STEREO Mission Nick Chrissotimos NASA GSFC STEREO Project

  • Slides: 14
Download presentation
STEREO Mission Nick Chrissotimos NASA GSFC STEREO Project Manager SWG May 2, 2005

STEREO Mission Nick Chrissotimos NASA GSFC STEREO Project Manager SWG May 2, 2005

Mission Description Mission Objectives: 2 -year mission to measure the causes and mechanisms of

Mission Description Mission Objectives: 2 -year mission to measure the causes and mechanisms of CME initiation and characterization of their propagation through the heliosphere. 1 -year extended data analysis. Organizations: NASA GSFC, JHU/APL, Naval Research Laboratory, University of California at Berkeley, University of New Hampshire, University of Minnesota, Observatoire de Paris. Mission Description: Two functionally identical spacecraft in heliocentric orbits at 1 AU (22°/yr drift from Earth orbit leading/lagging configuration). Each Observatory: Volume: Dry Mass: Power: 1. 2 w x 2. 0 l x 1. 5 h meters A: 535 kg B: 561 kg 509 W (EOL) Launch: To be launched from KSC on a Delta 2925 -10 L. Website: http: //stereo. gsfc. nasa. gov SWG May 2, 2005 2

Observatory Configuration SWG May 2, 2005 3

Observatory Configuration SWG May 2, 2005 3

Observatories Stacked in the Launch Vehicle Fairing Ahead (“A”) Observatory Behind (“B”) Observatory Delta

Observatories Stacked in the Launch Vehicle Fairing Ahead (“A”) Observatory Behind (“B”) Observatory Delta II 3 Stage SWG May 2, 2005 4

Launch Vehicle SWG May 2, 2005 5

Launch Vehicle SWG May 2, 2005 5

Launch Timeline SWG May 2, 2005 6

Launch Timeline SWG May 2, 2005 6

Coverage Maps March 2006 February 2006 April 2006 SWG May 2, 2005 7

Coverage Maps March 2006 February 2006 April 2006 SWG May 2, 2005 7

SWG May 2, 2005 8

SWG May 2, 2005 8

SWG May 2, 2005 9

SWG May 2, 2005 9

Separation and Solar Array Deployments SWG May 2, 2005 10

Separation and Solar Array Deployments SWG May 2, 2005 10

Spacecraft B and A SWG May 2, 2005 11

Spacecraft B and A SWG May 2, 2005 11

Spacecraft A SWG May 2, 2005 12

Spacecraft A SWG May 2, 2005 12

IMPACT IDPU Mechanically Integrated SWG May 2, 2005 13

IMPACT IDPU Mechanically Integrated SWG May 2, 2005 13

IMPACT Boom SWG May 2, 2005 14

IMPACT Boom SWG May 2, 2005 14