ECR needed -> under preparation 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

Backup slides 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

Backup slides 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

Removal of horizontal units from PR stations 220 m (four units) Horizontal unit (70

Removal of horizontal units from PR stations 220 m (four units) Horizontal unit (70 kg) 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

Installation of diamond detectors in cylindrical RP 4/5 and 5/6 • Installation with tools

Installation of diamond detectors in cylindrical RP 4/5 and 5/6 • Installation with tools as used and approved in 2015 Diamond detector installed in cylindrical RP during TS 1 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B Detector package & champignon

Services for new RP timing detector 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10.

Services for new RP timing detector 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B Timing detector electronics

Radiation damage of sensor in horizontal RP very local -> change of vertical position

Radiation damage of sensor in horizontal RP very local -> change of vertical position of RP unit to enlarge detector lifetime x-ray campaign of RF finger during TS 1 Shift of RP unit vertically Procedure was approved by LHC vacuum group ~ 2. 0 mm x-ray analysis allow shift of ~ 2 mm 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B

Three different position of detector relative to beam allow extension of life time (zone

Three different position of detector relative to beam allow extension of life time (zone 1, 2, 3) Zone 3 Re-alignment necessary after change of RP unit position Zone 2 Zone 1 10/02/2022 TOTEM & CT-PPS TREX meeting 20. 10. 2016 J. B