SLAC National Accelerator Laboratory Undulator Complex Status LCLS
SLAC National Accelerator Laboratory Undulator Complex Status • LCLS Introduction – Layout – Responsibilities – Schedule • Undulator Complex Status • Outstanding issues Dec. 2, ‘ 08 Accelerator Readiness Review 1 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory Linac Coherent Light Source at SLAC Injector (35º) at 2 -km point Existing 1/3 Linac (1 km) (Commissioned in 2007 -8) New e- Transfer Line (340 m) X-ray Transport Line (200 m) Undulator (130 m) Near Experiment Hall (underground) X-Ray Transport/Optics/Diagnos Far Experiment Dec. 2, ‘ 08 David Schultz 2 Hall Accelerator Readiness Review (underground) DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory Commissioning responsibilities • Beam operations – Accelerator Systems Division (John Seeman) • Operates the Main Control Room • Operations adhere to the Beam Authorization Sheet • Schedules maintenance and repair • Manages the facilities • Commissioning Goals (Paul Emma) – LCLS Project Physics group • Schedules and organizes commissioning efforts to meet goals. • Radiation Safety measurements (Sayed Rokni) – Radiation Physics group • Performs measurements to confirm shielding efficacy • LCLS Project provides funding for commissioning activities Dec. 2, ‘ 08 Accelerator Readiness Review 3 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory CD-4 (7/31/2010) First Light in FEH Hutch BO X-Rays in NEH First Light in FEE Install Undulators FEE/NEH Install now LTU/Und Install PEP-II run ends LCLS Installation and Commissioning Time-Line PPS J F MAM J J A S ON D J F M AM J J A S OND J F MAM J J Down? 2008 2009 2010 Linac/BC 2 Commissioning Dec. 2, ‘ 08 Accelerator Readiness Review LTU/Und NEH Ops & Commissioning Re-establish FEL/FEE e- to SL 2 Commissioning 4 Nov. 3, 2008 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory SAD and ASE SLAC-I-010 -30100 -016_lclsundcomplexsad_text_r 000 Dec. 2, ‘ 08 Accelerator Readiness Review 5 SLAC-I-010 -30100 -000_lafase_text_r 001 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory LCLS beam limits from the ASE These are the power levels used in shielding design calculations. 1680 W is 1 n. C at 14 Ge. V at 120 Hz, Typical 2009 commissioning will be at ~100 W Dec. 2, ‘ 08 Accelerator Readiness Review 6 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory LCLS New Construction e- Beam Dump Front End Enclosure (FEE) Undulator Hall Beam Transport Hall Near Exp. Hall ac SLAC Lin Dec. 2, ‘ 08 Accelerator Readiness Review Undulator Complex 7 Far Exp. Hall Photon Systems David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory Beam Transport Hall Dec. 2, ‘ 08 Accelerator Readiness Review 8 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory Undulator Hall Dec. 2, ‘ 08 Accelerator Readiness Review 9 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory Undulator Magnet Installed Dec. 2, ‘ 08 Accelerator Readiness Review 10 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory Electron Beam Dump Area Dec. 2, ‘ 08 Accelerator Readiness Review 11 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory Undulator Complex Status • Installation complete – Vacuum, Magnets, Diagnostics, Safety Systems – Final alignment this week. • Systems’ checkout – Controls and Physics checkout is underway. • Safety Systems Initial Acceptance Tests – PPS, BCS Initial Acceptance Tests this week. Dec. 2, ‘ 08 Accelerator Readiness Review 12 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory Outstanding Issues (11 -25 -08) • Fire safety check-off – Fire systems commissioning through 11/26 • Final shielding – Final elements to be installed this week • Punch list closeout (a copy is on the web) – Some items need pre-start completion • Preparedness document sign-off – Final signatures are last-minute, inc. ASD • Beam Authorization Sheet (BAS) sign-off (ASD, RP) is the final link before operations Dec. 2, ‘ 08 Accelerator Readiness Review 13 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory LCLS New Construction e- Beam Dump Front End Enclosure (FEE) Undulator Hall Beam Transport Hall Near Exp. Hall Far Exp. Hall ac SLAC Lin Photon stoppers will be locked in until photon systems operations are authorized. Dec. 2, ‘ 08 Accelerator Readiness Review 14 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory Dump-FEE safety system layout Photon stoppers Dec. 2, ‘ 08 Accelerator Readiness Review 15 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory B 4 C • Stoppers must be able to withstand the allowed beam power (x-rays) indefinitely. B 4 C is placed on stoppers face to withstand the FEL beam • Damage threshold of B 4 C calculated to have a safety factor of ~10. • Have a test apparatus to confirm viability, with a B 4 C sample placed in the photon beam, for testing at increasing beam power density. • Detailed testing plan needed prior to installing Undulator magnets. Dec. 2, ‘ 08 Accelerator Readiness Review 16 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory Summary • The SAD and ASE for LCLS Undulator Complex commissioning are signed. • The Undulator Complex technical systems are installed and are being checked. • Safety systems are complete this week (some shielding installation and the IAT). – Completion will be verified through the BAS. • Accelerator Operations and maintenance will be done by experienced SLAC groups. • Plans are in place for the beam commissioning program. Dec. 2, ‘ 08 Accelerator Readiness Review 17 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory end Dec. 2, ‘ 08 Accelerator Readiness Review 18 David Schultz DCS@SLAC. Stanford. edu
SLAC National Accelerator Laboratory Layout of DLH, FEE, and NEH e- Beam Dump (DLH) NEH FEE Plan view BYDs – DC magnets Wall 1 Wall 2 PEPII ring road Hutch 1 Hutch 2 Elevation view Main dump line Dec. 2, ‘ 08 Accelerator Readiness Review Main dump 19 David Schultz DCS@SLAC. Stanford. edu