Sevilla May 2011 WIOD 2 nd Consortium Meeting

  • Slides: 12
Download presentation
Sevilla May 2011, WIOD 2 nd Consortium Meeting 1 WP 4 Satellite accounts: environmental

Sevilla May 2011, WIOD 2 nd Consortium Meeting 1 WP 4 Satellite accounts: environmental indicators Iñaki Arto, Aurélien Genty Joint Research Centre (JRC) IPTS - Institute for Prospective Technological Studies

Outline Sevilla May 2011, WIOD 2 nd Consortium Meeting A. Satellite accounts 1. Update

Outline Sevilla May 2011, WIOD 2 nd Consortium Meeting A. Satellite accounts 1. Update of energy and air emission accounts 2. New accounts: resources extraction, land, water 3. Deliverables B. Linking the Environmental Satellites with the Prototype WIOD CGE Model (Simon Koesler, ZEW) 2

Sevilla May 2011, WIOD 2 nd Consortium Meeting 1. Update of energy and air

Sevilla May 2011, WIOD 2 nd Consortium Meeting 1. Update of energy and air emission accounts 3

Energy use Sevilla May 2011, WIOD 2 nd Consortium Meeting • Status on WIOD

Energy use Sevilla May 2011, WIOD 2 nd Consortium Meeting • Status on WIOD Energy use – – – • Main issues in September 2010’s release – – – • • • First release in June/July 2010 Update in September 2010 Currently updating Energy use to include January update of WIOD SUTs Negative/unrealistic assignments due to inconsistencies between IEA physical energy data and WIOD monetary data (SUTs) “Wrong” assignments (codes) EXIOPOL results unavailable Negative/unrealistic assignments Corrections on case-by-case basis “Wrong” assignments Improvement of code routines EXIOPOL results Energy use finally released (after delay) and information taken on board 4

Air emissions Sevilla May 2011, WIOD 2 nd Consortium Meeting • Status on WIOD

Air emissions Sevilla May 2011, WIOD 2 nd Consortium Meeting • Status on WIOD Air emissions – – – • Main issues in September 2010’s release – – • • First release in June/July 2010 Update in September 2010 Update of WIOD Energy use Update of WIOD Air emissions “Wrong” assignments Unavailability of EXIOPOL results “Wrong” assignments Improvement of code routines EXIOPOL results Air emissions finally released (after delay): to be taken on board 5

Sevilla May 2011, WIOD 2 nd Consortium Meeting 2. New accounts: resources extraction, land,

Sevilla May 2011, WIOD 2 nd Consortium Meeting 2. New accounts: resources extraction, land, water 6

Introduction Sevilla May 2011, WIOD 2 nd Consortium Meeting • WP 4 Description of

Introduction Sevilla May 2011, WIOD 2 nd Consortium Meeting • WP 4 Description of Work: – – • “WP 4 Objective: collect, process and organize a comprehensive set of satellite accounts (…) covering the main environmental indicators for which data of satisfactory quality are available”: § Energy & Air emissions § “Additionally, this work package will strive to include some water emissions, resource and land uses and the generation and treatment of various types of waste. However, the feasibility of this extension will have to be tested against the availability of data of acceptable quality. Also land use data by sector will be provided but probably with a less detailed industry allocation, depending on data availability. ” “With respect to data acquisition, this work package will extensively build on the deliverables of the FP 6 project EXIOPOL” Checked availability and quality of data: – – – Natural resources extraction Land use Water use 7

Natural Resources Extraction Sevilla May 2011, WIOD 2 nd Consortium Meeting • • 8

Natural Resources Extraction Sevilla May 2011, WIOD 2 nd Consortium Meeting • • 8 Source: SERI (www. materialflows. net) based on FP 5 -MOSUS, same as in EXIOPOL Time coverage: 1980 – 2007 Units: 1000 t Method: Direct allocation of resource extraction to corresponding sectors (NACE and WIOD sectors) Resource Categories NACE WIOD Biomass_animals sec 05 sec. At. B Biomass_feed sec 01 sec. At. B Biomass_food sec 01 sec. At. B Biomass_forestry sec 02 sec. At. B Biomass_other sec 01 sec. At. B Fossil_coal sec 10 sec. C Fossil_gas sec 11 sec. C Fossil_oil sec 11 sec. C Fossil_other sec 11 sec. C Minerals_construction sec 14 sec. C Minerals_industrial sec 14 sec. C Minerals_metals sec 13 sec. C

Land Use Sevilla May 2011, WIOD 2 nd Consortium Meeting • • 9 Source:

Land Use Sevilla May 2011, WIOD 2 nd Consortium Meeting • • 9 Source: Resource. STAT-FAO, same as in EXIOPOL Time coverage: 1961 – 2007 Units: 1000 hectare Method: Direct allocation of land use to corresponding sectors Land Categories NACE WIOD Agricultural_area sec 01 sec. At. B Forest_area sec 02 sec. At. B

Water Use Sevilla May 2011, WIOD 2 nd Consortium Meeting • Source: EXIOPOL •

Water Use Sevilla May 2011, WIOD 2 nd Consortium Meeting • Source: EXIOPOL • Time coverage: 2000 • Estimation rest of the years – – Sect 01 estimation based on Biomass extraction from WIOD Natural Resources accounts: Water. Usesec 01, t = (Water. Usesec 01, 2000 / Biomasssec 01, 2000) x Biomass. Extrsec 01, t Other sectors estimation based on WIOD Vale Added constant prices: Water. Usei, t = (Water. Usei, 2000 / VAi, 2000) x VAi, t • Units: 1000 m 3 • Categories (same as in EXIOPOL): – – – Water_blue: surface and ground water Water_green: rain water Water_total: water consumption of industrial sectors (no distinction between blue o green) 10

Sevilla May 2011, WIOD 2 nd Consortium Meeting 11 3. Deliverables

Sevilla May 2011, WIOD 2 nd Consortium Meeting 11 3. Deliverables

Database on environmental extensions Sevilla May 2011, WIOD 2 nd Consortium Meeting • Next

Database on environmental extensions Sevilla May 2011, WIOD 2 nd Consortium Meeting • Next release of the DB: – July 2011: § Energy use, Air emissions (3 th version) § Natural Resources Extraction, Land Use, Water Use (1 st version) • Final release of the DB (D 4. 4, month: 36): – May 2012: Environmental data updated based on: § Comments received § Availability of new data (e. g. update of WIOD SUTs) • Technical report on the compilation of the environmental satellites database (D 4. 5 month: 36) – Update Deliverable 4. 2 adding technical information on the compilation of “other environmental extensions” 12