ThompsonNicola Regional District tnrd ca ENVIRONMENTAL SERVICES PROJECTS

  • Slides: 21
Download presentation
Thompson-Nicola Regional District tnrd. ca ENVIRONMENTAL SERVICES

Thompson-Nicola Regional District tnrd. ca ENVIRONMENTAL SERVICES

PROJECTS - LANDFILLS • METHANE OXIDATION BED CONSTRUCTION • COMPLETE THE CLOSURE OF 3

PROJECTS - LANDFILLS • METHANE OXIDATION BED CONSTRUCTION • COMPLETE THE CLOSURE OF 3 LANDFILLS AT BARRIERE, CHASE AND CLEARWATER • CONTINUE WITH DEVELOPMENT OF METHANE OXIDATION BEDS AT CLOSED LANDFILLS - 13 BEDS INSTALED • HYDROSEED DISTURBED AREAS AT SEVERAL LANDFILLS, ECO DEPOTS AND BOROW AREAS THROUGH 0 UT OUR TNRD WASTE MANGMENT SYSTEM - 9 LOCATIONS Thompson-Nicola Regional District tnrd. ca

29 LANDFILLS – REDUCED TO 2 LANDFILLS Logan Lake Avola Lower Nicola Barriere Westwold

29 LANDFILLS – REDUCED TO 2 LANDFILLS Logan Lake Avola Lower Nicola Barriere Westwold Agate Bay/Adams Lake Chase Lytton Aspen Grove Birch Island Blue River Brennan Creek Brookmere Ashcroft/Cache Creek Monte Lake Lower Nicola Lytton Mc. Lure Heffley Creek Paul Lake Landfill (2) Pritchard Ashcroft/Cache Creek Clinton Lac Le Jeune Little Fort Clearwater Loon Lake Mamit Lake Thompson-Nicola Regional District tnrd. ca

Thompson-Nicola Regional District tnrd. ca LANDFILL CLOSURES

Thompson-Nicola Regional District tnrd. ca LANDFILL CLOSURES

Thompson-Nicola Regional District tnrd. ca CHASE CLOSED LANDFILL -FINAL CONTOURS

Thompson-Nicola Regional District tnrd. ca CHASE CLOSED LANDFILL -FINAL CONTOURS

CHASE TOPSOIL MIXING AREA 1/3 PARTS OF SAND, BIOSOLIDS, AND CHIPS

CHASE TOPSOIL MIXING AREA 1/3 PARTS OF SAND, BIOSOLIDS, AND CHIPS

CLEARWATER LANDFILL DURING OPERATION

CLEARWATER LANDFILL DURING OPERATION

BARRIERE LANDFILL BIOSOLIDS

BARRIERE LANDFILL BIOSOLIDS

LOWER NICOLA LANDFILL WOOD CHIPS

LOWER NICOLA LANDFILL WOOD CHIPS

METHANE BEDS q. PLAN FOR SHRINKAGE - MIXING THE 2 COMPONENTS TEND TO BULK

METHANE BEDS q. PLAN FOR SHRINKAGE - MIXING THE 2 COMPONENTS TEND TO BULK UP THE FINISHED PRODUCT (2 X WOODCHIPS TO 1 PART BIOSOLIDS) q. LOGISTICS WITH HAULERS , PLAN FOR DELAYS q. MAINTENANCE - SEED STOCKPILES OF BIOSOLIDS WITH A COVER CROP q. BED MONITORING CAN BE TEDIOUS AND USE UP VALUABLE STAFF TIME q. MORE LABOR INTENSIVE THAT A GROUND WATER MONITORING PROGRAM q. REDUCTIONS ABOVE 90 PERCENT IN METHANE GENERATION CAN BE ACHIEVED q. MAINTENANCE IS LABOUR INTENSIVE ALLU MIXER ON AN EXCAVATOR

LOGAN LAKE LANDFILL

LOGAN LAKE LANDFILL

LOGAN LAKE CLOSED LANDFILL – CLOSED IN 2002

LOGAN LAKE CLOSED LANDFILL – CLOSED IN 2002

HYDROSEEDING: LOAD RATES : q 25 BAGS / 300 O GALONS OF WATER q.

HYDROSEEDING: LOAD RATES : q 25 BAGS / 300 O GALONS OF WATER q. TIMING IS CRITICAL REGARDING THE WEATHER q. ADDING TAKIFIER CAN AID IN KEEPING THE MULCH WHERE YOU PUT IT

Thompson-Nicola Regional District tnrd. ca THE END

Thompson-Nicola Regional District tnrd. ca THE END

Louis Creek Grand Opening

Louis Creek Grand Opening

South Thompson Eco Depot

South Thompson Eco Depot

Weigh Scale at South Thompson

Weigh Scale at South Thompson

Clearwater Eco Depot

Clearwater Eco Depot

Transfer Station Closures

Transfer Station Closures

vs