September 2013 doc IEEE Omni RAN130069 r 0
September 2013 doc. : IEEE Omni. RAN-13/0069 r 0 Liaison Report for Omni. RAN EC SG Date: 2013 -09 -17 Authors: Submission Slide 1 Michael Montemurro, Black. Berry
September 2013 doc. : IEEE Omni. RAN-13/0069 r 0 Abstract This presentation contains the September 2013 liaison report for Omni. RAN EC SG. Submission Slide 2 Michael Montemurro, Black. Berry
September 2013 doc. : IEEE Omni. RAN-13/0069 r 0 Omni. RAN Activity in Nanjing • Reviewed the feedback from the July EC meeting • Reviewed feedback from IEEE 802. 1 face-to-face meeting. • Began development of a PAR and 5 C proposal to be submitted for approval by the EC in the November 2013 meeting. Omni. RAN is recommending that IEEE 802. 1 host the project. Submission Slide 3 Michael Montemurro, Black. Berry
doc. : IEEE Omni. RAN-13/0069 r 0 Omni. RAN EC SG Status • IEEE 802 EC Geneva Jul 13 closing meeting decision – Motion: • Develop a PAR and 5 C for an IEEE 802 Recommended Practice by Nov ‘ 13 – Potential title: ‘Network Reference Model and Functional Description of IEEE 802 based Access Networks’ • Similar to a ‘Stage 2’ specification • Suggest the best home for the project. • https: //mentor. ieee. org/omniran/dcn/13/omniran-13 -0057 -00 -ecsg-omniranec-closing-report. pptx – Omni. RAN EC SG got extension for creation of PAR & 5 C proposal (EC Motion passed by 13/0/1) – Tony Jeffree indicated that 802. 1 could be a “host” for this effort. • Omni. RAN scheduled a number of meetings for creation of PAR & 5 C until October 10 th, 2013 – See next slide Submission
doc. : IEEE Omni. RAN-13/0069 r 0 Filling the gap in IEEE 802 Mapping IEEE 802 specifications to service requirements • Direct evaluation of IEEE 802 protocols to address service/deployment requirements is challenging. ‘External’ requirements from the service/deployment perspective ? Develop a logical/functional model for evaluation of ? those requirements; Available IEEE 802 specifications of protocols and attributes. • A Stage 2 specification provides a mapping of protocols to a functional network model, which facilitates easier evaluation. Submission
doc. : IEEE Omni. RAN-13/0069 r 0 ‘Stage 2’ Definition by ITU-T I. 130/Q. 65 The Stage 2 defines • a functional model using functional entities, • the functional entity actions needed, • information flow or API calls between functional entities • recommendations for the allocation of functional entities to physical locations for a few examples. The Stage 2 provides • a single functional specification which can be applied in a number of different physical realizations, • a precise definition of functional capabilities and their possible distribution in the network to support the required network capabilities, • a detailed description of what functions, information flows and API calls will be provided, but not how they are to be implemented, • requirements for protocol capabilities as input to Stage 3 of the method. The output of Stage 2 is used by • protocol designers to specify the protocols between physical entities, • node designers to specify the functional requirements of the nodes, • network planners. Submission
doc. : IEEE Omni. RAN-13/0069 r 0 Omni. RAN Meetings until November 2013 as agreed in Aug 7 th conference call • Wed, Sep 4 th, 2013, F 2 F Meeting York, UK w/ remote participation • Tue, Sep 17 th, 730 -930 am ET/1930 -2130 Nanjing, F 2 F session w/ remote participation • Fri, Sep 27 th, 2013, 09 -11 am ET: Confcall • Fri, Oct 4 th, 2013, 09 -11 am ET: Confcall • Thu, Oct 10 th, 2013, 09 -11 am ET: Confcall • Fri, Oct 11 th, 2013, Co. B: Submission deadline for PAR to EC list • Mon, Nov 11 th, 0800 -1000 am CT: EC Opening Meeting Dallas F 2 F Meeting announcements, agenda proposals and dial-in details for all meetings are published on Omni. RAN web site. Submission
September 2013 doc. : IEEE Omni. RAN-13/0069 r 0 Omni. RAN Plan for November • Omni. RAN will address comments on PAR and 5 C document. • Omni. RAN is recommending that the PAR be assigned to IEEE 802. 1 by the EC. • Omni. RAN will submit a PAR and 5 C proposal for EC approval in the November 2013 meeting. Submission Slide 8 Michael Montemurro, Black. Berry
September 2013 doc. : IEEE Omni. RAN-13/0069 r 0 Reference Documents • Omni. RAN PAR and 5 C – https: //mentor. ieee. org/omniran/dcn/13/omniran-13 -0057 -00 -ecsgomniran-ec-closing-report. pptx – https: //mentor. ieee. org/omniran/dcn/13/omniran-13 -0068 -02 -ecsgseptember-2013 -nanjing-f 2 f-agenda-material. pptx – https: //mentor. ieee. org/omniran/dcn/13/omniran-13 -0070 -01 -0000 par-5 c-table-of-content. docx Submission Slide 9 Michael Montemurro, Black. Berry
- Slides: 9