stak hf A brief introduction to operations in
Ístak hf A brief introduction to operations in Greenland
Ístak‘s annual turnover from 2003 – 2015 (in million ISK)
All contracts 2006 – 2013 divided between countries 100, 000 All numbers are in thousand ISK 90, 000 80, 000 Renovation 70, 000 Roads, tunnels and airstrips 60, 000 Power plants and industry 50, 000 Harbour projects 40, 000 15% 30, 000 Buildings 20, 000 10, 000 0 Iceland Norway Greenland Faroe Islands Jamaica
Greenland hydropower projects Client: NUKISSIORFIIT Contractor: ÍSTAK for 3½ of the 5 Construction time: see below Hydro Projects: Nuuk / Buksefjord 30 MW, started 1993 2012 Tasiilaq 1, 2 MW, 2002 - 2004 Qorlortorsuaq 7, 5 MW, 2004 - 2007 Sisimiut 2 x 7, 5 MW, 2007 - 2010 Ilulissat 3 x 7, 5 MW, 2010 – 2013 The last three were turn-key projects
Ilulissat - hydropower • • Scope: Construction of powerhouse cavern, headrace-, tailrace tunnels, turbine installation and high voltage transmission line. Contract: Turn key. Time schedule: May 10 – Dec 13 Contract sum: 107 M USD
6
7
5419 – Ilulissat
5419 – Ilulissat
Subcontractors Tucon Slovakia Kössler Austria Etra Slovenia LDW Germany ABB Denmark Metalvar Slovenia/Serbia 10 Dalekovod Croatia
Suppliers from Greenland
Suppliers from Greenland Total Contract 600 M DKK Suppliers and subcontr. in Greenland 120 M DKK Salaries in Greenland 150 M DKK (thereof taxes paid 60 M DKK)
Other projects in Greenland • • • Client: Municipalities in Nuuk, Ummannaq Contractor: ÍSTAK Construction time: Mars 2009–Sept 2011 Construction Projects: Nuuk Elementary school – finished 2011 Nuuk Playschool and kindergarten – f. 2011 Ummannaq High school dorm renovation 2013
Various tunnel projects Hammerfest 2010 - 2012 Alta Talvik Ilulissat 2010 – 2013 Narvik Sisimiut 2006 – 2010 Fáskrúðsfjarðargöng 2004 - 2006 Hraunaveitur 2007 – 2008 Búðarháls 2010 – 2013 Quassimiut 2004 - 2008 2011 - 2013 – 2015 Målvikhammar 2011 - 2013 Bergen 2009 – 2011 Suðuroy 2005 – 2007 Lovraeidet 2012 – 2014
- Slides: 14