SDT DT Series Product Introduction V 3 0

  • Slides: 25
Download presentation
SDT & DT Series Product Introduction V 3. 0

SDT & DT Series Product Introduction V 3. 0

Product Features Maximum Efficiency up to 98. 3% 45°C full-load output (environmental) European Efficiency

Product Features Maximum Efficiency up to 98. 3% 45°C full-load output (environmental) European Efficiency up to 98% IP 65 dust-proof and waterproof MPPT Efficiency up to 99. 9% Multiple monitoring and communication

1. 4 Technical Parameters

1. 4 Technical Parameters

Technical Parameters Ø Good. We SDT 4~15 k. W Technical Parameters

Technical Parameters Ø Good. We SDT 4~15 k. W Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters Ø Good. We DT 15~25 k. W Technical Parameters

Technical Parameters Ø Good. We DT 15~25 k. W Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

Technical Parameters

2. 1 Hardware Installation Guide

2. 1 Hardware Installation Guide

Hardware Installation Guide Open Box Communication Terminals Connection Accessories Check Wall-mounted Bracket Installation AC

Hardware Installation Guide Open Box Communication Terminals Connection Accessories Check Wall-mounted Bracket Installation AC Terminals Connection DC Terminals Connection SDT Installation

Hardware Installation Guide l You may need below tools when you install the EM

Hardware Installation Guide l You may need below tools when you install the EM Wire stripping pliers Drilling tool Straight screwdriver Line pressing tools Cross screwdriver Knife

Hardware Installation Guide Step 1:Open box

Hardware Installation Guide Step 1:Open box

Hardware Installation Guide Step 2: Accessories Check 1 AC Termin al x 6 6

Hardware Installation Guide Step 2: Accessories Check 1 AC Termin al x 6 6 3 2 3 6 PIN Termina l 4 2 PIN Termina l 4 8 2 Pan head screw × 5 10 9 Expansion Bolts × 6 5 Negativ e DC Plug Positive DC Plug Wallmounted Bracket x 1 7 1 Wi. Fi Module × 1 AC cover × 1

Hardware Installation Guide Step 3: Wall-mounted Bracket Installation 1. Holes location 2. Drill holes

Hardware Installation Guide Step 3: Wall-mounted Bracket Installation 1. Holes location 2. Drill holes 3. Six holes 4. Expansion bolts fixed 5. Wall-mounted Bracket installation 6. Done

Hardware Installation Guide Step 4: SDT Installation 1 Right side 2 Left side 3

Hardware Installation Guide Step 4: SDT Installation 1 Right side 2 Left side 3 Down side Overview

Hardware Installation Guide Step 5: DC Terminals Connection 1 10 Note : 2 9

Hardware Installation Guide Step 5: DC Terminals Connection 1 10 Note : 2 9 3 4 8 Before connecting PV string, make sure DC switch is turned off. 5 7 6

Hardware Installation Guide Step 6: AC Terminals Connection 1 10 2 9 3 4

Hardware Installation Guide Step 6: AC Terminals Connection 1 10 2 9 3 4 5 8 7 6

Hardware Installation Guide Step 6: AC Terminals Connection Ø The SDT&DT inverter’s on-grid cables

Hardware Installation Guide Step 6: AC Terminals Connection Ø The SDT&DT inverter’s on-grid cables L 1 , L 2 , L 3 and N need to go through a 40 A outside breaker which is showed as right picture to connect to the grid;

Hardware Installation Guide Step 7: Communication Terminals Connection Ø If you use Wi. Fi/GPRS

Hardware Installation Guide Step 7: Communication Terminals Connection Ø If you use Wi. Fi/GPRS module for communication , please refer to below steps for connection.

Hardware Installation Guide Step 7: Communication Terminals Connection Ø If you use RS 485

Hardware Installation Guide Step 7: Communication Terminals Connection Ø If you use RS 485 for communication , please refer to below steps for connection. Inverter side: 1 2 3 4 5 Ez. Logger Pro side: 1 If you use 6 PIN connector , the way to make the connector is the same. 4 5