Simulating GWOS ADM and NWOS Coverage and accuracy

  • Slides: 22
Download presentation
Simulating GWOS, ADM and NWOS: Coverage and accuracy trades G. D. Emmitt and S.

Simulating GWOS, ADM and NWOS: Coverage and accuracy trades G. D. Emmitt and S. A. Wood Simpson Weather Associates WG on Space-Based Lidar Winds Monterey, CA 5 – 8 February 2008

Overview • Simulations for OSSEs and instrument design trades (e. g. IDL) – DLSM

Overview • Simulations for OSSEs and instrument design trades (e. g. IDL) – DLSM – OSSEs • • GWOS NWOS ADM Summary

DLSM and OSSEs • The DLSM has been fully upgraded to perform global simulations

DLSM and OSSEs • The DLSM has been fully upgraded to perform global simulations of the hybrid DWL • OSSEs for the hybrid are planned at NCEP using the new ECMWF T 513 and T 799 nature runs • Hybrid DWL OSSEs are in progress using the T 213 nature run at SIVO

Doppler Lidar Simulation Model

Doppler Lidar Simulation Model

Requirements

Requirements

Instrument parameters A: scaling factor = 3. 1 B: scaling factor 4. 3

Instrument parameters A: scaling factor = 3. 1 B: scaling factor 4. 3

ADM coverage

ADM coverage

ADM Molecular

ADM Molecular

ADM aerosol

ADM aerosol

GWOS 4 beam coverage

GWOS 4 beam coverage

GWOS Molecular (no cloud)

GWOS Molecular (no cloud)

GWOS Molecular 100

GWOS Molecular 100

GWOS Aerosol (no cloud)

GWOS Aerosol (no cloud)

GWOS Aerosol

GWOS Aerosol

GWOS Hybrid

GWOS Hybrid

NWOS 8 beam coverage

NWOS 8 beam coverage

NWOS Molecular (no cloud)

NWOS Molecular (no cloud)

NWOS Molecular 100

NWOS Molecular 100

NWOS Hybrid (background)

NWOS Hybrid (background)

TODWL ß 90

TODWL ß 90

Natural Variability of 2 mm Backscatter Volcanic Subvisual Cirrus Clouds Background Enhanced Mid-Upper Troposphere

Natural Variability of 2 mm Backscatter Volcanic Subvisual Cirrus Clouds Background Enhanced Mid-Upper Troposphere Maritime PBL Lower Troposphere Surface Continental PBL TODWL (5 km) Ocean Land 10 -11 10 -10 10 -9 10 -8 10 -7 10 -6 10 -5 Backscatter (m-1 sr-1) 10 -4 10 -3

Summary • Ready for “realistic DWL” OSSEs • Need consensus on NWOS instrument parameters

Summary • Ready for “realistic DWL” OSSEs • Need consensus on NWOS instrument parameters • SIVO OSSEs are moving forward • NCEP OSSEs are in preparation • NASA ROSES 07 funding likely for ADM follow-on OSSEs