September 2012 doc IEEE 15 12 0531 01
September 2012 doc. : IEEE 15 -12 -0531 -01 -004 m Project: IEEE P 802. 15 Working Group for Wireless Personal Area Networks(WPANs) Submission Title: TG 4 m 4 TV Closing Report for September 2012 Date Submitted: 20 September 2012 Source: Sangsung. Choi(ETRI) Contact: Sangsung. Choi(ETRI) Voice: +82 42 860 6831, E-Mail: sschoi@etri. re. kr Re: TG 4 m Closing Report for September 2012 Interim Meeting Abstract: Closing Report for TG 4 m Session in Palm Springs Purpose: TV White Space Amendment to IEEE 802. 15. 4 Notice: This document has been prepared to assist the IEEE P 802. 15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P 802. 15. TG 4 m Slide 1 Sangsung Choi(ETRI)
September 2012 doc. : IEEE 15 -12 -0531 -01 -004 m Meeting Goal This Week • Hear merged proposal presentations for baseline documents(FSK, OFDM, NB-OFDM, MAC, Ranging) • Adopt baseline documents • Hear presentations if any • Discussion on future efforts and next steps TG 4 m Slide 2 Sangsung Choi(ETRI)
September 2012 doc. : IEEE 15 -12 -0531 -01 -004 m Meeting Slots Mtg Monday Tuesday Wednesday • Hear Presentation if any • Discuss next step AM 1 AM 2 Thursday • Opening Logistics • Hear Presentation • Hear merged FSK NB OFDMPM 1 -PHY proposal • Hear merged OFDM-PHY PM 2 proposal TG 4 m • Hear merged presentations: MAC • Hear Presentation • Further Discussion Merged Proposals • Discuss Baseline Adaptation • Discuss Proposal Draft Preparation Slide 3 Sangsung Choi(ETRI)
September 2012 doc. : IEEE 15 -12 -0531 -01 -004 m TG 4 m Closing Report(1) • Heard 5 presentations for merged proposals - FSK-PHY, OFDM-PHY, NB OFDM-PHY, MAC, RANGING No Do. C # Title 1 15 -12 -0483 -00 -004 m tvws-fsk-merged-proposal-draft 2 15 -12 -0481 -01 -004 m ofdm-phy-merged-proposal-for-tg 4 m 3 15 -12 -0511 -01 -004 m tvws-nb-ofdm-merged-proposal-to-tg 4 m 4 15 -12 -0513 -00 -004 m merged-mac-proposal-summary 5 15 -12 -0473 -01 -004 m suggested-baseline-for-optional-tg 4 m-ranging Presenter (Affiliation) Cristina Seibert(SSN) Soo-Young Chang(SYCA) Hiroshi Harada(NICT) Benjamin A. Rolfe(BCA) Mi-Kyung Oh(ETRI) • Heard 2 presentations for contribution No Do. C # 1 15 -12 -0496 -01 -004 m State of TVWS 2 15 -12 -0369 -01 -004 m UC Proposal TG 4 m Title Presenter (Affiliation) George Flammer(SSN) Kuor-Hsin Chang(Elster) Slide 4 Sangsung Choi(ETRI)
September 2012 doc. : IEEE 15 -12 -0531 -01 -004 m TG 4 m Closing Report(2) • Motion for approving the baseline documents FSK PHY Merged Proposal document: 15 -12 -0483 -00 -004 m-tvws-fsk-merged-proposal-draft OFDM PHY Merged Proposal documents: 15 -12 -0480 -01 -004 m-task-group-15 -4 m-ofdm-merged-text-proposal 15 -12 -0481 -01 -004 m-ofdm-phy-merged-proposal-for-tg 4 m Narrowband OFDM PHY Merged Proposal document: 15 -12 -0511 -01 -004 m-tvws-nb-ofdm-merged-proposal-to-tg 4 m MAC Merged Proposal documents: 15 -12 -0512 -01 -004 m-tg 4 m-merged-mac-proposal 15 -12 -0513 -00 -004 m-merged-mac-proposal-summary Ranging Proposal document: 15 -12 -0473 -01 -004 m-suggested-baseline-for-optional-tg 4 m-ranging as the baseline for TG 4 m and authorize the editors to prepare a proposed draft for letter ballot from these documents. Moved by Clint Powell, Seconded by Sum Chin Sean Yes: 18, No: 4, Abstain: 2 18/4/2 - Motion Carries (81. 8%) TG 4 m Slide 5 Sangsung Choi(ETRI)
September 2012 doc. : IEEE 15 -12 -0531 -01 -004 m TG 4 m Closing Report(3) • Discussed future efforts and next steps - Editors will take the baseline documents and present it the during the November meeting. - The draft document should be provided on Sunday prior to the November meeting week • Meeting was adjourned early - Motion to adjourn the meeting Moved by: Ben Rolfe, Seconded by: Hiroshi Harada Motion was carried by unanimous consent TG 4 m Slide 6 Sangsung Choi(ETRI)
September 2012 doc. : IEEE 15 -12 -0531 -01 -004 m Future Plan/Timeline • Form a New Task Group - Affirm new officers for TG 4 m 2011 - Prepare the TGD - Finalizing the TGD & Call for Proposal September November, 2011, January 2012 March 2012 • Proposal Effort - Preliminary Proposals & Presentations - Final Proposals - Proposal Presentations - Merge Proposals - Adopt Baseline TG 4 m Slide 7 May 6 2012 July 9, 2012 July , 2012 September 2012 Sangsung Choi(ETRI)
September 2012 doc. : IEEE 15 -12 -0531 -01 -004 m Future Plan/Timeline(2) • Drafting - Preliminary draft - Final draft (ready for WG Letter Ballot) • Balloting - Letter ballot - Recirculation - Sponsor ballot - Recirculation TG 4 m November 2012 January 2013 March 2013 May, July, September, 2013 November 2013 January, March 2014 Slide 8 Sangsung Choi(ETRI)
- Slides: 8