Setting-up MSU & Equipment handling WFP Logistics, We Deliver

Setting-up MSU & Equipment handling WFP Logistics, We Deliver

Lesson Objectives By the end of this lesson, you will be able to: 1

Lesson Objectives By the end of this lesson, you will be able to: 1 Identify and assess equipment and verify completeness of inventory 2 Describe the process of frame layout and site layout 3 Assist with erection of storage equipment 4 Execute basis operations and recognize the maintenance needs for standard warehousing equipment (E. g. : Generators, security lights and forklifts)

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

WFP Kissidougou Forward Logistics Base Follow the link: https: //youtu. be/5 LKi 80 nggj.

WFP Kissidougou Forward Logistics Base Follow the link: https: //youtu. be/5 LKi 80 nggj. E? list=PLAKQZOExh 9 h Lwe. Frbi 9 QIBHfv. Vwbd. VM 5 E

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Mobile Storage Units (MSU) Assembly

Diesel generators The main components

Diesel generators The main components

Diesel generators The need for maintenance Preventive maintenance A-Check: Daily Routine Checks B-Check: Every

Diesel generators The need for maintenance Preventive maintenance A-Check: Daily Routine Checks B-Check: Every 300 -350 running Hrs C-Check: Every 800 -1500 running Hrs

Diesel generators The need for maintenance

Diesel generators The need for maintenance

Diesel generators The consumption calculation

Diesel generators The consumption calculation

Diesel generators The consumption calculation Rapid exercise in group: What is the total running

Diesel generators The consumption calculation Rapid exercise in group: What is the total running hours? What is the total fuel consumed? Whart is consumption per hours? What is the cosumption per day (8 hrs)? Solution: Total running hours (in time) 35: 35 Total running hours (in number) 35. 58 Total fuel (in liter) 77. 00 Consumption per hour 2. 16 Consumption per day (8 hrs) 17. 31

Diesel generators Forklifts Electric reach truck Order picking 1 – 2. 5 tons Electric

Diesel generators Forklifts Electric reach truck Order picking 1 – 2. 5 tons Electric Counter balance truck Stacking 2. 5 – 4. 5 tons Telescopic Handler Stacking 4 – 10 tons Inside Waherehouse Ideal on Emergency hubs Ideal on Emergency Hubs (Existing in rough terrain, 4 x 4 versions) Heavy duty Multi tasking

Handling Equipment Forklifts Follow the link: https: //youtu. be/d 1 u. EMJYLS 5 g?

Handling Equipment Forklifts Follow the link: https: //youtu. be/d 1 u. EMJYLS 5 g? list=PLAKQZOExh 9 h. Lwe. Frbi 9 QIBHfv. Vwbd. VM 5 E

Equipment handling exercises Forklift exercise: Participants are shown basic operations and go about a

Equipment handling exercises Forklift exercise: Participants are shown basic operations and go about a small circuit where they have to pick up an empty pallet and place on top of a stack of empty pallets. Generator exercise: As a group, participants are shown the components and the basic daily check routine. Individually and in turn, they have to demonstrate the daily check and explain to the facilitator what they are doing. Security lights: Participants have to deploy the light, do the daily routine checks and start the generator on the unit.

Setting-up an MSU and equipment handling The group will be led outside and will

Setting-up an MSU and equipment handling The group will be led outside and will start the MSU Assembly. From 09: 00 to 15: 00 – MSU Assembly (Lunch from 12: 00 to 13: 00) From 15: 00 to 17: 00 – Handling equipment (Split the group: Half on the Forklift and half on the generator and the security lights)

Questions WFP Logistics, We Deliver