IDPU Status Requirements No Changes to requirements since FM 1 PER Requirements discussed in

IDPU Status Requirements No Changes to requirements since FM 1 PER Requirements discussed in Instrument Suite Overview. Assembly FM 1, FM 2, FM 3 Boards Completed. Boxes Assembled. FM 1 has 1 cycle TVAC, 1 axis workmanship vibration to go. FM 2 & FM 3 Ready for Vibration this week. FM 4 IDPU Integrated, will go to Suite I&T this week. FM 5 IDPU boards – 5 ready, LVPS in assembly. THEMIS Instrument FM 2/FM 3 PER IDPU-2 Teleconference 8/30/2005

PFR #42 EFI Clock shorted on FM 2 IDPU DCB • EFI Clock on

PFR #42 EFI Clock shorted on FM 2 IDPU DCB • EFI Clock on DCB inadvertently shorted to ground during testing for short period. • AC 14 Driver part probably overstressed and therefore replaced. • PFR Closed. THEMIS Instrument FM 2/FM 3 PER IDPU-3 Teleconference 8/30/2005

PFR #45 ESA packet sequence counter non-sequential • Sequence counter in packet does not

PFR #45 ESA packet sequence counter non-sequential • Sequence counter in packet does not increment correctly in data played out to GSE. • Only very small amount of data affected. • PFR Open. THEMIS Instrument FM 2/FM 3 PER IDPU-4 Teleconference 8/30/2005

PFR #46 ESA Initialization command, 6 A 00 not executing correctly • Commands not

PFR #46 ESA Initialization command, 6 A 00 not executing correctly • Commands not received by ESA when initialize command sent from GSE. • Analysis showed that the FSW was using the wrong address to find the ESA initial command set table. • PFR Closed. Update to FSW included in latest release. THEMIS Instrument FM 2/FM 3 PER IDPU-5 Teleconference 8/30/2005

PFR #47 Low Speed FGM data timing problem • When running the FGM CPT

PFR #47 Low Speed FGM data timing problem • When running the FGM CPT timing gaps were seen in the data. • Traced to a GSE problem, fixed and included in latest version of GSE. • PFR Closed. THEMIS Instrument FM 2/FM 3 PER IDPU-6 Teleconference 8/30/2005

PFR #51 Reversed Capacitor on FM 3 LVPS • IDPU Voltages from LVPS dropped

PFR #51 Reversed Capacitor on FM 3 LVPS • IDPU Voltages from LVPS dropped out of range during LVPS Board Level Testing • Problem found to be capacitor installed by J&T backwards. • Fixed by replacing the capacitor. • PFR Closed. THEMIS Instrument FM 2/FM 3 PER IDPU-7 Teleconference 8/30/2005

PFR #56 Anomaly during FM 1 CPT • During CPT on FM 1 an

PFR #56 Anomaly during FM 1 CPT • During CPT on FM 1 an anomaly was observed on the IDPU when plugging in the SPB simulator harnesses into the simulator motors. • It was discovered that the connector on the harness was inserted into the simulator upside down. • The harnesses did not have pin 6 populated and it was possible to plug the harness connector in the wrong way around. • An analysis was done and no permanent affect on the IDPU hardware. • Flight Enable Plugs not affected • Simulator harnesses now all contain pin 6 to make it impossible to invert. THEMIS Instrument FM 2/FM 3 PER IDPU-8 Teleconference 8/30/2005

PFR #60 ESA Cover readback problem observed on FM 1 • During the IDPU/ESA

PFR #60 ESA Cover readback problem observed on FM 1 • During the IDPU/ESA TVAC on FM 1 it was noted that the Housekeeping monitor was not changing to reflect door status. • Analysis and testing showed that the SMA power return line was not connected to AGND as required by the readback circuit to show status. • Fixed on LVPS connecting SMA Rtn and AGND. • PFR Closed. Modification now in assembly instructions. THEMIS Instrument FM 2/FM 3 PER IDPU-9 Teleconference 8/30/2005

PFR #64 SST digital HK incorrect and shifting in memory • During TVAC the

PFR #64 SST digital HK incorrect and shifting in memory • During TVAC the SST digital housekeeping was seen to either be wrong or shifting in memory. • FSW was reading the ETC register too quickly. Code modified to increase time to read register. • Update is include in FSW 2. 06 or higher. • PFR Closed. THEMIS Instrument FM 2/FM 3 PER IDPU-10 Teleconference 8/30/2005

PFR #65 EFI Packet problems during continuous mode • During TVAC playback of EFI

PFR #65 EFI Packet problems during continuous mode • During TVAC playback of EFI data during continuous mode showed incomplete packets, missing packets or out of sequence packets. • ‘Bottom feeding’ Mode • PFR Open. Analysis shows most likely increasing “packet minimums” will solve this problem. THEMIS Instrument FM 2/FM 3 PER IDPU-11 Teleconference 8/30/2005

PFR #66 ESA Packets not arriving at GSE • During TVAC on FM 1

PFR #66 ESA Packets not arriving at GSE • During TVAC on FM 1 Suite it was observed that ESA packets were not being received by the GSE. • Analysis of the GSE scripts showed that ESA data had been disabled by command. Fix was to re-enable packets and correct script. • PFR closed. • Request was placed to FSW to add ability to command ESA and SST functions separately in the ETC. Included in thm_fsw_007 G_Changes. doc (Version 2. 10 software). THEMIS Instrument FM 2/FM 3 PER IDPU-12 Teleconference 8/30/2005

PFR #67 Temperature dependence of 28 V Actuator Monitor on IDPU-PCB • During TVAC

PFR #67 Temperature dependence of 28 V Actuator Monitor on IDPU-PCB • During TVAC it was noticed that the monitor reading of the 28 V Actuator supply varied with temperature • Analysis of the circuit showed that an opto-coupler in the circuit was being overdriven causing an error in the output over temperature. • Fixed on the PCB with 3 resistor changes. • PFR Open, will be closed after TVAC on FM 1. PCB modification done to all boards. THEMIS Instrument FM 2/FM 3 PER IDPU-13 Teleconference 8/30/2005

PFR #69 Ripple on 28 V power supply from LVPS • During the ESA

PFR #69 Ripple on 28 V power supply from LVPS • During the ESA HV test during FM 1 TVAC a ripple was noticed on the 28 V power line to the LVPS. • The LVPS was tested on the bench for varying loads at different input voltages. At half load and input voltage of 33 V oscillations were discovered at the input. • Fixed by removing a capacitor. • PFR Closed. Modification now in assembly instructions. THEMIS Instrument FM 2/FM 3 PER IDPU-14 Teleconference 8/30/2005

PFR #75 ESA Power tripped off during HV Turn on in TVAC • While

PFR #75 ESA Power tripped off during HV Turn on in TVAC • While powering up the High Voltage supplies on the ESA the supply tripped on the PCB board. • Testing on FM 2 ESA showed inrush current on HV above trip point on PCB. • Fixed by using ability to disable current trip on PCB during HV turn on and ramp up (Procedural). • PFR Closed. THEMIS Instrument FM 2/FM 3 PER IDPU-15 Teleconference 8/30/2005

PFR #80 IDPU Board Shield Mechanical Fouling Issue • During the first FM 2

PFR #80 IDPU Board Shield Mechanical Fouling Issue • During the first FM 2 CPT the SST tripped off when turned on. • It was discovered that a capacitor on the DAP board was shorting out by touching the board shield below (on BEB). • It was decided to manufacture new board shields made from FR 4 with a conductive plan in between for the BEB, DFB & DCB to prevent this problem reoccurring after vibration etc. • New board shields have been installed and work fine. • Analysis of the DAP board was carried out and shown that no damage was done to the DAP board from the shorted capacitor. • PFR Closed. THEMIS Instrument FM 2/FM 3 PER IDPU-16 Teleconference 8/30/2005

PFR #81 SST SMA Attenuator Open/Close Readback problem observed on FM 2 • Housekeeping

PFR #81 SST SMA Attenuator Open/Close Readback problem observed on FM 2 • Housekeeping not reading back correct position of SST Attenuators. Attenuator actuation not affected. • Grounding problem related to PFR #60 • Fixed on LVPS on all units to tie SMA Return to AGND. (Rework) • PFR Closed. LVPS modification now in assembly instructions. THEMIS Instrument FM 2/FM 3 PER IDPU-17 Teleconference 8/30/2005

PFR #89 PCB P 10 V IMON Increased current draw • During the first

PFR #89 PCB P 10 V IMON Increased current draw • During the first FM 3 CPT it was noticed that the P 10 V current monitor was reading high. • Testing of circuit showed that when heat was applied to the op-amp in the current monitor circuit, the output fluctuated. Comparing this to the FM 5 board this was out of character behavior. • Fixed by replacing op-amp. Testing repeated and monitor now within range. • PFR Closed. THEMIS Instrument FM 2/FM 3 PER IDPU-18 Teleconference 8/30/2005

PFR #92 FM 2 Assembly problem • During the assembly of FM 2 IDPU

PFR #92 FM 2 Assembly problem • During the assembly of FM 2 IDPU to ESA a longer length screw was used than called out for which caused damage to a resistor and jumper on the LVPS. • The damaged parts on the LVPS were replaced and the unit retested. • Assembly drawing is modified to be clearer and now printed out on cleanroom paper for reference when IDPU and ESA are mated. • PFR Closed. THEMIS Instrument FM 2/FM 3 PER IDPU-19 Teleconference 8/30/2005

PFR #93 DFB Front Plate Mechanical Issue • During disassembly of FM 2 IDPU

PFR #93 DFB Front Plate Mechanical Issue • During disassembly of FM 2 IDPU the DFB front plate was bent when extracted. • The front plate was re-adjusted and a new extraction tool was manufactured. • PFR Closed. THEMIS Instrument FM 2/FM 3 PER IDPU-20 Teleconference 8/30/2005

FSW Changes All Updates to FSW are recorded in THEMIS IDPU Flight Software Change

FSW Changes All Updates to FSW are recorded in THEMIS IDPU Flight Software Change Requests document – thm_fsw_007 G_Changes. doc. THEMIS Instrument FM 2/FM 3 PER IDPU-21 Teleconference 8/30/2005

FM 1 PFR #61 EFI LVPS 1 Floating Supply Y Monitor out of specification

FM 1 PFR #61 EFI LVPS 1 Floating Supply Y Monitor out of specification during TVAC • During TVAC the Y monitor for the EFI floating supply was seen to have a strong temperature dependence. • Testing of the LVPS board showed a problem with the Y transformer. • Transformer was rewound and retested. • PFR will be closed after FM 1 TVAC single cycle due this week. THEMIS Instrument FM 2/FM 3 PER IDPU-22 Teleconference 8/30/2005