The Midterm Group Project And Midterm Exam Exam

  • Slides: 6
Download presentation
The Midterm Group Project And Midterm Exam

The Midterm Group Project And Midterm Exam

Exam # 1 • 30 minutes long • 20 multiple choice questions • Covers

Exam # 1 • 30 minutes long • 20 multiple choice questions • Covers Lessons 01 – 07 • Covers: • Lessons 01 -07 • Concepts and Terminology (Fact, Degenerate Dimension, etc…) • Application of them (What’s wrong with this fact table? )

Project: What you must do 1. Determine 4 business processes from your business idea

Project: What you must do 1. Determine 4 business processes from your business idea which runs on the nop Commerce platform. 2. For these 4 processes, complete your group design document up to and including High-Level Design. (See Syllabus For Details) 3. Prepare a 10 minute presentation of your business processes and its design.

The Presentation • • Keep it to 10 minutes, tops. Follow the format of

The Presentation • • Keep it to 10 minutes, tops. Follow the format of your design document Explain your business idea Cover what you plan to model, including: • • Business processes, facts and dimensions How you will conform your dimensions to create an enterprise DW. How you will collect data from the sources / acquire the data for the DW Those things you have yet to figure out • I will give you feedback and it is expected you will adjust your Design document accordingly. • Final editied draft of the design document is due by the end of the day.

Grading Rubric Performance Exemplary 10 Outstanding 9 Satisfactory 8 Unsatisfactory 7 or lower Criteria

Grading Rubric Performance Exemplary 10 Outstanding 9 Satisfactory 8 Unsatisfactory 7 or lower Criteria Complete design document up to / including High-Level Design based on 4 business processes. Organized presentation hits on all key points. Presentation kept to 5 -10 minutes. No glaring issues with dimensional model designs. Only one of the exemplary criteria not met. This includes one issue with dimensional model design. 1 -2 exemplary criteria not met. More than 1 issue with dimensional model design. 3 or more project criteria are not met. Poor or missing designs.

Group Project Work. Take remainder of class time to work on your project.

Group Project Work. Take remainder of class time to work on your project.