Test plan of ESS Spoke series CM Han Li On behalf of FREIA team

Test plan of ESS Spoke series CM Han Li On behalf of FREIA team FREIA Laboratory, Uppsala University Oct. 2020 1

List of minimum tests 1 Central cavity frequency To reach 352. 21 MHz Within

List of minimum tests 1 Central cavity frequency To reach 352. 21 MHz Within step tuner linear zone Provide corresponding step tuner setting 2 Loaded Q Both 3 d. B BW and decay measurement, 1. 75 -2. 85 E 5 3 Static heat load 4 Dynamic heat load for both cavities from 8 to 12 MV/m Less than 5 W per CM at nominal Eacc 5 Q 0 Calorimetric measurement Higher than 1. 5 e 9 at 9 MV/m 6 Reach gradient of 12 MV/m Quench point if it is lower than 12 MV/m 7 Tuning sensitivity of the slow step tuner Provide parameter of full steps 8 Frequency shift due to cool down 9 Stabilization of the cavity field with LLRF using both RF and piezo tuner compensation Optional only for 1 st CM full LFD compensation up to the specifications only when piezo feedback is fully developed 10 Stabilization of the CM for long-term operation only for 1 st CM 11 Field emission onset 12 Multipacting 2

Methods for the main test items 1 Central cavity frequency S parameter measurement via

Methods for the main test items 1 Central cavity frequency S parameter measurement via vector network analyzer 2 Loaded Q Both 3 d. B BW and decay measurement 3 Static heat load 4 Dynamic heat load for both cavities from 8 to 12 MV/m Calorimetric measurement via the flowmeter placed after the sub-atmospheric pumps 5 Q 0 6 Reach gradient of 12 MV/m 7 Tuning sensitivity of the slow step tuner 8 Frequency shift due to cool down 9 Stabilization of the cavity field with LLRF using both RF and piezo tuner compensation 10 Stabilization of the CM for long-term operation 11 Field emission onset X-ray observation as a function of gradient 12 Multipacting Conditioning with ESS LLRF open loop / auto-conditioning Lab. View program PID/Open loop operation with ESS LLRF system S parameter measurement via vector network analyzer PID operation with ESS LLRF system 3

Warm Test Cool Down ü Central cavity frequency ü Qext ü Frequency shift ü

Warm Test Cool Down ü Central cavity frequency ü Qext ü Frequency shift ü Coupler cold conditioning due to cool down ü Central frequency ü Pressure sensitivity ü Loaded Q and Qe ü Tuning range of the slow step tuner ü Cavity conditioning ü Steady heat load of CM ü Q 0 ü Dynamic heat load ü Reach 9 MV/m ü Stabilization of the cavity field ü Coupler warm conditioning Cold Test Open loop SEL ( back up) VNA ESS LLRF PID Warm Up CRYO 4