Site Signage Example Material Storage area Staff Car

- Slides: 1
Site Signage Example Material Storage area Staff Car Park B Site offices and Welfare Fire Assembly Point Staff Car Park A Site Signage Cont No: TBC Date: 26/01/17 Deliveries: Deliveries to be programmed in to avoid school drop off and collection times. Due to the restricted area deliveries will be called off on a ‘just in time’ basis, i. e. when they are required on site. Vehicle Access: The existing road will be utilised for vehicle access and egress under the direction of a banksman with traffic monitoring controlling traffic movements. Measures to avoid dirt and dust: Pressure washer to be located adjacent to the site entrance gates to ensure vehicle wheels are cleaned prior to exiting the site. Regular road sweeps are to be implemented to the surrounding highway network to keep clear of mud and debris. Dampening down in dry weather, sheeting of loose materials Site Notices: Site notices will be posted in the site office and canteen informing site operatives of agreed working hours, this will also form part of the induction process for all new operatives and visitors to site Site Waste: All waste will be segregated with a Site Waste Management Plan on site, monitored by Site staff Vehicle Gates Access and Egress Dwg No: 01 Contact Name: Mick Cunningham Contact No: 07795 520 727 Duration of Works: 44 weeks Typical Working Days: Mon - Fri: 7. 30 am – 5. 00 pm Sat: 7. 30 am – 12 pm No working Sundays or Bank Holidays Parking: As on-site parking is unavailable, contractors will be directed to New Street Car Park which is an 8 minute walk from the site. It will be acceptable to drop operatives and tools at the site prior to parking vehicle. No vehicles to be parked or block access to the undertakers access road adjacent to the site. Rev: - Job: Flintshire SHARP Scale: NTS Status: Const Title: Ysgol Delyn, Mold Drawn: MC