Sustainment Directorate Energy Summit 2019 IMCOM Sustainment Directorate
- Slides: 10
Sustainment Directorate Energy Summit 2019 IMCOM Sustainment Directorate Mr. Karim Manji Energy Update Slide 1 of 10
Sustainment Directorate Energy Summit 2019 Who Are We?
Sustainment Directorate Energy Summit 2019 Subordinate Garrisons IMCOM Sustainment AMC SC Installations MDW SC Installations MEDCOM SC Installations - Adelphi - Ft. AP Hill - Ft. Detrick - APG - Ft. Belvoir - Detroit - Ft. Meade - Natick - JB Myer-Henderson Hall - Picatinny* - Redstone - Rock Island - Anniston AD** ATEC SC Installations - Bluegrass AD** SOUTHCOM SC Installations ARNORTH SC Installations - Dugway - Letterkenny AD** - Miami - ASA Ft. Sam Houston - Yuma - Mc. Alester AAP** - Soto Cano - Pine Bluff Arsenal** - Pueblo CD** - Red River AD** - Sierra AD** - Tobyhanna AD** - Tooele AD** 17 Direct Report Installations + 11 AMC Special Installations (MWR only) - Watervliet** * SC is subordinate to ASA(ALT) ** AMC Installation – ID-S over MWR only
Energy Summit 2019 Sustainment Directorate IMCOM Sustainment Task Organized Organizational Structure Director XO CSM Deputy COS SJA EA IST HR PW Ops/Plans Installations: - APG - Meade - Adelphi - Natick - AP Hill - Picatinny - Belvoir - Redstone - Detroit - Rock Island - Detrick - Sam Houston - Dugway PG - Yuma PG - JB Myer HH - Soto Cano AB RM MWR As of 20 Feb 2019
Sustainment Directorate Energy Summit 2019 Energy/Water • FY 19 Energy OPORD: IMCOM HQ G 4 is working (ET: March with data due April). Main change from last year: Inventory all facility emergency back-up power generators. • FY 20 Projects Submission: 1. EWCR – emphasize resiliency component of project 2. Projects with payback < 10 years are now being considered viable 3. Highly recommend building retuning/recommissioning projects. High payback demonstrated at RSA. • IEWPs: 1. FY 19: Belvoir/Detrick/Meade/Redstone (kicked-off). Miami upcoming. 2. FY 20: APG (will roll-up Adelphi with APG) 3. FY 21: Adelphi / AP Hill /Detroit / Dugway /JBMHH / Natick / Picatinny / RIA / Natick • ID S Initiatives: 1. REM Acquisition 2. ESPC/UESC Buydowns, 3. Metering IDS goal at 85% Goal vs 65% for IMCOM 4. Building Automation Systems (BAS) 5. Demand Reduction (DR) 6. Mock Billing (for reimbursable customers – aid in paradigm shift to conserve) 7. Energy Policy Slide 5 of 10
Energy Summit 2019 Sustainment Directorate Energy/Utilities Approach 1 – Situation 3 – Sustainability Initiatives • Under a 10% Cost Redux Mandate for Energy/Utilities • Building Automation Systems • Installations have briefed Achievable Reductions • Metering (Success Story: Meade – mock billing for nonreimbursible Army Customers) • Energy Policies from top-down (assist in paradigm shift) • Demand Redux Participation • Continuous Commissioning (success story: RSA) 4 – Challenges / Resources Needed 2 – Resilience/Security Initiatives • APG (Edgewood Site) CHP – 7. 9 MW (~50% redux in consumption) • Detroit Arsenal – programming CHP 4 MW • Taking a holistic approach with Installation Energy/Water Plan (IEWP). Building resiliency/security/conservation requirements into the IEWP • Slide 6 of 10 Following AMC approach on Resilience (load level up to transmission) • Funding for initiatives (pursuing ESPCs/UESCs/EWCR/QUTM) • Resources (TDA cut-backs) • Need organization behavioral changes; with tangible enforcements • Need variance to allow charge-backs for above common level of services for Army Customers • Funding for Resource Efficiency Managers (REMs) • Requirement for additional upgrades to BAS; ability to off set
Sustainment Directorate Energy Summit 2019 IDS Energy/Utilities Success Stories APG Edgewood Area CHP Slide 7 of 10
Sustainment Directorate Energy Summit 2019 Energy/Utilities Success Stories Redstone Arsenal Bldg. Resilience and Renewable Slide 8 of 10
Sustainment Directorate Energy Summit 2019 Energy/Utilities Success Stories Redstone Arsenal Bldg. Retuning (Bldg. 4400) (Validated EUI savings) Slide 9 of 10
Sustainment Directorate Energy Summit 2019 Questions? Slide 10 of 10