Stewart Hall Renovation This project involves the complete

  • Slides: 4
Download presentation
Stewart Hall Renovation This project involves the complete renovation of an original 1893 structure

Stewart Hall Renovation This project involves the complete renovation of an original 1893 structure to bring it up to current occupancy codes to establish a University Alumni and Welcome Center. Project work commenced in November 2018 and is anticipated to be completed by end of October 2019.

17 OCT 17 27 OCT 17 Original banked running track on 2 d floor

17 OCT 17 27 OCT 17 Original banked running track on 2 d floor of gymnasium area Original rear of building with fire escape to be removed when new construction meets current fire code 20 DEC 18 9 JAN 19 Rear of Stewart Hall after fire escape removed Demolition of basement using excavation equipment 27 NOV 18 Initial demo Old Main side of Stewart Hall 4 DEC 18 Demo of 2 d floor with all room partitions (and ceiling) removed 9 JAN 19 Demolition of gym area with all walls and running track removed. Of note is the wall covering in plaster that will be removed to original brickface 17 JAN 19 Continued demo Old Main side of structure. Walers are used on the exterior for structural stability

13 FEB 19 Wall plaster removal down to original brickface 7 MAR 19 Installation

13 FEB 19 Wall plaster removal down to original brickface 7 MAR 19 Installation of steel beams for new running track 4 APR 19 Unique view of all three levels of the building showing the installation of the new load rated first floor 15 MAR 19 Initial foundation excavation for addition 6 JUN 19 30 APR 19 Installation of new load rated first floor from basement Interior view of the addition after topping out 26 MAR 19 Original gym floor being removed to attain required load bearing capacity 10 JUN 19 Concrete pour of second floor track using pump truck

25 JUN 19 Building exterior with new windows 25 JUN 19 Framing of basement

25 JUN 19 Building exterior with new windows 25 JUN 19 Framing of basement Mens Room 27 JUN 19 Second floor track after first concrete pour 3 JUL 19 Basement framing and insulation