Outline • Case study of a collaborative project between Orange Egypt and Oscilloquartz •

Outline • Case study of a collaborative project between Orange Egypt and Oscilloquartz • Project objective: evolution of synchronization from TDM-frequency to PTP-phase • Evolution in phases • Constraints from the existing transport network and its evolution potential • Testing: can the performance objectives be met? • Comparison of PTP profiles for phase • Conclusions and future work 2 © 2018 ADVA Optical Networking. All rights reserved. Confidential.

Initial situation: TDM sync network / frequency MSC MGW GNSS BITS Clk Cesium Core

Initial situation: TDM sync network / frequency MSC MGW GNSS BITS Clk Cesium Core Elements BSC/RNC SSU Cesium Based PRC System BITS Clk MW Access Cloud Orange Property Core Site SDH Backbone Cloud 3 rd Party GNSS 3 rd party STM Clk GNSS Receiver GNSS Based PRC System Remote BSC/RNC Sites 3 2 G/3 G TDM Site BITS Clk MW Access Cloud Orange Property BITS Clk BSC/RNC © 2018 ADVA Optical Networking. All rights reserved. Confidential. 2 G/3 G TDM Site

1 st evolution: Sync. E sync network / frequency GNSS ts r po c.

1 st evolution: Sync. E sync network / frequency GNSS ts r po c. E n Sy BITS Clk Cesium MSC MGW Core Elements BSC/RNC SSU Cesium Based PRC System Sync. E Core Site GNSS 3 rd party STM c. E Clk yn S GNSS Receiver GNSS Based PRC System Remote BSC/RNC Sites 4 s rt o p MW Access Cloud Orange Property IP Backbone Cloud 3 rd Party Sync. E 2 G/3 G IP Site Sync. E MW Access Cloud Orange Property BITS Clk BSC/RNC © 2018 ADVA Optical Networking. All rights reserved. Confidential. 2 G/3 G IP Site

2 nd evolution: PTP sync network / frequency GNSS BITS Clk Cesium SSU Cesium

2 nd evolution: PTP sync network / frequency GNSS BITS Clk Cesium SSU Cesium Based PRC System G. 8 Core Elements 265. 1 Core Site MSC MGW BSC/RNC G. 8265. 1 IP Backbone Cloud 3 rd Party G. 8265. 1 GNSS G. 8265. 1 back up from Core GM GNSS Receiver GNSS Based PRC System Remote BSC/RNC Sites 5 MW Access Cloud Orange Property HDSL Cloud 3 rd Property G. 8265. 1 G. 8265. 1 2 G/3 G/4 G IP Site 2 G/3 G/4 G Small Cell IP Site G. 8265. 1 MW Access Cloud Orange Property BITS Clk BSC/RNC © 2018 ADVA Optical Networking. All rights reserved. Confidential. 2 G/3 G/4 G IP Site

Test 1: Macro Node-B via MW link with G. 8265. 1 6 MW PASSED

Test 1: Macro Node-B via MW link with G. 8265. 1 6 MW PASSED 6 © 2018 ADVA Optical Networking. All rights reserved. Confidential. ü

Test 2: Small Cell via HDSL link with G. 8265. 1 PASSED 7 ©

Test 2: Small Cell via HDSL link with G. 8265. 1 PASSED 7 © 2018 ADVA Optical Networking. All rights reserved. Confidential. ü

3 rd evolution: heading towards PTP phase sync • Intention to prepare the network

3 rd evolution: heading towards PTP phase sync • Intention to prepare the network infrastructure for phase synchronization in view of new LTE-A features such as Carrier Aggregation, COMP, e. ICIC • The following PTP options were considered: • ITU-T G 8275. 1 (Full On Path Support) • ITU-T G 8275. 2 (Partial On Path Support) • Limitations in Orange’s access network: • MW vendor A: MW systems “A 1” cannot be upgraded, systems “A 2” can be upgraded (software, license) • MW vendor B: existing “old” MW system cannot be upgraded to support BC; BC only with replacement by “new” MW systems Partial on path support Profile ITU-T G 8275. 2 was our closest solution to be tested with above limitations 8 © 2018 ADVA Optical Networking. All rights reserved. Confidential.

Test sequence 1: MW vendor “A” & G. 8275. 2 Router G. 8265. 1

Test sequence 1: MW vendor “A” & G. 8275. 2 Router G. 8265. 1 & G. 8265. 1 back up G. 8275. 2 from closest Core GM G. 8265. 1 & G. 8275. 2 GNSS Slave/Probe G. 8275. 2 (MW Only) gi n PTP APTS BITS Clk G. 8265. 1 BSC/RNC 6 OCT-WDY-NKL Get closer when TE> 1. 1 us By pa ss IP ro ut er to en h SADAT BSC MW Access Cloud 6 MW Hops ar m an c e GNSS Based PRTC System 9 © 2018 ADVA Optical Networking. All rights reserved. Confidential.

Results test sequence 1 (vendor “A”) FAILED TE collected over 6 MW links +

Results test sequence 1 (vendor “A”) FAILED TE collected over 6 MW links + 1 Router 10 10 FAILED TE collected over 2 MW links + 1 Router © 2018 ADVA Optical Networking. All rights reserved. Confidential.

Results test sequence 1 (vendor “A”) Cont. FAILED TE collected over 3 MW (Bypassing

Results test sequence 1 (vendor “A”) Cont. FAILED TE collected over 3 MW (Bypassing Router) 11 11 PASSED TE collected over 2 MW links (Bypassing Router) © 2018 ADVA Optical Networking. All rights reserved. Confidential. ü

Test sequence 2: MW vendor “B” & G. 8275. 2 Router G. 8265. 1

Test sequence 2: MW vendor “B” & G. 8275. 2 Router G. 8265. 1 Back up. G. 8265. 1 & G. 8275. 2 from closest Core GM G. 8265. 1 & G. 8275. 2 GNSS Slave/Probe G. 8275. 2 gi G. 8265. 1 ar MW Access Cloud 7 MW Hops BITS Clk BSC/RNC NBRYA-WST-1 Get closer when TE> 1. 1 us By pa ss IP ro ut er to en h an c e m GNSS Based PRTC System Amerya BSC n PTP APTS 12 12 © 2018 ADVA Optical Networking. All rights reserved. Confidential.

Results test sequence 2 (vendor “B”) FAILED TE collected over 5 MW links (Bypassing

Results test sequence 2 (vendor “B”) FAILED TE collected over 5 MW links (Bypassing Router) 13 13 FAILED TE collected over 2 MW links (Bypassing Router) © 2018 ADVA Optical Networking. All rights reserved. Confidential.

Results test sequence 2 (vendor “B”) Cont. PASSED ü TE collected over 1 MW

Results test sequence 2 (vendor “B”) Cont. PASSED ü TE collected over 1 MW link (Bypassing Router) 14 14 © 2018 ADVA Optical Networking. All rights reserved. Confidential.

Phase POC summary and way forward • G 8275. 2 PTP profile can be

Phase POC summary and way forward • G 8275. 2 PTP profile can be used over maximum 1 (vendor B) or 2 (vendor A) MW hops • Enabling G 8275. 1 BC is the only way to deliver phase over longer MW chains • MW vendor A: • • Upgrade all “A 2” MW systems for BC support Replace all “A 1” MW systems (not upgradeable) with new A 2 systems with BC Support • MW vendor B • • Replace the “old” MW systems (not upgradeable) with the “new” systems with BC Support OSA to Propose “Intermediate” cost effective Solution to enable phase delivery on hybrid chains until completing the full MW swap to “new” MW system • Schedule further tests to prove G. 8275. 1 performance 15 15 © 2018 ADVA Optical Networking. All rights reserved. Confidential.

3 rd evolution option 1: SFP Sync Plug@ “old” MW Vendor “ “New” “”old””

3 rd evolution option 1: SFP Sync Plug@ “old” MW Vendor “ “New” “”old”” PTP G 8275. 2 “”old”” “New” This scenario is not recommended as the PTP will encounter asymmetry on the old MW links 16 16 © 2018 ADVA Optical Networking. All rights reserved. Confidential. PTP G 8275. 1

3 rd evolution option 2: SFP Sync Plug @ “new” MW links PTP G

3 rd evolution option 2: SFP Sync Plug @ “new” MW links PTP G 8275. 1 PTP G 8275. 2 PTP G 8275. 1 This scenario recommended as the PTP will not encounter asymmetry 17 17 © 2018 ADVA Optical Networking. All rights reserved. Confidential.

Conclusions • Extensive performance testing was necessary to verify PTP Frequency/Phase whether existing network

Conclusions • Extensive performance testing was necessary to verify PTP Frequency/Phase whether existing network infrastructure is able to transport synchronization with the required performance • G. 8275. 2 PTP profile proved inadequate in microwave access network • G. 8275. 1 in the access network is the way to go in this case • Further tests with G. 8275. 1 are under way 18 18 © 2018 ADVA Optical Networking. All rights reserved. Confidential.

Thank you IMPORTANT NOTICE The content of this presentation is strictly confidential. ADVA Optical

Thank you IMPORTANT NOTICE The content of this presentation is strictly confidential. ADVA Optical Networking is the exclusive owner or licensee of the content, material, and information in this presentation. Any reproduction, publication or reprint, in whole or in part, is strictly prohibited. The information in this presentation may not be accurate, complete or up to date, and is provided without warranties or representations of any kind, either express or implied. ADVA Optical Networking shall not be responsible for and disclaims any liability for any loss or damages, including without limitation, direct, incidental, consequential and special damages, alleged to have been caused by or in connection with using and/or relying on the information contained in this presentation. Copyright © for the entire content of this presentation: ADVA Optical Networking.