SPT CE Operations Overview Denes Talosi 20032013 SPT
- Slides: 35
SPT CE Operations Overview Denes Talosi 20/03/2013
SPT CE Operations � Content Processing � Coordination � Non-Linear � MC-CE Op Gap analyzes
Content processing Long form Ingest/QC
The Operation team � Post ◦ ◦ ◦ ◦ ◦ Production Ingest QC Daytime edits Audio Conform Non-Linear production Formating Compliance view Segmentation Internal services (OAP, Digital, Marketing, Sales)
The Operation team � Coordination ◦ ◦ ◦ Shipping, Delivery Administration Task scheduling Contact playout, vendors, distributors Existing version acquiring Internal services (OAP, Digital, Marketing, Sales)
Volume � 2700 acquired programing hours ◦ 80% HD – 50 Tbyte ◦ 20% SD – 12 Tbyte � 2000 premier commercials /month � around 1800 promo cuts /month
Audio Versioning � Dub aquireing territories ◦ Czech 45% (600 hours/year) ◦ Hungary 50% (700 hours/year) � Other ◦ Poland (Voice over) ◦ Bulgaria (pending)
Subtitle Versioning � Subtitle ◦ ◦ ◦ only Romania Macedonia Serbia Croatio Slovenia Bulgaria � Sub insertion ◦ Hungary ◦ Czech
4 x Edit station 3 x QC station Content hits directly an editor for • Technical QC • Format conversion • Content check (order etc) • Removal of textless elements • Reduction of blacks
� Catch Up production XRE render server to allow 24/7 ingest station availability
Output formats
Coordination Shipping, Ingest, QC, Versioning, Delivery
Operations report ◦ ◦ ◦ Access database User based access Workflow selection (18 existing workflow templates) License and TX date workflow management Episode based title generation Deadline allocation for every episode Personal Task scheduling and prioritisation(ingest, QC traffic) Interactive status updates Multi level follow up for localization vendors Traffic coordination(follow up) Reporting (alert, vendor, red materials etc) Planned implementation of an SQL solution
ENTERING NEW SERIES
ADD LANGUAGE VERSIONS AND VENDOR
WORKFLOW TEMPLATE
VISION INTEGRATION “PULL” THROUGH LISTING
Non Linear Production VOD/OTT/Catch Up
Non - Linear 30, 000 hours output yearly (60 Tbyte, 250 GB) � Catch Up � Classis Set Top Box VOD (AVOD, SVOD, TVOD) � OTT � BIVL � Mobile
Va. Mo. S Fully covers catch up needs With the delivery of 18, 000 content per year. � BC/MPX ◦ Catch UP ◦ Mobile ◦ BIVL Metadata grabbing from Vision listing
VOD 7 platforms in operation Potential 46 platforms to launch 30 -100 ph/ package with the avg. 300 GB Challenges � Library management � Scheduling � Metadata � Content Production � Delivery
VOD � Existing � By resources covers up to 10 platforms September 20 platforms expected � Short term Solution needed
VOD – Short term � Production side ◦ HR (VOD operator) ◦ Production (storage 20 T, Carbon Coder 57 k USD) � Scheduling ◦ Access based solution (25 k USD) ◦ Or/and HR (Planner)
� Catch Up production
VOD Support Timing Number of platforms Phase 1 As of Today 10 platforms to launch by the 1 st of April Refreshment Volume HR Requirements per month SD HD Total* 250 20 platforms in operation Phase 3 end of FY 14 46 platforms in target 450 480 Phase 2 1 st Jun 2013 50 120 960 1104 276 2208 Covered (ingest editor, traffic coordinator) Technical Covered (Pro. Coder 8, XRE) Scheduling Metadata Covered (Excel based) VOD Operator (annual) Dedicated Storage, Access $24, 000 Carbon. Coder $57, 000 based Scheduler (annual) Media Centre $24, 000 (Eagle) Vision 4. x *The production of one HD esset equals four SD output **the above calculation estimates that all platforms are capable for archiving ***30 ep per package ****20% of HD production ***** Both scheduling and production depends of the complexity of the platform. There is no linear calculation (platform exclusivity, pre rolls, subtitling etc ) Covered $25, 000 with access Vision 4. x
PROCESS OF A PLATFORM LAUNCH
MC-CE Op Gap analyzes CE Limitations, Benefits, Priorities
CE Op limitations Major bottle neck is on the VOD side � Long form storage (archive and restore) � VOD scheduling and delivery � Remote ingest working storage (Source content pulling for a mid term storage) � 1 Gig Bp-Lon connection
MC benefits for CE � Source storage as a buffer to pull Cineshare – Aspera etc � Remote ingest � Implementation of Operations report functions into the MAMs � Asset Delivery (vendors, playout, non-linear) � Harding FPA test for TX ready contents � System integrations
Functional priorities � Long Form Archive � Asset management � Receipt of Source contents to a buffer storage Integration (Vision) � VOD scheduling � Schedule driven multi platform transcoding � Automated Content Delivery (VOD, Playout, Studios etc)
- Denes kubicek
- Gábor dénes szeged szakok
- Bots dénes
- Ekonomski fakultet skopje
- Overview of airport operations
- The ratio of total depth
- Batas lapor pph 21
- Spt analyzer
- Pembebanan bengkel kerja
- Dilemma der ablaufplanung
- E spt masa 2126
- Jpa.bp.spt.b03a
- Maschinenbelegungsplan regeln
- Fcfs sequencing
- Johnson algorithmus
- Donut hammer spt
- Itgs triangle
- Nist cybersecurity framework overview
- Overview of the major systemic arteries
- Business overview template
- Gprs overview
- Project title examples
- Overview of integrated marketing communications
- Data quality and data cleaning an overview
- Function of investment bank
- Nagios tactical overview
- Education.splunk
- Sap basis overview
- Texas public school finance overview
- Product overview definition
- Sbic program
- C# collections overview
- Market overview slide
- Internal and external deviation in stylistics
- I company
- Mnemonics microprocessor