South Grid Technical Meeting Pete Gronbech South Grid
South. Grid Technical Meeting Pete Gronbech South. Grid Technical Coordinator EVO March 2012
Q 411 Metrics % of promised (by that time) disk available to Grid. PP % of promised (by that time) CPU available Average SAM (SLL page) availability performance over the last quarter Average SAM (SLL page) reliability performance over the last quarter Average SLL untargeted ATLAS test performance (UK test) Approx. CPU utilisation (wall clock time) Approx. CPU utilisation (CPU time) Overall delivering more CPU (185%) and Disk (236%) than the Mo. U. Slight increase compared to earlier in the year, but major changes will come with the Grid. Pp 4 h/w tranche purchases Availability/reliability dropped at most sites; Why? CPU utilisation remains acceptable. South. Grid January 2012 2
UK Tier 2 reported CPU – Historical View to present 10000000 9000000 8000000 7000000 UK-London-Tier 2 6000000 UK-North. Grid 5000000 UK-Scot. Grid UK-South. Grid 4000000 3000000 2000000 1000000 0 May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan 10 10 11 11 11 12 K SPEC int 2000 hours South. Grid January 2012 3
South. Grid Sites Accounting as reported by APEL 3500000 3000000 JET 2500000 BHAM BRIS CAM 2000000 OX RALPPD 1500000 1000000 500000 0 May- Jun- Jul-10 Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul-11 Aug- Sep- Oct- Nov- Dec- Jan 10 10 11 11 11 12 K SPEC int 2000 hours South. Grid January 2012 4
What about the rest of Grid. PP sites? South. Grid January 2012 5
Other Grid. PP Tier 2 Resources • Scot. Grid • North. Grid Site HEPSPE C 06 Storage (TB) CPU (HS 06) 28627 992 3395 515 Liverpool 8390 543 2996 554 22264 687 7284 224 4800 298 1198 252 64081 2520 14873 1545 Manchester Sheffield Totals Site DURHAM ECDF GLASGOW Storage (TB) Lancaster Site UKI-LT 2 -Brunel UKI-LT 2 -IC-HEP UKI-LT 2 -QMUL UKI-LT 2 -RHUL UKI-LT 2 -UCLHEP Totals Promised (Grid. PP Mo. U 2011) HEPSPEC 06 Storage (TB) CPU (HS 06) Storage (TB) 11371 570 6317 176 17993 1200 19439 522 28622 1320 6302 956 9558 706 4620 213 2006 69550 HEPSPEC 06 Storage (TB) CPU (HS 06) Storage (TB) 8141 23 3916 104 14445 177 3118 77 21300 1363 11638 1341 Total available to Grid. PP 159 3955 515 37193 Promised (Grid. PP Mo. U 2011) • South. Grid • London. Grid Total available to Grid. PP Total available to Promised (Grid. PP Mo. U Grid. PP 2011) Site EFDA JET Birmingham Bristol Cambridge Oxford RALPP Totals Total available to Grid. PP Promised (Grid. PP Mo. U 2011) HEPSPEC 06 Storage (TB) CPU (HS 06) Storage (TB) 1772 10. 5 0 0 3345 195 2119 95 2247 110 1173 27 2445 255 1445 135 8961 620 2483 255 18974 1060 13109 440 37744 2250 20329 951 14 1881 South. Grid January 2012 6
Gridpp 4 h/w generated Mo. U for 2012 -14 Old Mo. U GPP 3 h/w 2012 TB bham 124 bham 282 346 bris 96 96 116 cam 123 139 167 ox 409 456 549 19 21 26 830 862 1034 35 cam 174 ox 328 Jet RALPPD 573 RALPPD Total 1244 2012 HS 06 2014 TB 265 bris Total 2013 TB 1744 1857 2237 2012 HS 06 2013 HS 06 2014 HS 06 bham 3375 3305 4184 bris 1651 1619 1982 cam 730 770 949 bham 2724 bris 1429 cam 1738 ox 3287 3372 4173 ox 2974 Jet 166 169 208 10082 9959 12243 RALPPD 16515 RALPPD South. Grid January 2012 7
Future Resources • New Mo. U’s show lack of Storage space at Birmingham, and Jet, with a problem at Bristol in 2014 • Shortage of CPU at Birmingham by 2014. • This all assumes current levels of resources at sites. Old storage and CPU will come out of warrantee and be retired so new purchases need to maintain enough resource to cover the Mo. U commitments South. Grid January 2012 8
Grid. PP 4 h/w Grants Actual Grants Brunel 68000 IC 133500 QM 107000 RH 66500 UCL 7500 LAN 78500 LIV MAN 40500 SHEF 32000 DU EC GLA 92000 5500 33000 114500 BHAM 35500 BRIS 14500 Cam 13000 OX 45500 RAL 109500 jet Sussex 0 Actually £ 3000 5000 South. Grid January 2012 9
DRI Grants • An unexpected bonus was the Digital Research Infrastructure Proposal. Work started in late October, and by the end of the year we had submitted grant requests for a total of £ 3 m. 10
Procurement deadlines etc • Both the Grid. PP 4 h/w grant and the DRI money must be spent before the end of this Financial Year ie 31 st March 2012. • Orders had better be made now or very soon. • Invoices should be paid before 31 st March 2012 South. Grid January 2012 11
Sussex • Suspended or Candidate sites • • Later this week, sites in suspended or Candidate state for longer than 6 months will be closed - COD has collected a list of exceptions from NGIs. This does not affect any Grid. PP site, except maybe Sussex. I note that as per https: //ggus. eu/ws/ticket_info. php? ticket=78177, Sussex is set as 'Uncertified', (my memory says it used to be 'Candidate', although I can't recall what the difference between the two is right now). • Plans to grid enable…. South. Grid January 2012 12
SL 4 EOL • SL 4 support finished yesterday – What servers are still out there • LCG-CE • DPM • ? ? South. Grid January 2012 14
Conclusions • • • South. Grid sites utilisation level except maybe RALPP? JET will be setup for ATLAS production new h/w will help. RALPPD still our lead site. Sussex, Warwick and Swansea had DRI money, what will this lead to? Main goal at the moment is to spend the two grants asap. South. Grid January 2012 15
- Slides: 14