Status of the ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS AFP group

Status of the ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS AFP group 25 FEB 2016 1

AFP Phase-1: AFP 0+2 2 horizontal Roman Pot Stations at 205 and 217 m

AFP Phase-1: AFP 0+2 2 horizontal Roman Pot Stations at 205 and 217 m in A 6 R 1 – very much similar to the CMS-PPS – TOTEM horizontal stations – installed since 18 Jan; under vacuum and baked-out since 3 Feb. Detectors installed yesterday & today… – BPM and BLMs installed and cabled – Motor motion calibrated, limit switches (HOME, IN, OUT) set, LVDT calibrated on 18 Feb. – Interlock logic (copy of ALFA logic) installed and ready for validation tests & commissioning … 25 FEB 2016 TREX Mtg 2

AFP in 2015 • TDR approved by ATLAS and LHCC – 19 Jun 2015,

AFP in 2015 • TDR approved by ATLAS and LHCC – 19 Jun 2015, • AFP 0+2 ECR approved by the LHC – 2 Oct 2015 • Roman Pot Stations: (Vakuum Praha) – Prototype (20. 10. 2016) – 2 Production stations (04. 12. 2015) – NEG coating start (05. 12. 2015) • Roman Pots: – Prototype (Sep): Leak & pressure tested – 2 Production Pots on 20 Oct, 12 Dec • Station assembly: Beam View: Horizontal pot with 0. 3 mm thick windows – equipped with Pots and Motorization (12. 2015) • Vacuum validation (TE-VSC): – Leak testing, baking, outgassing analysis start on 14. 12. 2015 • Cabling: – Opening of Survey galleries for fast cable pulling 15. 12. 2015 – All cables prepared … 25 FEB 2016 TREX Mtg 3

AFP in 2016 – RP Installation • Two stations validated on 13 Jan •

AFP in 2016 – RP Installation • Two stations validated on 13 Jan • Cabling: (TE-VSC) Patch Panels & LV Regulators (Milano) at 211 m – Fast Cabling finished on (SPIE) – C-side cables finished (ATLAS-TC); A-side cabling cont. inuing until 26 Feb – All C-side cables connectorized and tested (PH-DT, AFP) • Services: – Compressed air for Cooling – Secondary Vacuum (PH-DT) – BPM, BLMs connected • Fiducialization & Installation • • on 18 Jan connected to Beam Pipe, pumped and baked-out Pot Motion calibrated in tunnel: 25 FEB 2016 – Survey of slide vs motor position, – vs switches and LVDT. 20 Feb TREX Mtg station at 217 m, BPM, BLM, TCL 6 4

AFP in 2016 - Detectors 11 Silicon 3 D detector assemblies produced at IFAE

AFP in 2016 - Detectors 11 Silicon 3 D detector assemblies produced at IFAE (more in coming months) – 7 assemblies are operational – Assemblies precision-mounted on Al-CF carrier cards – FLEX cooling – Heat Exchanger holds Tiltbars exhaust – – 40 C air from Air. Cooler • Installation: this week – leak testing Mo-Tu signal feedthrough trial assembly with 2 bad assemblies (20. 02. 2016) heat exchanger 25 FEB 2016 TREX Mtg 5

AFP in 2016: TDAQ • Local Trigger Board: – Uses Hit. Bus chip and

AFP in 2016: TDAQ • Local Trigger Board: – Uses Hit. Bus chip and the Hit. OR from FE-I 4. – NIM trigger signal to CTP in less than 80 BX • Data Acquisition using Optoboard and fibers to RCE-HSIO system in USA 15 • System pre-tested in standalone mode: from tunnel USA 15 local trigger board HV (To. F) Feed through flange Vortex Cooler 25 FEB 2016 TREX Mtg 6

AFP in 2016: DCS • LV and HV purchased and connected to DCS •

AFP in 2016: DCS • LV and HV purchased and connected to DCS • capacity for 45 NTC’s per arm, sec. vac. , radiation dose … P N N Movement P N P Outside Flange Stepper Motor N N Local Trigger Board N P Outside Flange N N Stepper Motor N P 0 P 1 P 2 P 3 N N N To. F PMT NTC Distribution Panel Opto Board N N Tunnel floor 25 FEB 2016 E. Banaś 16/2/2016 N ACS N N VREG Crate N N TREX Mtg N NTC CFD Card N N N Local Trigger Board N N N To. F Preamp Card N ACS On. Wall N N P N N N PT 1000 N Reference Clock N Si. T HPTDC Card Si. T HE HPTDC Card N P 0 P 1 P 2 P 3 On. Wall Far Station RPHC 1 Vacuum Trigger/amplifier HE Near Station CFD Card RPHC 0 7

Pot Motion & Controls • Document in preparation: “Specification and Validation of the Motion

Pot Motion & Controls • Document in preparation: “Specification and Validation of the Motion Control System of the ATLAS Forward Proton Roman Pots” • Range Switches and Stops we implemented mechanical stops to prevent damage to electrical STOP 25 FEB 2016 TREX Mtg 8

AFP RP Interlock Diagram 2016 MOTOR CONTROL RACK RP_HOME_B 1(1) Home Switch B 1(2)

AFP RP Interlock Diagram 2016 MOTOR CONTROL RACK RP_HOME_B 1(1) Home Switch B 1(2) Pos_B 1(2) LVDT_B 1(2) AND RP_HOME_B 1(2) Pos_B 1(1) LVDT_B 1(1) AFP RP Beam Interlock System (BIS) compare AND compare ALL_RP_HOME_B 1 INJECTION_PERMIT RP 1 (Beam 1) ALL_LVDT_OK_B 1 AND OR CIBU RP (double) FESA OR Pos_B 2(1) LVDT_B 2(2) Pos_B 2(2) Home Switch B 2(1) Home Switch B 2(2) compare AND compare RP_HOME_B 2(1) AND USER_PERMIT (Beam 2) ALL_LVDT_OK_B 2 ALL_RP_HOME_B 2 INJECTION_PERMIT RP 2 (Beam 2) all machine flags OR NOT_BACK_HOME all machine flags DCS STABLE_BEAMS AND Motor Control 25 FEB 2016 OVERRIDE MOV. DEVICE_ALLOWED INOR GMT (SMP) ATLAS Inj. Permit Beam 2 RP_HOME_B 2(2) x 4 ATLAS Slimos ATLAS Inj. Permit Beam 1 USER_PERMIT (Beam 1) Limits LVDT_B 2(1) Rack USA 15 Y. 25 -05. A 1 Luminosity and Forward Physics WG – 9

AFP 2016 – Commissioning & Data • Ultimate Goal: • Commissioning: • • ATLAS

AFP 2016 – Commissioning & Data • Ultimate Goal: • Commissioning: • • ATLAS Forward Proton detectors: Measure forward protons with AFP horizontal Roman pot detectors for the study of soft and hard diffractive processes with ATLAS. • Commissioning of Interlocks and Roman pot insertion during no-beam periods. • • Parasitic stand-alone running (in garage position) for detector commissioning (NO pot insertion). Time period: March – April 2016 – – Motorization control & Interlock documentation in progress Contact with MPP – next presentation next week Data Taking – After commissioning: • • Participate parasitically in low-μ special runs; stand-alone data taking with tentative insertion up to 20 σ. Time period: May – June 2016 • • Participate parasitically in a few end-of-store runs (standard optics); stand-alone data taking with tentative insertion up to 20 σ. Time period: before September 2016 • • Participate in a number of standard runs with ATLAS+AFP TDAQ with tentative insertion up to 20 σ. Time period: Before mid-November 2016 – After LHC and ATLAS approvals: – After ATLAS Review and Approvals: 25 FEB 2016 TREX Mtg 10

Back-up Slides 25 FEB 2016 TREX Mtg 11

Back-up Slides 25 FEB 2016 TREX Mtg 11

AFP in 2015 – TDR, TS, ECR, PO … • AFP Internally and externally

AFP in 2015 – TDR, TS, ECR, PO … • AFP Internally and externally approved for special runs • TDR, TS, ECR, POs, … 25 FEB 2016 TREX Mtg 12