Sector 20 Scope of Conventional Facilities Project Demolition of Existing 1700 ft 2 Alcove

Sector 20 Scope of Conventional Facilities Project Demolition of Existing 1700 ft 2 Alcove Bldg. Construction of New 2250 ft 2 Bldg. in ~ same location with 10’ extensions on ends. Steel Frame Building Modifications to existing foundation New HVAC and Electrical Service Interior Finishes Construction of New 300 ft 2 “RF Hut” in Klystron Gallery Some Cable Trays and Supports. Cabling to be designed by SLAC and installed by subcontractors as separate project. Surface mounted electrical distribution in injector alcove area. Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Jo Beth Folger jbfolger@slac. stanford. edu

Sector 20 Installation (future) Klystron Elev 0’ 0” Gallery N nnel Linac tu Existing

Sector 20 Installation (future) Klystron Elev 0’ 0” Gallery N nnel Linac tu Existing Stairs Elev. -35’ 0” Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Jo Beth Folger jbfolger@slac. stanford. edu

Sector 20 Conv. Facility Construction Areas Laser Facility N RF Hut Jan 26, 2005

Sector 20 Conv. Facility Construction Areas Laser Facility N RF Hut Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Jo Beth Folger jbfolger@slac. stanford. edu

Sector 20 Schedule & Cost Completion of Title II drawings January 2005 Bid and

Sector 20 Schedule & Cost Completion of Title II drawings January 2005 Bid and contract with general contractor February – March 2005 Construction April 2005 – April 2006) Total Estimated Cost - $1. 6 M $1. 0 M const, $0. 2 M LCW, $0. 3 M elec. LLP, $0. 1 M prep Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Jo Beth Folger jbfolger@slac. stanford. edu

Magnetic Measurement Facility Uses Undulator magnet tuning – 2 magnet measuring machine test stands

Magnetic Measurement Facility Uses Undulator magnet tuning – 2 magnet measuring machine test stands Aligned with same orientation to Earth’s magnetic field as LCLS Undulator Hall. Undulator fiducialization – large coordinate measuring machine Cradle assembly area Magnet storage/temperature acclimation Work desks in lab and office space for 2 employees Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Jo Beth Folger jbfolger@slac. stanford. edu

MMF Building Criteria ~4800 sq. ft. floor space (inc. ~3000 laboratory space) + mezzanine

MMF Building Criteria ~4800 sq. ft. floor space (inc. ~3000 laboratory space) + mezzanine Locate within an existing building to aid in temperature control Adequate ceiling height for overhead cranes Accessible for magnet delivery using trucks and forklifts Availability of required utilities, esp. electrical service – 600 A, 480 v 3 f Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Jo Beth Folger jbfolger@slac. stanford. edu

Building 081 Site Layout Jan 26, 2005 Review of Bldg Requirements (S 20, MMF)

Building 081 Site Layout Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Jo Beth Folger jbfolger@slac. stanford. edu

Building 081 Current Uses Jan 26, 2005 Review of Bldg Requirements (S 20, MMF)

Building 081 Current Uses Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Jo Beth Folger jbfolger@slac. stanford. edu

New Space Allocation for Bldg. 081 Jan 26, 2005 Review of Bldg Requirements (S

New Space Allocation for Bldg. 081 Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Jo Beth Folger jbfolger@slac. stanford. edu

MMF Ground Floor Plan Jan 26, 2005 Review of Bldg Requirements (S 20, MMF)

MMF Ground Floor Plan Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Jo Beth Folger jbfolger@slac. stanford. edu

Rear Elevation Mechanical Access Roll up door for magnet delivery Jan 26, 2005 Review

Rear Elevation Mechanical Access Roll up door for magnet delivery Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Staff access Jo Beth Folger jbfolger@slac. stanford. edu

MMF Schedule & Cost Completion of Title II drawings January 2005 Bid and contract

MMF Schedule & Cost Completion of Title II drawings January 2005 Bid and contract with general contractor February – April 2005 Construction May – November 2005 (Early Finish) February 2006 (Beneficial Occupancy) Total Estimated Cost - $ 2. 0 M $1. 4 M const. , $0. 5 M elec. LLP, $0. 1 M prep Jan 26, 2005 Review of Bldg Requirements (S 20, MMF) Jo Beth Folger jbfolger@slac. stanford. edu