Smart Metering Foundation Stage February 2013 1 2
Smart Metering Foundation Stage February 2013 1
2 Agenda • • File Format Changes for Effective Switching Back Population Approach for Effective Switching New File Type for Smart Switching Implementation Date for Smart Switching
3 Impacted File Formats for Effective Switching Phase of the Foundation Stage of SMIP • New Allowable Values (NS, S 1 & S 2) will be added to the following File Types: – Incoming: METER Dataset (ONJOB / ONUPD), M 79, M 82. – Outgoing: U 06, P 18, M 80, M 81, M 83, M 84, M 85, METER, MFX, MEX, S 75, M 03. • No change to existing Validations at File Type and Record Type Level. • No Change to Acceptance or Rejection Responses. • The Installing Supplier ID field will not be transferred by file flows, therefore there is no impact to file formats.
4 Impacted File Formats for Effective Switching Phase of the Foundation Stage of SMIP
5 Effective Switching Back Population Approach • SPAA Change creating Allowable Values is not implemented until 01/06/2013 • Challenges to activity due to the GRP implementation on 8 th/9 th June 2013. • Back Population proposed using ONUPD* • Analysis in progress to look at planned approach for volume of ONUPDs • Shippers to provide a sample file for testing * Option analysis requested – report back pending
New File Type for Smart Switching Phase of the Foundation Stage of SMIP 6 • INPUT – – A new reusable File Type and Record will be created to facilitate the transfer of the new SMSO ID and Effective Date data items for the Smart Switching phase. – The SMSO ID and SMSO Effective Date will be mandatory data items within the new record. • OUTPUT – – Not planned to have Output files for Foundation. – The SMSO Effective Date will not be played back for Foundation on DES. • MDD change proposal to be raised for new Market Participants for SMSO IDs. Values to be agreed with SMSO organisations and Xoserve to ensure values are unique.
7 New File Type for Smart Switching Phase of the Foundation Stage of SMIP • The File Level Validations: – The SMSO ID will be a 3 character text field – The SMSO Effective date will be standard date format (8 characters) • The Record Level Validations: – The SMSO IDs agreed with SPAA will form the allowable values. If a non allowable value is received the following error code will be generated and sent. Suggested code: Error Code: SMO 00001 Error Description: SMSO Does Not Exist • Note: There will be no validation to check if there is a corresponding Smart value in the Meter Mechanism Code when an SMSO ID is provided
8 Implementation Date for Smart Switching • Issue with AQ review impacting the planned Smart Switching Implementation Date of 01/10/2013 requiring Xoserve to implement outside of this window. – Proposed implementation in early Sept 13 outside of key AQ Review activities to protect the UK Gas Industry – System changes would be in place in advance of Shipper Licence Obligation to submit SMSO values from 01/10/13
- Slides: 8