TF-MSP Utrecht, February 2013 John DYER dyer@terena. org www. terena. org CEF – Readiness Study
Background of CEF › President: José Manuel Durão Barroso › 19 Oct 2011: Press Conference, Brussels › Kostas Glinos: Head of Unit DG-CNECT › 26 Oct 2011: Presentation at TERENA GA › Links › www. terena. org/tf-msp/documents/ecpublic/ › Proposal to be part of Horizon 2020 › Running period: 2014 - 2020
The Connecting Europe Facility (CEF) › Transport 31. 7 billion Euros (inc. cohesion fund 10 billion) › Energy 9. 1 billion Euros › Key Digital Infrastructure 9. 2 billion Euros › TOTAL: 50 billion Euros
Key Digital Service Infrastructures › Total Investment in key DSI ~ 9 billion › Broadband 7 billion › encourage local companies to improve connectivity for European citizens: 30 Mbps minimum at least 50% at 100 Mbps › Backbone for Public Administration 2 billion
Why DSI? › › Global Economic Crisis Public Admin costs need to be reduced Duplication of Infrastructure – Expensive US Unified Community Anchor Network (UCAN) SOCIAL HEALTH CULTURE
The NREN / GÉANT model
Three Possible Scenarios
EC DG-CNECT (INFSO) Tender invitation 4 Jul 2012 - SMART 2012/0048 Study of the readiness of Member States for a common pan-European network infrastructure for public services (max € 500 k) › Coverage › High speed and connectivity between public institutions of the EU in areas such as public administration, culture, education and health. › Core service platform › Infrastructure based existing Internet backbone and where necessary new networks will be deployed. › Generic services › Authorisation, authentication, inter-domain security and bandwidth on demand, federation of services, mobility management, quality control and performance control, integration of national infrastructures.
Readiness Study Objectives › Establish a Knowledge Base › Analysis of Current Situation › Outreach and Dissemination › Scenarios and Recommendations
R&E Networking Community › Agreement: › › TERENA General Assembly NREN PC European NREN CEOs TERENA and DANTE Management › TERENA and DANTE collaborate › TERENA point of contact with study › The Community would NOT submit proposal: › › We wanted to ensure influence Lack of expertise across all sectors We could be excluded if unsuccessful Positioned ourselves as a primary STAKEHOLDER to be consulted
Status 31 January 2013 › TERENA contacted 14 consultancies with proposal to collaborate as primary STAKEHOLDER › EC received 5 proposals › EC Contract awarded December 2012 Capgemini Nederland, representing a consortium of Capgemini and Deloitte Belgium Project Inception Meeting: 22 January 2013
Timeline 2013 Jan Inception Meeting Now Email discussion list <cef-discuss@terena. org> ? Community Workshop? June CEF Bo. F at TNC 2013 Maastricht (Monday) June Presentation by partners to TERENA GA? July Interim Study Report Sept Project Conference 2 days, hosted by EC Dec Final Study Report presented to EC
Community Engagement › Documentation › TF-MSP Document Store: › www. terena. org/tf-msp/docuemnts/ecpublic › Open email distribution list › cef-discuss@terena. org › Self subscribe at: › www. terena. org/mailinglists. php › Let’s engage Email: dyer@terena. org