The Steel Tracking System from P 2 Programs
- Slides: 26
The Steel Tracking System from P 2 Programs Bar Code Presentation Click to start the presentation
Process Overview Fab. Suite Tekla Structures KISS File XSR File Romac KISS File (Automatic) Steel Tracking System Print Bar Code Labels Apply Labels at the Appropriate Station KISS File Fab. Trol EJE File EJE Industries Text Files & Custom Modules P 2 Programs 2007
Process Overview Begin Scanning at Stations - Saw - Beam Line - Layout - Final - Shipping - etc. Update External Software Packages - Fab. Suite (Real-Time) - Tekla Structures - etc. After the Piece Marks are Loaded and Shipped, an Electronic File can be E-mailed to the - Galvanizer - Fire. Proofer - Painter - Job Site. - etc. RF Mobile Computer RF Server P 2 Programs 2007
Process Overview At the Outside Process, (Galvanizer, Painter, Job Site, Etc. ) the Bar Code is Scanned as it is Received, Shipped or Moved. Electronic Files from the Outside Process Transactions are E-mailed to the Fabricator. STS at the Fabricator Updated with the Electronic Files. Update External Software Packages - Fab. Suite (Real-Time) - Tekla Structures - etc. Batch Scanner P 2 Programs 2007
New Features Internal Features • BOM Imports • Weld Number Tracking • Minor Piece Mark Tracking • Discarding Member Types during import (EJE & KISS) • Routing Codes • New Windows CE Devices for Batch Data Collection. P 2 Programs 2007
New Features Radio Frequency (RF) Interface • Welder Stencil Tracking by Weld Number • Build Assemblies with Major & Minor Heats #’s • Routing Code Enforcement • Interface into Fab. Suite for Real-Time Updating • Mecco Stamper Support P 2 Programs 2007
New Features External Features • Direct Integration with Fab. Suite for raw material receipt through piece mark shipping • Improved Integration with WTS • Import / Export Tekla Structures Attribute Information • Activity File Being Sent with Mark/Unique P 2 Programs 2007
Window used to import sheet information into the STS package. Information includes the BOM, border and piece marks. P 2 Programs 2007
Fab. Suite is updated real-time with the STS RF system. P 2 Programs 2007
Mecco marking system being used at Performance Contractors. User scans the ID number and RF system send the piece mark info to the stamper through an RS-232 connection. P 2 Programs 2007
To view the Attributes of a member in Tekla Structures, select the User-defined attributes button at the bottom of the Beam properties window. P 2 Programs 2007
To color the model in Tekla Structures, go to the Setup>Colors menu and select the option to color the model by “Attributes”. The dark grey members shown here are the members that have been through the Beam Line. P 2 Programs 2007
Cost Savings at Dow Chemical Job Sites • Key slides from a Power. Point presentation by Rob Wubbenhorst from Dow Chemical. P 2 Programs 2007
Equipment
Steel Tag • Produced and applied by Galvanizer
Scanner download
Indirect Benefits on Pilot Projec • Cost avoidance of lost/missing piecemark reconciliation – Assumption 1% of piecemarks received are lost/misplaced – Total 55, 000 pieces = 550 would have been lost w/out bar -coding – Ea. piece costs $140 to reconcile/find = $77, 000 • This does not include the emergency fabrication/logistic costs of lost pieces which are $1000/piece minimum • Time savings to receive loads – Based on numerous time/productivity surveys $150/load – 400 loads for the three projects= $60, 000 – This is a Productivity savings, the staff were still on headcount, just able to do more work (planning,
Direct Benefits on Pilot • Marshalling resource for receiving was not needed for one year during peak time due to technology of barcode receiving and leveraging of available resources. • Contingent Marshaller $25/hr • 1. 0 FTE year = $52, 000 saved
Cost Savings at Performance Contractors • Key slides from a Power. Point presentation by Ray Pouciau from Performance Contractors. P 2 Programs 2007
User Benefits § A clerk position was eliminated that previously entered tag and line numbers from drawings into the system. Approximate annual savings: $25, 000. § Accuracy of shipping tickets has improved 3 -5% overall.
Q. C. Benefits § The Q. C. department reduced staff hours creating an approximate savings of $35, 000 per year. § Reports now indicate what NDE was done per load; reducing staff time spent compiling this information from 3 hours to an average of 20 minutes. § At least 30% more Q. C. time is now being spent on productivity. § Due to the use of STS software, we now produce more detailed reports.
Shop Benefits § A global building material list can now be produced which enables the shop to identify shorts faster and with more accuracy. § A report can be generated indicating material availability by priority. § A report can be generated to indicate a “short list” by iso and item numbers.
Tagging Benefits § The bar code is scanned and printed on a metal tag, incorporating a safer method to make tags vs. manually stamping. § The automated stamping method resulted in an approximate $20, 000 per year savings.
Start an RF scanner and select one of the menu options to begin capturing your shop floor transactions. P 2 Programs 2007
Use the Steel Tracking System and bar code technology for a complete picture of your project. From the receipt of the raw material all the way to erection at the job site! P 2 Programs 2007
Your Bar Code Software Solution Contact P 2 Programs for more information at 1. 800. 563. 6737 or visit our web site at www. p 2 programs. com P 2 Programs 2005
- Metal tracking system
- Fabsuite software
- Collection of programs written to service other programs.
- Monopolistic competition examples
- Utility programs are a type of
- 2 categories of software
- Hát kết hợp bộ gõ cơ thể
- Frameset trong html5
- Bổ thể
- Tỉ lệ cơ thể trẻ em
- Gấu đi như thế nào
- Tư thế worms-breton
- Alleluia hat len nguoi oi
- Môn thể thao bắt đầu bằng chữ đua
- Thế nào là hệ số cao nhất
- Các châu lục và đại dương trên thế giới
- Công thức tiính động năng
- Trời xanh đây là của chúng ta thể thơ
- Cách giải mật thư tọa độ
- 101012 bằng
- Phản ứng thế ankan
- Các châu lục và đại dương trên thế giới
- Thể thơ truyền thống
- Quá trình desamine hóa có thể tạo ra
- Một số thể thơ truyền thống
- Cái miệng xinh xinh thế chỉ nói điều hay thôi
- Vẽ hình chiếu vuông góc của vật thể sau