Three sources of map distortion n Map scale





























































- Slides: 61
Three sources of map distortion n Map scale – most maps are smaller than the reality they represent. Map scales tell us how much smaller. Map projection – this occurs because you must transform the curved surface of the earth on a flat plane. Map type – you can display the same information on different types of maps.
Map scale – tells us relationship between distance on map and distance on earth’s surface n Ratio scale = ratio of map distance to earth distance. n 1: 10, 000 means that one inch on the map equals 10, 000 inches earth’s surface; one centimeter represents 10, 000 centimeters; or one foot equals 10, 000 feet. n Recall a small fraction has a large denominator so that 1: 100, 000 is a smaller scale than 1: 25, 000. n A large-scale map depicts a small area with great detail. n A small-scale map depicts a larger area with little detail. Distortion is especially severe here.
A. B. C. D. Which is the large -scale map?
Which map scale shows the most detail? a. 1: 250, 000 b. 1: 24, 000 c. 1: 100, 000 d. 1: 62, 500 1. 2. a. b. c. d. e. A map with a large scale usually shows a large amount of land space a small amount of land space physical features only of a land space the local-global continuum political boundaries between countries only
the other Scale n n Refers to at what scale a process occurs – For example, while the storm didn’t make the national news, at the local scale it was a major story.
Distribution • Density • Concentration • Pattern
Distribution definition n The arrangement of something across earth’s surface
Rank 1 Country China Population 1, 313, 661, 696 2 India 1, 129, 866, 154 3 United States 300, 535, 217 4 Indonesia 241, 973, 879 5 Brazil 186, 112, 794 6 Pakistan 162, 419, 946 7 Bangladesh 144, 319, 628 8 Russia 143, 420, 309
Rank Country Area – km 2 1 Russia 17, 098, 242 3 China 9, 640, 821 4 United States 9, 629, 091 5 Brazil 8, 514, 877 7 India 3, 287, 263 16 Indonesia 1, 904, 569 36 Pakistan 880, 254 94 Bangladesh 143, 998
Population Density
Population Density Asia
Density of Population, 2005
Brazil
Australia, 1997 1 dot = 1000 people
India
Population Density
Spatial Distribution n Definition: The regular arrangement of a phenomenon across Earth’s surface. Density: The frequency with which something exists within a given unit of area. n Concentration: The spread of something over a given study area n Pattern: The geometric or regular arrangement of something in a study area n
Describing Distributions
Describing Distributions
Land Ordinance of 1785
location, direction, distance site and situation
Toponym n Place Name!
Some Vocab: n n n Absolute Direction Absolute Distance Absolute Location n Relative Direction Relative Distance Relative Location
Absolute location mathematical location n Clemmons is: 36⁰ 01’ 17. 30” n 80 ⁰ 22’ 55. 15” n n N (longitude) W (latitude) 700 building 36 ⁰ 03’ 48. 84” N n 80 ⁰ 22’ 55. 15“ W n
Site physical attributes n n (includes absolute location, but includes the physical setting; especially in urban geography) What are the relevant site features of Clemmons? n n n Landforms Climate Soil quality Availability of water Vegetation
Relative location regional position relative to other places n n n (general spatial interconnection and interdependence) Clemmons is in the northwest piedmont section of Forsyth County Davidson County is to the south Davie County (Advance) is to the west Winston-Salem is 10 miles to the east Exit off I-40 & Hwy 421
Situation location attributes n n n (external relations, a type of relation location that refers to items of significance, especially in urban geography) Suburb of Winston-Salem, a bedroom community for persons working in the medical, bio technical/medical and aeronautical businesses in the Triad I-40 and US 421, major transportation
Absolute direction cardinal points N-S-E-W n Clemmons is southwest of Winston-Salem.
Relative direction culturally based, not necessarily an accurate cardinal point n n Clemmons is in the “South”. Clemmons is …
Absolute distance mathematical space between 2 points n Clemmons is 10 miles (16 km) from Winston-Salem.
Relative distance meaningful space measurement n n Clemmons is about 15 minutes from Winston-Salem. Clemmons is one hour from Mt. Airy.
“City of 2 Million” article
Vocabulary n n n Time-Space Convergence Distance Decay Friction of Distance
Use the terms… 1. Describe the absolute location, absolute direction and absolute distance of a place of your choice. 2. Describe the relative location, relative direction and relative distance of the same place. 3. Describe the site. 4. Describe the situation.
1. a. c. e. Which of the following is not a measure of relative distance? 2, 339 cm b. 35 seconds $2. 50 cab ride d. 216 footsteps 15 minutes
2. a. b. c. d. e. Relative location is an important geographic concept mainly because it locates places according to longitude and latitude defines a place in terms of how central or isolated it is to other places defines patterns of natural environment helps cartographers to develop more accurate maps illustrates how local, regional and global factors interact within the local-global continuum
Homework for tonight is Subway Activity #3
Diffusion The process by which an idea or innovation is transmitted from one individual or group to another across space Fellman
n People move to a new area and take their culture with them – examples include- crops, culture, farming techniques, building styles n Information about an innovation may spread through a society – examples include Hybrid corn, Cd’s, a religious creed. Possibly through mass media advertisement— Known as Relocation Diffusion Expansion Diffusion
Relocation Diffusion
Type of Expansion Diffusion n Contagious Diffusion Hierarchical Diffusion Stimulus Diffusion
Contagious Diffusion n Diffusion that spreads like a disease – but not necessarily applying only to diseases! Affects nearly uniformly all individuals and areas outward from the source region Examples – influenza, ideas on the world wide web; agriculture (like hybrid seeds), Buddhism (but not all religions), breaking news, Domino Theory
Hierarchical Diffusion n n The spread of an idea from persons or nodes of authority or power to other persons or places Examples- Birkenstocks, Christianity, styles of clothing, music
Stimulus Diffusion n n A fundamental idea, though not the trait itself, stimulates imitative behavior Examples – creation of a unique Cherokee written language, Beta vs. VHS, Macs, Siberians domesticated reindeers (after seeing domesticated cattle)
Diffusion? n http: //www. youtube. com/user/samsungm obileusa? v=nf 5 -Prx 19 ZM
Cultural Hearths • An area where cultural traits develop and from which the cultural traits diffuse. • Examples – Islam, agriculture,
Time-Distance Decay • The farther the place is from the hearth, the less likely an innovation is to be adopted. • The acceptance of an innovation becomes less likely the longer it takes to reach its potential adopters. • Cultural barriers work against diffusion.
n Types of Diffusion are not speed specific – no type of diffusion is particularly fast or slow
S-Curve Diffusion of innovations • 3% - innovators, 13% early adopters, 68% majority, 16% laggards •
• Which of the following type of diffusion spreads the quickest? a. b. c. d. e. Contagious Diffusion Hierarchical Diffusion Stimulus Diffusion Relocation Diffusion None of the answers
n Rap music first appeared in New York in the 1970’s. Later, it spread to large cities with vibrant African. American populations – such as Los Angeles, Oakland, Chicago, and Detroit – without being absorbed by the smaller cities and rural areas in between. This type of spatial diffusion is called a. relocation potential b. hierarchical diffusion c. contagious diffusion d. cultural diffusion e. cascade diffusion
n Which of the following is not a good example of a barrier to spatial diffusion? a. A mountain range b. A different language c. A different dietary preference d. A highway system e. A strict religious system
The Spanish-language concentration of Little Havana in Miami is an example of what type of diffusion? a. relocation diffusion b. expansion diffusion c. stimulus diffusion d. hierarchical diffusion
FRQ Practice – NO Notes Define and Give an example of • – – Relocation Diffusion Hierarchical Diffusion Stimulus Diffusion Contagious Diffusion (diseases not allowed)