Subsea Drilling Oil Gas Drilling Technology Derrick Drilling
Subsea Drilling Oil & Gas Drilling Technology
Derrick Drilling Floor Housing oil
Conductor 30” (or 36”) (Jet Cleaning
Casing 30” Elevator Kelly Bushing
Wedges
Drill Bit
Drill Pipe
Lowering Conductor Pipe 30”, oil
Drill Pipes Column oil
Jet Cleaning oil
Jet Cleaning oil
Collar Shoe 30” End of Jet Cleaning oil
Drilling Fase 16” and lowering casing of 13 3/8” (Slender)
Collar Shoe 30” Drilling Fase 16” oil
Gravel End of Fase 16” oil
Circulating for well cleaning oil
Circulating for well cleaning oil
Collar Shoe 30” Well cleaned oil
Collar Shoe 30” Taking column back for lowering casing of 13 3/8” oil
Taking column back for lowering casing of 13 3/8 oil
Preparing for lowering casing of 13 3/8” oil
Lowering casing of 13 3/8” oil
Lowering casing of 13 3/8 oil
Lowering casing of 13 3/8 oil
Lowering casing of 13 3/8 oil
Lowering casing of 13 3/8 oil
Lowering casing of 13 3/8 oil
Final lowering of casing 13 3/8” Collar Shoe 13 3/8” oil
Circulating for cementation of casing of 13 3/8” Collar Shoe 13 3/8” oil
Cement return on seabed Cementing casing of 13 3/8” oil
Taking the setting tool back of 13 3/8” oil
Lowering the BOP (Blowout Preventer) oil
Lowering the BOP (Blowout Preventer) oil
Riser BOP oil
Drilling Fase 12 1/4” and lowering casing of 9 5/8”
Starting drilling fase of 12 1/4” oil
Drilling fase of 12 1/4” oil
Drilling fase of 12 1/4” oil
Drilling fase of 12 1/4” oil
oil Final fase of 12 1/4”
oil Circulating for well cleaning
oil Circulating for well cleaning
Well cleaned oil
Taking column back for well logging oil
Taking column back for well logging oil
Well prepared for logging oil
Logging well of 12 1/4” oil
Logging complete and preparing for lowering casing of 9 5/8” oil
Lowering casing of 9 5/8” Riser, BOP, Casing of 13 3/8” oil
Lowering casing of 9 5/8” in open well oil
Lowering casing of 9 5/8” in open well oil
Collar Shoe 9 5/8” Final lowering of casing 9 5/8” oil
Collar Shoe 9 5/8” Circulating for cementation of casing of 9 5/8” oil
Complete cementation of casing 9 5/8” Collar Shoe 9 5/8” oil
Visualizing cementation of casing 9 5/8”
Cementation Head Mud pump Mud tank Riser Wellhead Collar Shoe 30” Packer Collar Shoe 13 3/8” oil Floating collar Collar Shoe 9 5/8”
Cementation Head Mud pump Mud tank Riser Wellhead Collar Shoe 30” Packer Collar Shoe 13 3/8” oil Floating collar Collar Shoe 9 5/8”
Cementation Head Mud pump Mud tank Riser Wellhead Collar Shoe 30” Packer Collar Shoe 13 3/8” oil Floating Collar Shoe 9 5/8”
Cementation Head Mud pump Mud tank Riser Wellhead Collar Shoe 30” Packer Collar Shoe 13 3/8” oil Floating collar Collar Shoe 9 5/8”
Cementation Head Mud pump Mud tank Riser Wellhead Packer oil Floating collar Collar Shoe 9 5/8”
Cementation Head Mud pump Mud tank Riser Wellhead Packer oil Floating collar Collar Shoe 9 5/8”
Cementation Head Cementation Unit Riser Wellhead Packer oil
Cementation Head Cementation Unit Riser Wellhead Packer oil
Cementation Head Cementation Unit Riser Wellhead Packer oil
Cementation Head Cementation Unit Riser Wellhead Packer oil
Cementation Head Cementation Unit Riser Wellhead Packer oil
Cementation Head Mud pump Dart Mud tank Riser Wellhead Packer oil
Cementation Head Mud pump Dart Mud tank Riser Wellhead Packer oil
Cementation Head Mud pump Mud tank Riser Dart Wellhead Packer oil
Cementation Head Mud pump Mud tank Riser Wellhead Dart Packer oil
Cementation Head Mud pump Mud tank Riser Wellhead oil Dart Packer
Cementation Head Mud pump Mud tank Riser Wellhead oil Dart Packer
Mud pump Mud tank Riser Wellhead oil Dart Packer