STATE LOAD DESPATCH CENTRE IMPLICATION OF NEW UI REGIME AS PER CERC REGULATION NOTIFIED ON 30. 03. 2009 APPLICABLE FROM 01. 04. 2009.
IMPLICATION OF NEW UI REGIME AS PER CERC REGULATION DATED 30. 03. 2009 APPLICABLE FROM 01. 04. 2009. SN. Prior to 31. 03. 2009 After 31. 03. 2009 1 Frequency range for unscheduled inter change charge for frequency range below 50. 5 Hz. to 49. 0 Hz. The rate of UI below 50. 5 Hz. and upto 49. 80 Hz. linear in 0. 02 Hz. step at 8 Ps/Unit for each step. Below 49. 8 Hz, linear in 0. 02 Hz. step in 18 Ps per unit. The maximum UI rate is Rs. 10/Unit. Frequency range for unscheduled inter change charge for frequency range below 50. 3 Hz. to 49. 2 Hz. The rate of UI below 50. 3 and upto 49. 5 Hz. linear in 0. 02 Hz. step at 12 Ps/Unit for each step. Below 49. 5 Hz and upto 49. 2 Hz. linear in 0. 02 Hz step in 17 Ps per unit 2. UI Cap for generators For coal, lignite and APM gas fired generations, the cap is 406 Ps/Unit for over generation. UI Cap for generators For coal, lignite and APM gas fired generations, the cap is 408 s/Unit for over generation or under generation in the frequency range between 50. 3 Hz and upto 49. 2 Hz.
IMPLICATION OF NEW REGIME AS PER CERC REGULATION ON UI SETTLEMENT MECHANISM ISSUED ON 30. 03. 2009 APPLICABLE FROM 01. 04. 2009. S N. Prior to 31. 03. 2009 After 31. 03. 2009 3. UI Cap for states NIL OD shall not exceed 12%age of its scheduled drawal or 150 MW wherever is lower when frequency is below 49. 5 Hz and 3% on daily aggregate basis. Under generation of electricity from a generating station shall not exceed 12% of the scheduled injection when a frequency is below 49. 5 Hz and 3% on daily aggregate basis. 4 Penalty for deviation For generators : In case of over generation, the same is restricted 105% of DC in a time block and 101% during the day is eligible for UI and capped at 406 Ps/Unit For states: Same rates of UI are applicable for OD / UD For generators : for over generations, the cap is 408 Ps/ Unit for over generation or under generation in the freq range between 50. 3 Hz and upto 49. 2 Hz. For under generations, when freq. is below 49. 2 Hz, the generating stations using coal, lignite or gas supplied under APM as fuel, additional unscheduled inter change charge equivalent to 40% of UI cap rate i. e. 571. 20 Ps/Unit. For States: For over drawal during frequency below 49. 2 Hz, additional unscheduled inter change charge at the rate equivalent to 40% of the UI rate corresponding to frequency of 49. 2 Hz. i. e. 1029 Ps/Unit.
IMPLICATION OF NEW REGIME AS PER CERC REGULATION ON UI SETTLEMENT MECHANISM ISSUED ON 30. 03. 2009 APPLICABLE FROM 01. 04. 2009. S. 5 Prior to N 31. 03. 2009. Reporting of Deviation from schedule : NIL After 31. 03. 2009 RLDC shall prepare and publish on its website the records, on monthly basis of UI accounts specifying the quantum of over drawal / under generation and corresponding amount of UI paid / received for each beneficiaries or generating station for time blocks when the frequency was below 49. 2 Hz and between 49. 5 – 49. 2 Hz separately.
IMPLICATION OF NEW REGIME AS PER CERC REGULATION ON UI SETTLEMENT MECHANISM ISSUED ON 30. 03. 2009 APPLICABLE FROM 01. 04. 2009. S. 5 Prior to N 31. 03. 2009. Reporting of Deviation from schedule : NIL After 31. 03. 2009 RLDC shall prepare and publish on its website the records, on monthly basis of UI accounts specifying the quantum of over drawal / under generation and corresponding amount of UI paid / received for each beneficiaries or generating station for time blocks when the frequency was below 49. 2 Hz and between 49. 5 – 49. 2 Hz separately.
UI Account as per new CERC Regulation dated 30. 03. 09 (for the week 47/FY 0809) All FIGURES IN Rs LACS Sr No. INTRASTATE UTILITY RECEIVING PAYING (1) (2) (3) (4) DIFFERENCE OF INTER STATE UI & INTRASTATE UI ADJUSTMENT AS PER THE DECISION TAKEN IN THE MEETING HELD IN SLDC ON 04. 07 & 10. 04. 08 (5) ADJUSTED U. I. AMOUNT UI Amount with capping of Coal based generators Diff_UI Amount or Pool balance due to Capping Additiona l UI amount (6) (7) (8)=(7)(6) (9) NET UI Amount (10)=(9)+(7) for Th Gen station & (9)+(6) for others 1 I. P. STN 0. 00000 4. 48651 -0. 05531 4. 43120 2. 83652 -1. 59467 0. 29668 3. 13321 2 RPH 0. 00000 0. 50689 -19. 76073 -19. 25384 -20. 55811 -1. 30427 0. 23173 -20. 32638 3 G. T. STN. 7. 45012 0. 00000 1. 76994 -5. 68018 1. 10004 -4. 58015 IPGCL 7. 45012 4. 99340 -18. 04610 -20. 50282 4 PRAGATI 28. 92797 0. 00000 -0. 84073 -29. 76870 5 BTPS 77. 95533 0. 00000 -2. 09058 -80. 04591 6 BYPL 390. 34290 0. 00000 -21. 09753 7 BRPL 0. 00000 98. 66108 8 NDPL 0. 00000 9 NDMC 10 -17. 72158 -2. 89894 1. 62845 -21. 77332 0. 36799 -29. 40071 0. 31128 -59. 04746 -411. 44042 6. 84912 -404. 59131 -3. 08084 95. 58024 23. 93787 119. 51811 242. 90314 -48. 87707 194. 02607 16. 35791 210. 38398 679. 80017 0. 00000 -34. 48776 -714. 28793 0. 67764 -713. 61029 MES 173. 65256 0. 00000 -6. 54346 -180. 19603 0. 00000 -180. 19603 TOTAL 1358. 12906 346. 55762 -135. 06407 -1146. 63550 50. 13025 -1078. 71703 -59. 35874 20. 68717 17. 78822
ABSTRCT OF UI AMOUNT (-) indicates recievable & (+) indicates payable All FIGURES IN Rs LACS Sr No. UTILITY RECEIVING PAYING Amount for Cuurent Week 1 I. P. STN 0. 00000 3. 13321 2 RPH 20. 32638 0. 00000 -20. 32638 3 G. T. STN. 4. 58015 0. 00000 -4. 58015 IPGCL 24. 90652 3. 13321 -21. 77332 4 PRAGATI 29. 40071 0. 00000 -29. 40071 5 BTPS 59. 04746 0. 00000 -59. 04746 6 BYPL 404. 59131 0. 00000 -404. 59131 7 BRPL 0. 00000 119. 51811 8 NDPL 0. 00000 210. 38398 9 NDMC 713. 61029 0. 00000 -713. 61029 10 MES 180. 19603 0. 00000 -180. 19603 11 Regional UI NRPC 0. 00000 1146. 63550 12 Pool balance of additional UI 50. 13025 0. 00000 -50. 13025 13 Pool balance of capping 17. 78822 0. 00000 -17. 78822 TOTAL 1479. 67079 0. 00000
UI FOR NDPL Dates Scheduled Drawal in Mus Actual Drawal in Mus UI Energy in Mus Admissible un adjusted UI amount in Rs. Lacs Adjusted UI amount in Rs Lacs Additional UI energy in Mus (Overdrawal below 49. 2 hz) Additional UI Charge in Lacs NET UI AMOUNT 16 14. 436272 14. 715696 0. 279424 -1. 93440 -2. 08663 0. 000000 0. 00000 -2. 08663 17 14. 728362 15. 271671 0. 543309 24. 06934 31. 91207 0. 043892 1. 29043 33. 20250 18 14. 806167 15. 143702 0. 337535 18. 70487 -4. 35349 0. 091315 2. 68465 -1. 66884 19 14. 619150 15. 311710 0. 692560 39. 43760 21. 37023 0. 029116 0. 85602 22. 22624 20 13. 798034 15. 306690 1. 508656 89. 48354 92. 78443 0. 158869 4. 67076 97. 45519 21 14. 139211 14. 515027 0. 375816 17. 72054 13. 96359 0. 053354 1. 56860 15. 53219 22 13. 394552 14. 321108 0. 926556 55. 42165 40. 43587 0. 179845 5. 28745 45. 72332 4. 663856 242. 90314 194. 02607 Total 99. 921749 104. 585605 0. 556391 16. 35791 210. 38398
UI FOR BRPL Dates Scheduled Drawal in Mus Actual Drawal in Mus UI Energy in Mus Admissible un adjusted UI amount in Rs. Lacs 16 20. 363430 19. 930210 -0. 433220 -2. 87814 17 19. 711029 19. 713834 0. 002805 18 20. 737519 20. 102294 19 20. 187058 20 Adjusted UI amount in Rs Lacs Additional UI energy in Mus (Overdrawal below 49. 2 hz) Additional UI Charge in Lacs NET UI AMOUNT -3. 10463 0. 005548 0. 16311 -2. 94152 24. 38234 32. 32706 0. 071559 2. 10383 34. 43089 -0. 635226 -6. 72302 -7. 43790 0. 117676 3. 45967 -3. 97823 19. 818130 -0. 368928 -5. 00688 -5. 43662 0. 036840 1. 08311 -4. 35352 18. 818719 19. 402314 0. 583594 40. 30373 41. 79046 0. 137475 4. 04175 45. 83222 21 19. 030273 19. 485170 0. 454898 34. 17821 26. 93204 0. 037719 1. 10894 28. 04098 22 18. 063827 18. 090293 0. 026466 14. 40484 10. 50984 0. 407396 11. 97745 22. 48728 Total 136. 911855 136. 542245 -0. 369610 98. 66108 95. 58024 0. 814213 23. 93787 119. 51811
UI FOR BYPL Dates Scheduled Drawal in Mus Actual Drawal in Mus UI Energy in Mus Admissible un adjusted UI amount in Rs. Lacs 16 13. 793345 11. 406992 -2. 386352 -113. 64509 17 12. 077924 11. 195310 -0. 882615 18 13. 133001 11. 786996 19 12. 773377 20 Adjusted UI amount in Rs Lacs Additional UI energy in Mus (Overdrawal below 49. 2 hz) Additional UI Charge in Lacs NET UI AMOUNT -122. 58837 0. 000000 0. 00000 -122. 58837 -47. 76829 -41. 04499 0. 000000 0. 00000 -41. 04499 -1. 346005 -65. 38624 -72. 33896 0. 000000 0. 00000 -72. 33896 11. 735454 -1. 037923 -52. 93906 -57. 48279 0. 006328 0. 18604 -57. 29675 11. 826485 11. 676766 -0. 149720 -6. 88711 -6. 60080 0. 053682 1. 57825 -5. 02255 21 12. 133597 11. 622033 -0. 511564 -35. 01408 -36. 97199 0. 047939 1. 40942 -35. 56257 22 12. 411636 11. 090471 -1. 321165 -68. 70303 -74. 41252 0. 125014 3. 67540 -70. 73712 Total 88. 149366 80. 514022 -7. 635344 -390. 34290 -411. 44042 0. 232963 6. 84912 -404. 59131
UI FOR NDMC Dates Scheduled Drawal in Mus Actual Drawal in Mus UI Energy in Mus Admissible un adjusted UI amount in Rs. Lacs 16 5. 025517 2. 566659 -2. 458858 -101. 86160 17 3. 564652 2. 559847 -1. 004805 18 4. 657295 2. 610010 19 4. 434672 20 Adjusted UI amount in Rs Lacs Additional UI energy in Mus (Overdrawal below 49. 2 hz) Additional UI Charge in Lacs NET UI AMOUNT -109. 87758 0. 000000 0. 00000 -109. 87758 -52. 12713 -44. 79033 0. 021299 0. 62620 -44. 16414 -2. 047285 -108. 18179 -119. 68508 0. 000000 0. 00000 -119. 68508 2. 567762 -1. 866910 -102. 74910 -111. 56801 0. 000000 0. 00000 -111. 56801 3. 864092 2. 543885 -1. 320207 -75. 19731 -72. 07128 0. 001750 0. 05144 -72. 01984 21 4. 281539 2. 234281 -2. 047258 -121. 61368 -128. 41405 0. 000000 0. 00000 -128. 41405 22 4. 014334 1. 953063 -2. 061271 -118. 06956 -127. 88160 0. 00000 -127. 88160 Total 29. 842102 17. 035507 -12. 806595 -679. 80017 -714. 28793 0. 023049 0. 67764 -713. 61029
UI FOR MES Dates Scheduled Drawal in Mus Actual Drawal in Mus UI Energy in Mus Admissible un adjusted UI amount in Rs. Lacs 16 1. 030915 0. 527369 -0. 503546 -19. 13828 17 1. 028491 0. 519858 -0. 508633 18 1. 056662 0. 519627 19 1. 007310 20 Adjusted UI amount in Rs Lacs Additional UI energy in Mus (Overdrawal below 49. 2 hz) Additional UI Charge in Lacs NET UI AMOUNT -20. 64436 0. 000000 0. 00000 -20. 64436 -24. 72170 -21. 24216 0. 000000 0. 00000 -21. 24216 -0. 537035 -26. 60829 -29. 43763 0. 000000 0. 00000 -29. 43763 0. 500870 -0. 506440 -26. 37728 -28. 64123 0. 000000 0. 00000 -28. 64123 0. 812088 0. 482978 -0. 329110 -18. 16691 -17. 41170 0. 00000 -17. 41170 21 0. 892862 0. 449887 -0. 442975 -25. 54169 -26. 96992 0. 000000 0. 00000 -26. 96992 22 1. 023900 0. 433735 -0. 590165 -33. 09842 -35. 84903 0. 000000 0. 00000 -35. 84903 Total 6. 852227 3. 434324 -3. 417903 -173. 65256 -180. 19603 0. 000000 0. 00000 -180. 19603
UI FOR GT Date s Declared Ex-bus Capacity in Mus Scheduled Ex-bus generation in Mus Actual Exbus generation in Mus UI Energy in Mus Admissibl e UI energy in Mus UI Amount in Rs. Lacs Admissible un adjusted UI amount in Rs. Lacs ADDITIONA L UI AMOUNT IN LACKS (Undergene ration below 49. 2 Hz) Adjusted UI amount in lacks NET UI 16 4. 636000 4. 043256 4. 110742 0. 067486 -2. 80211 0. 03077 -3. 02262 -2. 99186 17 4. 542500 3. 572520 3. 273184 -0. 299336 7. 81121 0. 00000 10. 35641 10. 3564 1 18 4. 134000 2. 993444 0. 000000 0. 00000 19 3. 810000 3. 299409 3. 363000 0. 063591 -3. 49528 0. 00000 -3. 79528 20 3. 684000 3. 131398 3. 183017 0. 051619 0. 048755 -3. 13507 -2. 96923 0. 06890 -2. 84580 -2. 77690 21 4. 204750 3. 217266 3. 289794 0. 072528 -4. 41397 0. 00845 -4. 66078 -4. 65234 22 3. 330000 2. 750236 2. 825861 0. 075625 0. 041483 -3. 39022 -1. 58074 0. 99193 -1. 71211 -0. 72018 Tota l 28. 341250 23. 007529 23. 039042 0. 031513 -0. 005494 -9. 42543 -7. 45012 1. 10004 -5. 68018 -4. 58015
UI FOR PPCL Declared Ex-bus Capacity in Mus Scheduled Ex-bus generation in Mus Actual Exbus generation in Mus UI Energy in Mus Admissible UI energy in Mus UI Amount in Rs. Lacs Admissible un adjusted UI amount in Rs. Lacs ADDITIONAL UI AMOUNT IN LACKS(Under generation below 49. 2 hz) Adjusted UI amount in lacks 16 5. 792000 5. 684450 5. 795040 0. 110590 -3. 53735 0. 00000 -3. 81572 17 4. 734000 4. 686791 4. 776168 0. 089377 -4. 88030 0. 00000 -4. 19341 18 4. 735000 4. 687169 4. 776774 0. 089605 0. 088879 -6. 17279 -6. 12415 0. 00000 -6. 77535 19 4. 752000 4. 698892 4. 766580 0. 067688 0. 067687 -4. 29028 0. 00000 -4. 65851 20 4. 800000 4. 740000 4. 808238 0. 068238 -3. 70784 0. 08208 -3. 55370 -3. 47162 21 4. 835000 4. 669032 4. 758786 0. 089754 -5. 40414 0. 01139 -5. 70632 -5. 69494 22 3. 186750 3. 144570 3. 162702 0. 018132 -0. 98391 0. 27452 -1. 06568 -0. 79116 Total 32. 834750 32. 310904 32. 844288 0. 533384 0. 532657 -28. 97661 -28. 92797 0. 36799 -29. 76870 -29. 40071 Dates NET UI
UI FOR IP Date s Declare d Exbus Capacit y in Mus 16 1. 64450 0 17 1. 90841 7 18 2. 25408 3 19 2. 25100 0 20 2. 21441 7 21 2. 00133 3 22 1. 80400 0 Total 14. 0777 50 Schedule d Ex-bus generatio n in Mus 1. 644500 1. 908417 2. 254083 2. 251000 2. 214417 2. 001333 1. 804000 14. 077750 Actual Exbus generatio n in Mus UI Energy in Mus Admissi ble UI energy in Mus 1. 658905 0. 01440 5 0. 01096 0 1. 840495 0. 06792 1 0. 06861 8 2. 243157 0. 01092 6 0. 01114 9 2. 266078 0. 01507 8 0. 01438 7 2. 225970 0. 01155 4 ADDITION AL UI AMOUNT IN LACKS(U ndergener ation below 49. 2 Hz) Adjuste d UI amount in lacks w/o capping Adjuste d UI amount in lacks with capping NET UI 0. 00547 0. 65104 1 0. 50874 5 -0. 50328 0. 08325 5. 40793 0 3. 72774 2 3. 81100 0. 07170 0. 17530 5 0. 18412 7 -0. 11242 0. 01968 0. 86056 4 0. 60761 7 -0. 58794 0. 00647 4 0. 00733 0. 34381 4 0. 24316 8 -0. 23584 1. 998300 0. 00303 4 0. 00508 9 0. 04207 0. 34820 2 0. 17105 4 0. 21313 1. 787992 0. 01600 8 0. 01633 7 0. 06717 0. 70578 8 0. 48138 6 0. 54856 14. 020899 0. 05685 1 0. 06937 2 0. 29668 4. 43120 2. 83652 3. 13321
UI FOR RPH Dates Declared Ex-bus Capacity in Mus Scheduled Ex-bus generation in Mus Actual Exbus generation in Mus UI Energy in Mus Admissible UI energy in Mus ADDITIONAL UI AMOUNT IN LACKS( Undergeneratio n below 49. 2 hz) Adjusted UI amount in lacks with capng NET UI 16 2. 208000 2. 198263 -0. 009737 0. 00000 -20. 45162 -21. 65065 17 2. 208000 2. 159098 -0. 048902 0. 16395 3. 39122 2. 48394 2. 64790 18 2. 212500 2. 210211 -0. 002289 0. 03323 -0. 00441 -0. 02633 0. 00690 19 2. 208000 2. 209488 0. 001488 0. 00000 -0. 27186 -0. 14904 20 2. 208000 2. 219223 0. 011223 0. 00667 -0. 76728 -0. 45285 -0. 44618 21 2. 228000 2. 231114 0. 003114 0. 00955 -0. 15399 -0. 12367 -0. 11412 22 2. 208000 2. 222561 0. 014561 0. 01833 -0. 99590 -0. 63951 -0. 62118 Total 15. 480500 15. 449958 -0. 030542 0. 23173 -19. 25384 -20. 55811 20. 32638
UI FOR BTPS Date s Declared Ex-bus Capacity in Mus Schedule d Ex-bus generatio n in Mus Actual Exbus generatio n in Mus UI Energy in Mus ADDITIO NAL UI AMOUNT IN LACKS( Underge neration below 49. 2 Hz) 16 15. 388750 14. 826250 15. 154260 0. 32801 0 0. 00000 17 15. 600000 15. 256250 15. 687024 0. 43077 4 18 15. 556250 15. 525000 15. 771144 19 15. 576500 15. 456500 20 11. 993750 21 UI AMOUNT WITH CAPPING Adjusted UI amount in lacks with capng NET UI -11. 73851 -15. 181922 -12. 728946 12. 72895 0. 04419 -13. 35715 -13. 849539 -11. 478003 11. 43381 0. 24614 4 0. 00807 -8. 04483 -14. 137479 -9. 001220 -8. 99315 15. 758688 0. 30218 8 0. 07429 -10. 86938 -15. 855329 -11. 928347 11. 85405 11. 993750 12. 127956 0. 13420 6 0. 00850 -4. 16028 -6. 785170 -4. 044691 -4. 03619 13. 276250 13. 479324 0. 20307 4 0. 00000 -4. 23386 -6. 668422 -4. 493547 -4. 49355 22 14. 922000 15. 088128 0. 16612 8 0. 17622 -5. 22518 -7. 568047 -5. 683988 -5. 50777 Total 102. 31350 0 101. 25600 0 103. 06652 4 1. 81052 4 0. 31128 -57. 62919 -80. 04591 -59. 35874 59. 04746
APPROVEL OF METHODOLOGY ADOPTED FOR DRAW OUT OF OVERDRAWAL OF DISCOM BETWEEN 49. 5 Hz & 49. 2 HZ AS PER LIMITS DEFINED BY DERC AND ADJUSTMENT REGARDING MISMATCH ARISING IN UI ACCOUNT DURING THE INTERIM PERIOD i. e. 01. 04. 09 TO 20. 04. 09 AS PER DERC ORDER DATED 21. 04. 09 THE LIMITS AS PER DERC ORDER ARE AS FOLLOWS: Over Drawal Allowed S. NO. Name of the utility % of its scheduled drawal MW 3% on daily aggregate basis 1 BRPL 12% 57 3% 2 NDPL 12% 38 3% 3 BYPL 12% 35 3% 4 NDMC 12% 17 3% 5 MES 12% 3 3% TOTAL 150