SparkIgnition Marine Engine Draft Proposal 332010 1 Presentation

  • Slides: 18
Download presentation
Spark-Ignition Marine Engine Draft Proposal 3/3/2010 1

Spark-Ignition Marine Engine Draft Proposal 3/3/2010 1

Presentation Outline • • • Objective Updates to Draft Proposal Key Elements of Updated

Presentation Outline • • • Objective Updates to Draft Proposal Key Elements of Updated Draft Proposal – – • • • Options for Certification Design Requirements Performance Requirements Compatibility Requirements Status of Emissions Inventory Rulemaking Timeline Comments/Questions? 3/3/2010 2

Objective Inform stakeholders of major changes to updated draft proposal 3/3/2010 3

Objective Inform stakeholders of major changes to updated draft proposal 3/3/2010 3

Updates to Draft Proposal • Implementation Dates – Harmonize with U. S. EPA rule

Updates to Draft Proposal • Implementation Dates – Harmonize with U. S. EPA rule for ≤ 40 HP beginning in MY 2012 – Harmonize with U. S. EPA rule for >40 HP in MY 2012 and MY 2013 – Set more stringent standards for >40 HP beginning in MY 2014 • ORVR – ORVR has been removed from the proposal – However, ARB proposal will require Phase II compatible fill deck plates 3/3/2010 4

Draft Proposal – Key Elements Summary Table - ≤ 40 HP Design Requirements Harmonized

Draft Proposal – Key Elements Summary Table - ≤ 40 HP Design Requirements Harmonized Design Based Standards (≤ 40 HP) Effective Date Model Year 2012 and later Applicable Marine Vessel Type and Test Procedures All Marine Vessels Test Procedure Fuel Tank Permeation Diurnal Requirement Grams/m 2/ Day ROG Grams/Gal/ Day HC Fuel Injection Or Equivalent Grams/Hr Grams/m 2/ day ROG 15. 0 1. 5 0. 4 N/A 1. 5 40 CFR § 1060. 515 or SAE J 1737 40 CFR § 1060. 520 40 CFR § 1060. 525 N/ A 40 CFR § 1060. 521 Under Cowl Fuel Hose Permeation Grams/m 2/ Day ROG 15. 0 40 CFR § 1060. 515 Fuel Cap • ARB Certification begins in MY 2012 • Can only certify by design 3/3/2010 5

Draft Proposal – Key Elements Options for Certification For >40 HP Proposed Spark-Ignition Marine

Draft Proposal – Key Elements Options for Certification For >40 HP Proposed Spark-Ignition Marine Engine regulation has two methods of certification: • Design-Based – Requires low permeation components and standards for venting and marine engine performance – – low permeation fuel hose low permeation fuel tank venting performance test meet fuel injection definition or perform fuel injection performance test • Performance-Based Alternative – One standard applied to the complete evaporative system – – Based on a 24 -Hour Diurnal Test (California Summer Profile) The standard will be based on E 10 • 90% California Phase 3 Reformulated Gasoline with 10% by volume ethanol (Phase 3 CERT) 3/3/2010 6

Draft Proposal – Key Elements Design Requirements – Fuel Hose • Fuel Hose Permeation

Draft Proposal – Key Elements Design Requirements – Fuel Hose • Fuel Hose Permeation Standard – 5. 0 grams/m 2/day • Test Procedure – 40 CFR 1060. 515 – High Accuracy Option – SAE J 1737 – Test temperature • 40°C – Test fuel • E 10 or CE 10 3/3/2010 7

Draft Proposal – Key Elements Design Requirements – Fuel Tank • Fuel Tank Permeation

Draft Proposal – Key Elements Design Requirements – Fuel Tank • Fuel Tank Permeation Standard – 0. 70 grams/m 2/day • Test Procedure – 40 CFR 1060. 520 – Test temperature • 28°C – Test fuel • E 10 or CE 10 3/3/2010 8

Draft Proposal – Key Elements Design Requirements – Diurnal • Diurnal Performance Standard –

Draft Proposal – Key Elements Design Requirements – Diurnal • Diurnal Performance Standard – 0. 25 grams/gallons/day • Test Procedure – 40 CFR 1060. 525 – Test fuel • E 10 • Diurnal standard can be met with any technology – However, if a pressure relief valve is used, durability must be demonstrated 3/3/2010 9

Draft Proposal – Key Elements Design Requirements – Fuel Tank • ARB performed 40

Draft Proposal – Key Elements Design Requirements – Fuel Tank • ARB performed 40 CFR 1060. 520 on a 33 gallon tank with a 1. 5 L canister 3/3/2010 10

Draft Proposal – Key Elements Design Requirements – Fuel Injection • Meet Fuel Injection

Draft Proposal – Key Elements Design Requirements – Fuel Injection • Meet Fuel Injection Definition – “Fuel Injection is defined as any mechanical or electrical fuel system in which pressurized fuel is sprayed or injected into the intake system of an internal combustion engine. ” or • Perform Fuel Injection Performance Test – Standard • 0. 2 grams/hour – Test Procedure • TP-1502 – 3 -hour Hot Soak @ 105 F • Test fuel – E 10 3/3/2010 11

Draft Proposal – Key Elements Summary Table - >40 HP Design Requirements Design Based

Draft Proposal – Key Elements Summary Table - >40 HP Design Requirements Design Based Standards (> 40 HP) Effective Date Model Year 2012 and 2013 2014 and later Applicable Marine Vessel Type and Test Procedures All Marine Vessels Test Procedure All Marine Vessels With Horsepower > 40 HP Test Procedure Under Cowl Fuel Hose Permeation Fuel Tank Permeation Diurnal Requirement Grams/m 2/ Day ROG Grams/Gal/ Day HC 15. 0 1. 5 40 CFR § 1060. 515 or SAE J 1737 15. 0 *40 CFR § 1060. 515 Fuel Injection Or Equivalent Fuel Cap Grams/Hr Grams/m 2/ day ROG 0. 4 N/A 1. 5 40 CFR § 1060. 520 40 CFR § 1060. 525 N/ A 40 CFR § 1060. 521 5. 0 0. 70 0. 25 0. 2 1. 5 ***40 CFR § 1060. 515 or SAE J 1737 *40 CFR § 1060. 520 **40 CFR § 1060. 525 **TP-1502 *40 CFR § 1060. 521 *Using a test fuel of either Phase 3 CERT fuel or CE 10 fuel. **Using Phase 3 CERT fuel. ***Using Phase 3 CERT fuel or CE 10 fuel with a test temperature of 40° C. As an option for high accuracy testing, manufacturers may use SAE J 1737. ****ARB certification begins in MY 2012. 3/3/2010 12

Draft Proposal – Key Elements Performance Requirements Performance Alternative Standard Performance Requirements Effective Date

Draft Proposal – Key Elements Performance Requirements Performance Alternative Standard Performance Requirements Effective Date Model Year Applicable Vessel Type Diurnal Standard Grams HC/day 2014 and subsequent All Spark-Ignited Marine Vessels with Engine Horsepower > 40 HP 0. 048 * Tank Volume (liters) + 0. 97 Test Procedure • TP-1501 – One 24 -hour diurnal SHED test using the California Summer Profile • Test fuel – E 10 3/3/2010 13

Draft Proposal – Key Elements Compatibility Requirements • Fuel fill deck plate design –

Draft Proposal – Key Elements Compatibility Requirements • Fuel fill deck plate design – Meet fill pipe face requirements in fill plate design • 13 CCR Section 2235 • Fuels – The fuel system must be compatible with commercially available pump fuel for sale at the time the boat is sold 3/3/2010 14

Status of the Emissions Inventory • Updated emissions inventory will include: – Additional SHED

Status of the Emissions Inventory • Updated emissions inventory will include: – Additional SHED testing data – CSUS storage and usage survey data – Updated growth population estimate based on economic impact of sales • Estimated completion date: late March 3/3/2010 15

Rulemaking Timeline • Final Workshop – A workshop for the Spark-Ignition Marine rulemaking will

Rulemaking Timeline • Final Workshop – A workshop for the Spark-Ignition Marine rulemaking will be held on April 28 • Board Hearing – Staff is preparing to go to the Board in September 3/3/2010 16

Comments/Questions? 3/3/2010 17

Comments/Questions? 3/3/2010 17

Contacts Monitoring and Laboratory Division (For Questions Concerning the Rule Development) • Scott Monday

Contacts Monitoring and Laboratory Division (For Questions Concerning the Rule Development) • Scott Monday – • Project Lead, (916) 445 -9319, smonday@arb. ca. gov Jim Watson – Manager, Evaporative Control, Engineering, and Regulatory Development Section • (916) 327 -1282, jwatson@arb. ca. gov Planning and Technical Support Division • (For Questions Concerning the Emissions Inventory) Satya Sardar – • Staff, (626) 450 -6137, ssardar@arb. ca. gov David Chou – Manager, Evaporative Control, Engineering, and Regulatory Development Section • (916) 450 -6136, cchou@arb. ca. gov Mobile Source Operating Division • (For Questions Concerning Certification) Kumar Muthukumar – Manager, Off-Road Certification/Audit Section • (626) 575 -7040, cmuthuku@arb. ca. gov 3/3/2010 18