The Basic Training on Management of WGS84 Data
The Basic Training on Management of WGS-84 Data Survey and Data Quality for Civil Aviation in Vietnam 5 - 9 December 2011 The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1
THE BASIC TRAINING ON MANAGEMENT OF WGS-84 DATA SURVEY AND QUALITY FOR CIVIL AVIATION IN VIETNAM 1. Title: WGS-84 Data Survey Training in Cat Bi Airport & Development of WGS-84 Database in Vietnam (2011) 2. Short-term Experts: 2 Surveyors 3. Term: from 5 to 9 December (5 working days) 4. Objectives: To understand 1) What WGS-84 & WGS-84 Survey are/Why WGS-84 is required 2) What ICAO Standards for WGS-84 are 3) What Long base-line analysis is/Why it is required 4) Process of determining WGS-84 coordinate 5) How to analyze the existing WGS-84 survey data 6) How to analyze Total Station Data for position of facilities & obstacle 7) How to manage survey data quality 8) How to maintain survey data, including development of database The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 2
SEMINAR ON THE SATELLITE-BASED AIR NAVIGATION AND WGS-84 5. Seminar Program : � � � 08: 30 Registration (to be decided by CAAV) 09: 00 Opening � Remarks by CAAV � Remarks by JICA Project Leader 09: 30 Current Situation on the Management and Application of WGS-84 CA in Vietnam by Mr. Tran Tuan Linh, CAAV 10: 00 GPS technology and Satellite Based Air Navigation System by JICA Expert 10: 30 Coffee break 10: 45 WGS-84 basic theory and WGS-84 survey by JICA Expert 11: 30 -13: 30 Lunch hosted by JICA 13: 30 ICAO Specification of WGS-84 implementation & WGS-84 survey plan by JICA Expert 14: 00 WGS-84 coordinate survey managed by government and Data management in Japan by JICA Expert 14: 30 Outline of AIS with WGS-84 Coordinate by JICA Expert 15: 00 Summary 15: 30 Closing Remarks by CAAV The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 3
CONDUCT OF WGS-84 DATA SURVEY & DEVELOPMENT OF WGS-84 DATABASE 6. Expected Achievements: a) To publish WGS-84 coordinates of Air Navigation Facilities in AIP b) To authorize the surveyed data in Database for civil aviation use c) To operate WGS-84 Database system d) To develop next WGS-84 Data survey plan? e) To conduct WGS-84 survey by National Geographic Department? and/or CAAV, or to arrange WGS-84 Data survey to be conducted by other agency on a contract-based 7. Who should participate and can benefit: Organizations/Agencies responsible for flight procedure design/approval/implementation as well as WGS-84 data survey and management a) CAAV b) VATM c) NAC/MAC/SAC d) MONRE The for Capacity Development for Transition to e) Project ATEC, Survey agencies the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 4
OTHERS Evaluation/Assessment of the Training ✈ Feedback from Counterparts participating in the Training is essential for JICA and Project to improve our programs. Training Certificate ✈ Certificate will be issued to participants who have attended all the Sessions and actively participated in activities (Participants will also be evaluated by JICA) ✈ Certificate is jointly signed by DCA DG CAAV DG and JICA Project Leader The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 5
WGS-84 DATA SURVEY EXPERTS Mr. Yuji NAKAGAWA Manager, Osaka Branch, Nippo Co. Ltd, . 1 st Class License for Surveyor Professional Engineer (Registered in the fields of “Steel and Concrete Structure” & “Planning of Construction”) Mr. Yohei SHINDE Chief Surveyor, Nippo Co. Ltd, 2 nd Class License for Surveyor Certificate for Bernese Introductory Course The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 6
ELEMENT OF PBN IMPLEMENTATION 1) WGS-84 üSurveying procedures, Software, training, Procedures 2) Design of RNAV air routes üPBN Training in CAAV, Standards, PBN Procedure 3) Flight validation ü Equipment, RADAR coverage 4) AIS (ISO 9001, e. AIP publication, NOTAM automation) üQMS manual, AIS-DB, Training RNAV Route ü @RNAV road map @Air traffic controller training @Airline company implementation - Avionics , Training, operation procedures @RAIM prediction ü Equipment GPS 5) RNAV, RNP operational approval üHand book, Training The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 7
Please Switch Off Your Mobile Phone or Use Vibration Mode in the Conference Room Thank You for Your Understanding and Cooperation The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 8
- Slides: 8