TAKLIMAT KEPADA AHLI –AHLI PARLIMEN LYNAS ADVANCED MATERIAL PLANT (LAMP)

TAKLIMAT KEPADA AHLI –AHLI PARLIMEN LYNAS ADVANCED MATERIAL PLANT (LAMP)

LYNAS Advanced Material Plant 25 KMs North East of Kuantan • • • 600,

LYNAS Advanced Material Plant 25 KMs North East of Kuantan • • • 600, 000 Population Beautiful Beaches, Tourist Town One of the biggest Fishing port Seafood Industry Monsoon season and high rainfall Nov-Jan

Lynas Malaysia Sdn Bhd 100% Milik Australia

Lynas Malaysia Sdn Bhd 100% Milik Australia

LAMP • Di JADUAL KAN SIAP SEPT 2011 • MENERIMA LESEN UNTUK MEMBINA 2008

LAMP • Di JADUAL KAN SIAP SEPT 2011 • MENERIMA LESEN UNTUK MEMBINA 2008

 • LAMP built over 100 hectare of land – With no inner buffer

• LAMP built over 100 hectare of land – With no inner buffer zone.

Lynas’s Mount Weld mine

Lynas’s Mount Weld mine

LYNAS Corporation • Satu Syarikat milik Australia • Di kecualikan dari membayar cukai selama

LYNAS Corporation • Satu Syarikat milik Australia • Di kecualikan dari membayar cukai selama 12 tahun – status “Strategik Pioneer Status” oleh MITI • Logi Lynas di Gebeng ini hanya akan mengambil 350 pekerja

Lynas Malaysia Sdn Bhd • Di miliki sebenuhnya oleh Lynas Corp (Tiada shareholder tempatan)

Lynas Malaysia Sdn Bhd • Di miliki sebenuhnya oleh Lynas Corp (Tiada shareholder tempatan) • Authorised Capital RM 500, 000 • Issued Capital RM 250, 000 (semuanya di bayar oleh Lynas Corp) • Director Lynas Malaysia Sdn Bhd merupakan Nominee Director

LAMP – Lynas Advanced Material Plant • Apabila Logi Lynas (LAMP) beroperasi sepenuhnya akan

LAMP – Lynas Advanced Material Plant • Apabila Logi Lynas (LAMP) beroperasi sepenuhnya akan mengeluarkan tanah nadir bernilai jumlah Export sebanyak RM 8 bil setahun • Lynas Corp akan menguasai 30% pasaran dunia • LAMP akan menjadi logi pemrosesan Tanah Nadir yang terbesar didunia

Deportment of Radioactivity (Rujukan - Kertas Cadangan Lynas kpd Kerajaan Negri Trengganu) The Mt

Deportment of Radioactivity (Rujukan - Kertas Cadangan Lynas kpd Kerajaan Negri Trengganu) The Mt Weld Rare Earths ore contains a naturally low level of radioactive thorium, which is concentrated with the Rare Earths in the flotation process. The ore typically contains 23 ppm U 3 O 8 and 750 ppm Th. O 2 which equates to a total radioactivity of 31 Bq/g for the two decay chains. The concentrate typically contains 29 ppm U 3 O 8 and 1600 ppm Th. O 2 which equates to a total radioactivity of 61 Bq/g for the two decay chain

PIAWAIAN NEGERI CINA (Rujukan - Kertas Cadangan Lynas kpd Kerajaan Negri Trengganu) • For

PIAWAIAN NEGERI CINA (Rujukan - Kertas Cadangan Lynas kpd Kerajaan Negri Trengganu) • For Chinese industry the classification of radioactive wastes is defined in the Chinese Standard GB 9133 -S 3, which specifies that a solid waste with a specific activity of less than 74 Bq/g is classified as non radioactive solid waste and can therefore be stored in a standard waste solids facility with impermeable lining

Lynas Malaysia Sdn Bhd Hon Norman Moore- Menteri WA • Insists that their Mt

Lynas Malaysia Sdn Bhd Hon Norman Moore- Menteri WA • Insists that their Mt Weld ore is lathanide contrary to various other reports which states that Mt Weld ore are monazites in nature • Proposes to bring the Rare Earth concentrate into Malaysia NOT as radioactive material. • Declares that the residues (tailings) from processing in LAMP are not radioactive and not hazardous in nature. Thus can be disposed as municipal waste • Western Australian Minister has asserted in WA Parliament that the radioactive waste belongs to Malaysia and will not be accepted back into Australia

Menurut kertas kajian yang di keluarkan oleh Parlimen Australia No: 11 2007 -08 Sumber

Menurut kertas kajian yang di keluarkan oleh Parlimen Australia No: 11 2007 -08 Sumber utama Thorium di Australia ialah mineral Monazite yang merupakan tanah nadir kemerahan / coklat mineral phosphate yang mengandungi 8 - 10 % Thorium. Berdasarkan sasaran, LYNAS akan memproses 22, 000 -32, 000 (fully operational) metric tanah nadir setahun

Lynas Corp • Lynas mengambil alih Ashton Rare Earth Ltd dan mendapat lesen melombong

Lynas Corp • Lynas mengambil alih Ashton Rare Earth Ltd dan mendapat lesen melombong di Mt Weld (1992) • Ashton telah mendapat kelulusan membina logi pemprosesan di Australian di bawah kawal seliaan EPA Australia dan mempunyai ‘Waste Management Plans’ untuk Concentration Plant di Mt Weld dan ‘Secondary Processing Plant’ di Meenaar dimana melibatkan menghantar balik sisa buangan radioaktif ke Mt Weld • Ashton menegaskan bahawa bahan rare earth ore dan sisa buangan haruslah di kendali sebagai hazardous material dan oleh itu telah pun berikan proposal yang menyeluruh berkenaan pengendalian, melibatkan pengangkutan sehinggalah pengendalian sisa buangan radioaktif

Radioactive Composition of Rare Earth Ore • Mt Pass Ore Mt Weld Ore Bastnaesite

Radioactive Composition of Rare Earth Ore • Mt Pass Ore Mt Weld Ore Bastnaesite • Uranium 0. 002 % • Thorium 0. 02 % Monazite • Uranium 0. 0028 % • Thorium 0. 075 % Mt Weld Concentrate • Uranium 0. 0029 % • Thorium 0. 16 %

Proposed Processing and Waste Management Plans Molycorp Minerals - Refinery Due to operate 2012

Proposed Processing and Waste Management Plans Molycorp Minerals - Refinery Due to operate 2012 -2024 • The plant operation is expected to run on an environmentally advanced standard due to extensive public approval procedure (EU Parliament Paper) Lynas – LAMP due to operate Sept 2011 • No Concrete Waste Management Plans yet • Menggunakan Piawaian Negeri Cina • No Public Consultation prior to construction • EIA –full report is not made available to the public

‘Public Consultation’ oleh PKNP • Lulus lesen untuk membina 2008 • 18 Nov 2008

‘Public Consultation’ oleh PKNP • Lulus lesen untuk membina 2008 • 18 Nov 2008 di bawa ke Palimen buat pertama kali • AELB datang ke Kuantan 2009 • Tidak melibatkan rakyat. –hanya memanggil Ketua-Ketua Jabatan dan MP serta ADUN • 8 sesi penerangan yang di anjurkan PKNP bulan April 2011 di hentikan selepas 2 sesi. 5 April 2011

Status LAMP • Belum menerima Lesen Operasi / Lesen Operasi Sementara dari AELB •

Status LAMP • Belum menerima Lesen Operasi / Lesen Operasi Sementara dari AELB • Panel Pakar akan diberi masa 1 bulan untuk memberi maklumbalas. Laporan panel IAEA di jangka siap pada 30 June 2011

CONCERNS – APA YANG MEMBIMBANGKAN • Malaysia tiada undang-undang ketat di dalam memelihara Alam

CONCERNS – APA YANG MEMBIMBANGKAN • Malaysia tiada undang-undang ketat di dalam memelihara Alam Sekitar • Kerajaan Malaysia tidak menjadikan Public Consultation sebagai satu prosedur wajib didalam proses membuat keputusan. • Malaysia tiada ‘Freedom of Information Act’ • Sehingga kini Laporan EIA yang lengkap keatas Lynas tidak boleh didapat oleh orang awam • Banyak isu berkenaan penguatkuasaan undang • Rasuah

Thank You STOP LYNAS!!! PROTECT KUANTAN By Concerned Citizens of Kuantan