SMB SMBSE group L Scibile 1 Mandate SMB
SMB SMB-SE group L. Scibile 1
Mandate SMB • The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures and the technical services for the tertiary part of the organization. • The abovementioned responsibilities include all phases from design and construction to operation and maintenance of complete built assets. 2
Groups scope SMB From minor works From Design to construction and Operation & Maintenance to complex projects 3
Groups objectives and priorities SMB • Objectives: – FUTURE ACCELERATOR STUDIES – a world class expertize. – PROJECTS – a productive and efficient team. • HL-LHC, LS 2 and Consolidation of the infrastructure – SERVICES – a service oriented culture. • Priorities: – – Safety Strategic projects (HL-LHC, LS 2 and Consolidation of the infrastructure) Machine availability Users satisfaction 4
SAFETY SMB • RISKS : – The risk of an accident is higher when underestimated. – In the case of doubts, ask your supervisor or your DSO. – Adapt your behavior to the situation. • For the newcomers: – Get informed and trained about the specific risks on the CERN site: • Safety rules: https: //espace. cern. ch/Safety-Rules-Regulations/en/Pages/default. aspx • Safety Training: https: //espace. cern. ch/info-safetytraining-official/Pages/default. aspx • For the supervisors: – Brief your supervisee about the risk they might face on their new assignments. Habilitation Electrique !!!! 16/12/14 EDMS: 1456161
Group Structure SMB 6
Group Structure Patrimony and External relations SMB Consolidation program execution Mainly machine Project execution Studies for future accelerators and existing tunnel structures Mainly tertiary Works, Operation and Maintenance 7
SMB SECTIONS’ PRESENTATIONS 8
The group in numbers • 2015 Budgets: + ~ 10 MCHF on other departments budgets – Projects: ~43 MCHF – Operation: ~7 MCHF 13. 34 2016 FTE distribution 9. 1 3 Future Major Machine Projects 6. 53 4. 8 Machine Projects Tertiary Projects Minor works services • 2016 Budgets: – Projects: ~30 MCHF – Operation: ~7 MCHF SMB Operationand Maintenance 3. 1 3. 5 Engineering support Group Management + ~ 20 MCHF on other departments budgets 9
Group core activities (1/2) SMB • Projects – Civil Engineering for the accelerators (Machine) – Civil Engineering for the site (Tertiary) • Studies – New accelerators and experiments – Master. Planning – Modifications and usage of current infrastructures – Energy usage and strategies 10
Group core activities (2/2) SMB • Services – – – – Building, tunnels and road maintenance, repairs, minor works HVAC maintenance and works for tertiary buildings Sanitary maintenance and works for tertiary buildings Electricity maintenance and works for tertiary buildings Patrimony and GIS CERN district heating operation and maintenance Engineering support • In the last 12 months, ~14000 interventions were carried out! 11
Hard Facility Management Services 2016 -2020 SMB • Increase efficiency with integrated tools • In 2016 -2019 renew all the framework contracts • Implement small value frame contracts with specialized local companies (sanitary, insulation) • Clarify and negotiate new perimeter of intervention with EN to increase overall efficiency. • Review the limit of the services provided. 12
Site Engineering design services 2016 -2020 SMB • Increase capacity of design integration • Strengthen support to other sections through streamlined/standard procedures/templates. 13
Projects 2016 -2020 SMB • Setup a strong team for the HL-LHC civil engineering works. • Implement the consolidation program 2016 -2020. • Strengthen scheduling and control with a master schedule activity. • Implement improved standards for the quality control. • New organization of the Project Office section 14
Future Accelerator Studies 2016 -2020 SMB • Development of a new activity for the long term monitoring and maintenance planning of the existing tunnel infrastructures: Tunnel Asset Management. 15
Main projects SMB Approved B 245 Pending approval B 107 HL-LHC: Civil engineering design and construction B 311 New radioactive storage building Civil Engineering for the SPS dump EHN 1 extension LS 2 activities preparation and works (> 150) Polymer. Lab Building renovation of the AD target RWTC building B 867 bis LHCb - New computing farm ALICE - potential extension of the computer farm 32 2016 2017 CMS - Extension of assembly hall 147(1000 m 2) 2018 2019 2020 LS 2
LS 2 effort 32 SMB 147
Conclusion SMB • Rump up of the HL-LHC civil engineering effort. • Ring-fence resources required to carry out the consolidation activities. • Seize the opportunity to increase efficiency through supporting tools integration allowing automated control, scheduling and quality management in the overall execution of the technical services (converge to a common ERP solution with FAP and IPT). 18