SPECIALTY POLYMER COATINGS, INC. Single Coat 100% Solids Tank Linings
Tank Linings with 100% Solids l Excellent abrasion l Quicker turn around (3 -5 times) l No VOC limitations / restrictions l No solvent entrapment l No inter-coat adhesion issues l Higher DFT achievable
Typical uses for 100% Solids linings in storage vessels l Lining of floor and walls l Hydro Carbon tanks usually lined 1 – 1. 5 m (3. 5 -5. 5 feet) up wall l Chemical service tanks/vessels often entire internal surface l Secondary containment
100%Solids Linings l Petro-Chemical l Sewage / Wastewater H 2 S l Potable Water l Acids / Alkyds l Pulp & Paper
Surface Preparation l Surface Preparation is Key!! l NACE #2 / SSPC SP 10 Near White Metal – typical minimum l NACE #1 / SSPC SP 5 White Metal Best (difficult on existing metal) l 2. 5 mil-5 mil anchor profile recommend
SSPC SP 10 Near White Metal Grit Blast
Sharp welds ground smooth prior to blasting
100% Solids Excellent at covering welds and seams jeep free
Sharp angles difficult to coat / Stripe coating recommended
Stripe coating of welds
Advantages l Better Chemical resistance l Higher abrasion values l Higher adhesion to grit-blasted steel l Higher immersion temperatures l Less expense / single coat application l Thicker films possible (longer life) l Quick curing / faster turn-around
Disadvantages l Plural Component equipment can be complicated, Experienced applicators a must! l Re-Coat times are shorter than solvinated l Off ratio application = expensive coating removal
Variable ratio plural component equipment
Fixed Ratio Plural Component Equipment
100% Solids linings for concrete l l l Again Surface Preparation is Key!!! Grit blasting recommended to remove any loose concrete, providing a clean new substrate to increase adhesion Bug holes need to be filled (often twice) A moisture tolerant epoxy primer best for concrete Green concrete needs to be cured for 26 days for best results
Freshly blasted concrete
Filling of bug holes
Bug holes after primer Often more bug holes are present after the primer has been applied l A second application is often required for best results l
Final application of 100% Solids NSF Epoxy
Special Considerations l De-Humidification may be required to hold the grit blast on steel substrates l Cold climates may require insulation on the tank exterior to prevent condensation l Heating often required to cure out coatings in cold weather
Ensuring Longevity / Quality l l l Choose and experienced qualified contractor Research the lining/coating choice for the environment & contents Have a NACE/SSPC qualified coating inspector present the entire job! Ensure your contractor has experience with the lining/coating for your job * If one bid is greatly lower than the rest there is a reason why!
Thank you, Any Questions? Jerry Holton 11225 State Route 90 Locke, NY 13092 Office: 315 -497 -1528 Cell: 315 -283 -3906
- 100 100 100 100 100
- Phenalkamide
- Plural component spray
- Hospital wall coatings
- Hts coatings
- Alocit
- St powder coatings
- Kale group of industries
- St powder coatings
- Sherwin williams chemical coatings store
- 40 sayısının %25 i kaçtır
- 200+200+100+100
- 100 men and 100 women took a test
- Malloc lab 100/100
- Héroïne dans la guerre de 100 ans (100 years war).
- 100+100=200
- 100 iops/gb and 100,000 iops per volume oci
- 100 + 100 200
- C/100=f-32/180=k-273/100
- What's 100 + 100
- 200 200 300
- 2000 en romano
- 100 200 300
- Sisd example
- Single instruction single data
- Multi channel multi phase example
- Specialty store retailer of private label apparel