Toe Wall and Water channels for erosion control Slides: 34 Download presentation Toe Wall and Water channels for erosion control Toe Wall and Garland drains for erosion control Cribbs on the slopes to stabilise the Bio mass Plantation on OB dumps after re-grading of slopes Biological engineering results SLOPES TREATMENT 2 nd October 2003 Treated Dump Slope at BPA OC-II Extn. Stabilized OB Dump as a Result of Bio-engineering Excavation, Green belt and Reclamation taken up Concurrently in an Opencast mine Raising of saplings at SCCL Nursery Rehabilitation of OB –Oct. 24 th 2002 -OC-I-GDK Stabilized OB as on 21 st Dec. 2003 -Result of Bio-engineering One Year Amla –result of nutrients addition – GK. OC Plantation in colonies Intensive treatment for better slope stabilisation GK-OC as during January 2005 –Vetiveria for arresting soil erosion and soil run off GK-OC as during October 2005 –Amla (15 months old). Garland drain along the boundary Continuous Cattle Proof Trench Bio-diversity conservation Bamboosetum Medicinal plants Cycas Aquatic habitat development Bamboo Plantation in front of RK 5 B Inc. Bamboo Plantation in front of RK 5 B Inc. Bamboosetum Palmatum • About 35 varieties of palms planted at one place as a germ plasm bank and rare site to see large no. of palms at one site. Endemic species conservation • The species that are unique to Chitoor and Cuddapah district in the world are planted in large numbers in SCCL area Nava graha Vanam Aquatic habitat development Converting waste into visual treat Creating aesthetic, clean &green working and living environment Nursery Coal handling plant Avenue plantation Nature park Green lungs Block Plantation at Srirampur Area