SPS LSS 2 extraction line Presentation overview LSS Slides: 15 Download presentation SPS LSS 2 extraction line Presentation overview • LSS 2 layout • Tunnel model • Accelerator element models • Current status of the project • Outlook of the project Tunnel layout Period 216 Period 217 Period 218 Period 219 Tunnel 4315 cm with an inner diameter of 15 cm 4547 cm with an inner diameter of 28 cm 3956 cm with an inner diameter of 15 cm 60 or 100 μm Electroseptum (ZS) 3. 2. 1. 4. 5. Difficulties: • 2080 wires • Electric field 1. Invar/stainless steel 2. Stainless steel 3. Aluminum 4. Ceramic 5. Rhenium/ tungsten 312 cm Electric field simulation 1 Each particle will be missing a maximum energy equal to its net charge times 220 ke. V Electric field simulation 2: validation Quadrapoles QFA 216 - 218 QDA 219 TCE Collimator 2. 1. GG 20 Grey Cast Iron 2. c. SS 304 L Stainless steel TPST Protection shield for septum magnet MST 1. 2. 3. 4. Fortified Steel c. SS 304 L Stainless steel Copper Cu. ETP Copper with 1% Oxygen 1, 4 3 2 2 MPNH Bumper magnet, pulsed, normal, horizontal deflection 1 2 3 1. Low. CSTL Low carbon steel 2. c. SS 304 L Stainless steel 3. Copper MST and MSE MST Septum magnets 1 2 3 MSE 4 1. 2. 3. 4. Low. CSTL Low carbon steel C 10100 Oxygen-free Copper Water c. SS 304 L Stainless steel Current status Project outlook • Finish building geometry • Validate the geometry • Determine beam parameters • Begin analysis Thank you Questions? Lss software tutorialsLss sumaLss ptarLsc-lic > lss-lisLss-1003LssAreanna aiWhat is representative fractionSelbsthaltung sps fupUniversidad pedagogica spsIkg rtTbt imsSps imsSgra upmNato sps programmeElma sps