STATE ROAD 5456 PROJECT CONCEPT DEVELOPMENT STUDY US
- Slides: 16
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
Pasco’s Northern Loop – Managed Lanes 1. Managed Lanes an Emerging Regional Strategy 2. RSH Study- Alternative 6 Set the Stage for the Concept 3. General Support, but we must. Establish Revenue Potential 4. Will Weatherford wants us to“Go On Transportation Offensive” 5. Secretary Prasad wants us to“THINK BIG” 6. FDOT wants to accelerate PPP private funding projects 7. CCC Regional Priority List made project. No. 5 in the TOP TEN 8. Economic Development. Interests want road and transit capacity 9. Pasco Joins Tampa Bay Economic “Big League” STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
SR 54/56 PASCO Corridor Concept Elevated Managed Lanes (Alternative-6 , RSH/ DOT Study) BUILDABLE Median located and built with staged MOT with day and night schedule FUNCTIONAL This elegant Segmented Precast allows 4 elevated toll lanes to flow over the 6 “free” at grade Lanes STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD BRT READY Market Driven Transit. Balances ADT
Location Map – “EXPANDED East 56” STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
Tour New “Smart” PASCO & 54/56 Corridor STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
Tour, Talk, and Economic Focus STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
October 30, I Learned –I’m too S L O W ! STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
Sunday November 4 th Tampa Bay Times STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
Action Time IS NOW– Key Issues! • LRTP & TBARTA Master Plan Proposes Managed Lanes • Action Needed ( Capacity &Transit-Not 25 years out ) • Major Intersections / Segments Failing • PPP Opportunity Real and stressed by FDOT (Prasad) • Pasco 54/56 Developers Need ROW Requirements (Starkey, Smith 54, Wiregrass, Mitchell/Western Hub and Others) • Construction Prices Lowest and Will Rise • Interest Rates Low Point in History and Will Rise STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
Stakeholder Involvement “Expansion” Pasco County MPO & BCC OW H S ME DOT D 7 Y! E ON& M E TH FDOT O SH ! W ME Y E TH M E OW O SH ! TBARTA E ON W ME H T E EY N MO M Pasco SH Administration EY N O M Capital Project E TH Investment Team Public and Private Partnerships Pasco Planning/GM Every Player Needs a Quality Toll Revenue Planning Number! STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD !
SR 54/SR 56 TRANSIT/MANAGED LANE AND TOLL STUDY Study Objectives Assess the ROW needs associated with the elevated and/or at-grade managed lane concept along the SR 54/56 corridor (US 19 to US 301) Perform planning-level build toll demand traffic estimates, assess optimal toll rates, revenue estimates, O&M costs, etc. STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
ALTERNATIVE SIX Develop Toll and Transit Alt 6: Express Bus/Managed Lanes – 4 Lanes Elevated STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
Managed Lanes Alternatives AADT 4 Managed Lanes Grade-Separated (Alternative 6) $0. 14/mile $0. 21/mile STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
Managed Lanes Gross Rev. Back of Envelope! Rate . 14 c /Mile Segment Little-SC SC- 41 41 -I 75 I-75 -BBD . 14 /mile REV/Day 300 Day . v e R 7. 75 63500 492125 $ 68, 897. 50 $ 20, 669, 250. 00 5 72300 361500 $ 50, 610. 00 $ 15, 183, 000. 00 3. 25 86000 2 54400 0 0 , 0 . 21/mile l a u n n A 108800 $ 15, 232. 00 $ 4, 569, 600. 00 1241925 $ 173, 869. 50 $ 52, 160, 850. 00 Trip Miles REV/Day 300 Day Segment 7. 75 39600 306900 64449 $19, 334, 700. 00 Little-SC 5 45700 228500 47985 $14, 395, 500. 00 SC- 41 3. 25 67900 220675 46341. 75 $13, 902, 525. 00 41 -I 75 2 27000 54000 11340 $ 3, 402, 000. 00 I-75 -BBD 810075 170115. 75 $51, 034, 725. 00 STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD 0 5 $ . t s E 279500 $ 39, 130. 00 $ 11, 739, 000. 00 0 0 , 0 Rate . 21 c /Mile Trip Miles RSH Study ADT projected for 2035 Study Date
Preliminary Schedule Travel Demand Modeling 2 Months Toll Revenue 2 Months Cost Estimates/Staging Plan 2 Months Drainage/ROW Preservation 2 Months Public Outreach Throughout Study Total Schedule: 8 Months STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
CURRENT STATUS –Right of Way Lease • 3 Phase Unsolicited Bid • DOT Received June 2013 • Open 60 Day Response • Oct 23 rd Due Date • November Award Announcement STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD
- What is paved and unpaved road
- Road to revolution study guide answer key
- Rsrtc rfid system. co. in
- Ksrtc online leave management
- A road map indicating the direction of systems development
- Thesis statement example
- Thesis statement road map
- Thesis statement
- Thesis development and road map
- Thesis statement road map
- Singrauli airport corporation limited
- Akkalkot to kurnool bharatmala project
- Differentiate actual self from ideal self
- Perbedaan selling concept dan marketing concept
- Concept map of states of matter
- Concept development definition
- Fnew moon